Pushing the boundaries of functional industrial construction

Aventi’s new headquarters goes beyond the definition of functional industrial construction. The industrial hall, office complex and caretaker’s residence come together in a striking architectural whole that exudes progressiveness and creativity. Naturally, all this is combined with sustainable technologies, as the building also reflects the expertise of the HVAC specialist.

Aventi’s new base is located on the ‘Beerse-Zuid’ regional business park, on a previously undeveloped 6,500 m² site. Its prominent position on the N12 and access from Biezenstraat mean that the site has no real back. “We therefore had to develop a concept that would look attractive from every side,” says Tom Reynders of TRiAS architecten.
“That was not the easiest brief, because the main function of the new-build project had to be an industrial hall with a warehouse. In consultation with Aventi, we decided to combine functional industrial construction with architecture that catches the eye and showcases the innovative character of the HVAC specialist.”

Emphasis on the corners
The 4,000 m² industrial hall, which rises 12 metres above ground level at its highest point, was built with a concrete structure. “We chose a finish of glossy profiled stainless-steel cladding by ArcelorMittal above a black exposed-aggregate concrete plinth,” says Tom Reynders. “All the doors and gates were given the same black finish, creating a neutral, abstract whole. On the first floor on the south and west sides, we included a caretaker’s residence with large glazed areas and a spacious terrace. This concept allowed us to create an attractive open corner of the building. We opened up the other corner at the bottom. This is where we created the entrance, which leads to the office area facing the N12. This location is also distinguished by a vertical accent that draws attention from every side: a volume containing meeting rooms and a roof terrace, notable for its sculptural façade elements. It is finished with metal fins that emphasise its verticality and extend above the terrace. The absence of a visible roof edge on the warehouse makes the whole building even more abstract. This corner feature makes the building highly recognisable, even at night, when the fins are illuminated by LED strips.”

A comfortable interior
The ground floor facing the N12 houses an attractive reception area and a number of offices. A technology centre was created on the first floor, while the corner feature serves as a meeting and reception area. Tom Reynders: “Aventi’s brand identity is clearly reflected in the interior. The fixed elements follow a neutral palette of oak combined with white, grey and black. The office walls are clad with acoustic panels to ensure maximum comfort at work. Their horizontal oak slat pattern also creates a striking interior feature.”

Progressive sustainability
Sustainable use of space is encouraged on plots at the ‘Beerse-Zuid’ industrial estate. The various industrial halls, for instance, are built next to one another. Particular attention therefore had to be paid to the siting of Aventi’s new
base. “Quite apart from that, we always make a conscious choice to use materials with a low environmental footprint wherever possible,” says Tom Reynders. “We also installed vertical aluminium fins in the meeting rooms and training centre
to serve both an aesthetic and a functional purpose.” Kris Smans, managing director of Aventi, continues: “The building is naturally also a showcase for sustainable technologies. Heating and cooling are provided by a BEO field and heat pumps, combined with concrete core activation. The thermal mass of the concrete structure is therefore used for climate control. The office building’s Type D ventilation system is equipped with heat recovery, recovering heat from the treated exhaust air. Crucially, energy management is handled by a clear building management system, bringing the heat pumps, solar panels and charging points together as one. Because using energy intelligently is the future.”
Question about this story? Ask your question
Who worked on it
- ClientAventi (Beerse)
- ArchitectTRiAS architecten (Turnhout)
- Main contractor(s)Cuylaerts Industriebouw (Lille)
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral