The opening of a brand-new school building in the centre of Assenede in January also marked the start of a new way of teaching at VBS Het Ooievaarsnest. The school moved away from the traditional year-group system, and with it the typical infrastructure associated with that approach. It was a challenging project that called for a fresh perspective on architecture and construction.
Flexible design supports new ways of learning
For the children at the nursery and primary school VBS Het Ooievaarsnest in Assenede, 2022 got off to a positive start. After just under a year and a half, the new school building was ready for them to move in. VBS Het Ooievaarsnest no longer follows the traditional year-group system, instead organising pupils into living and learning groups spanning two birth years. This innovative approach was reflected in an infrastructure featuring separate teaching spaces and large learning areas, designed to encourage both independent, individual learning and teamwork.

This clear vision had to be translated into a well-considered design, followed by flawless execution. TenW architecten adviseurs translated the client’s wishes into a transparent, sustainable building featuring plenty of glass and natural materials. Main contractor Alheembouw was responsible for constructing the school and landscaping the grounds up to the adjoining park. The project was delivered using a construction team approach. “This allows room for certain aspects to be adjusted during the construction phase,” says Lukas Minnebo of Alheembouw. The construction company has more than ten years’ experience in building schools and campuses. “We always work closely with the school board and architect, looking for suitable solutions at every stage of the project. Or we suggest an optimisation ourselves if we see that something could be done better.”

Plenty of natural light
Het Ooievaarsnest is characterised by abundant natural light and the use of natural materials and colours. The striking timber elements on the façade echo the beauty of the surrounding park. The new school building has three floors. On the first floor, which houses the learning areas for the oldest nursery children and the first year group, part of the terrace is covered. This terrace, or playground, is separated from the interior spaces by a full-height curtain wall. “This creates a particularly pleasant effect, both inside and out, especially when combined with the beautiful view of the park behind the school,” adds Lukas Minnebo.

The second floor projects out at both the front and rear. The building also features several double-height spaces. “This added complexity to the structural design, which is why a lot of concrete walls were used on the second floor.” The construction team opted for a combination of underfloor heating with gas condensing boilers and heat pump water heaters for the domestic hot water supply.
Open structural frame
Drawing on its many years of experience in school construction, Alheembouw created a relatively open structural frame. Lukas Minnebo explains: “In schools, we generally use very open spaces in terms of the structural frame. That means using columns, with beams and profiles placed on top. The floor slabs are then installed above them. We divide this open structure using stud walls. In the long term, this makes a real difference to the building’s functionality. Removing a stud wall is much easier than demolishing a brick wall.”


The layout of VBS Het Ooievaarsnest differs from that of a traditional school. “To support the required ways of learning, the rooms had to be flexible. We therefore used movable walls and partition walls in several areas. These can divide a space into several separate rooms or open it up into a single learning area, tailored entirely to the needs of the learning groups.”
Question about this story? Ask your question
Who worked on it
VBS Het Ooievaarsnest in Assenede
- architectTenW architecten adviseurs
- main contractorAlheembouw
Keep following this
Get an email when a new story is published. No account needed.
- ProjectVBS Het Ooievaarsnest
- SubjectGeneral
- CompanyTenW architecten adviseurs