De terrassen domineren mee de look van de gebouwen.
De terrassen domineren mee de look van de gebouwen.

Four identical blocks, each rotated by a quarter turn to create a dynamic appearance and a unique identity. These are the new Blauwe Poort residences in the Duivenkeet social housing district.

The project comprises sixty homes and stands out above all for its high-quality finishes and practical layouts.

A large underground car park forms the foundation of this construction project. One of the four apartment blocks is positioned at each corner of the square. Residents can park their cars in the car park, which also has sockets for charging electric mobility scooters, among other things. “The concept of placing the four blocks at the corners of the underground car park made construction quite a challenge,” says Patrick Lauwers, project manager at Algemene Bouw Maes. “We used pile foundations beneath the car park, but also, in part, foundations up to ground-floor level, which support the apartment blocks. Not everyday work.”

A combination of smooth and matt bricks gives the façades a dynamic appearance.

Architecture with a subtle twist

With its identical blocks and light off-white facing bricks, Blauwe Poort does not stand out through grand, exceptional architectural flourishes, but rather through creative choices. The façades, for example, combine smooth and matt bricks, giving the buildings a dynamic appearance. The building volumes themselves are identical, but each is rotated by 90 degrees. Each apartment block therefore literally presents a different aspect, in the form of a different façade. As you approach the building, you can take in each façade at a glance. A pleasant, green courtyard unfolds between the buildings.    

Abundant light and space make Blauwe Poort a comfortable place to live.

“This social housing project makes no compromises on quality”

Efficient construction technique

Within the context of this social housing project, the focus remained firmly on quality, while meeting a short construction deadline. Patrick Lauwers explains: “We built the non-load-bearing internal walls using full-storey-height glued aerated concrete panels instead of gypsum blocks. As the contractor, we suggested this efficient construction technique ourselves.” The apartments feel spacious thanks to abundant natural light and intelligent layouts. Alongside the utility cupboard, there is a second storage room, with ample scope for storage or for creating a laundry room. With cupboards on both the kitchen and living room sides, future residents will never be short of storage space. The ceramic tiles, which appear to continue out onto the terrace, suit any type of interior.

The four identical buildings are each rotated by a quarter turn.

Raes G. Schrijnwerken: internal doors and suspended ceilings
More than five hundred standard internal doors and metal frames, fire doors with stylish laminate cladding, numerous curtain pelmets and many metres of suspended plasterboard ceilings. The team at Raes G. Schrijnwerken in Wervik, a trusted partner on numerous projects for more than two decades, had its work cut out during the construction of Blauwe Poort in Bruges. Experienced joiners installed the internal doors and ceilings. “It went very smoothly, thanks in part to the good communication across the entire construction team,” emphasises Davinia Galloo. “The site was very well organised. The schedule was followed closely and communication was open and clear. Despite the scale of the project, we managed to achieve a short turnaround time, with a very good result!”

Blauwe Poort does not stand out through grand, exceptional architectural flourishes, but rather through creative choices.

Connected to the district heating network

The district has no gas connection, nor does it need one. The sixty new apartments are heated by IVBO’s district heating network. An individual heat exchanger supplies underfloor heating in each home via a pipe carrying water at 60 °C. The water is heated using waste heat from the incinerator, making these residences an immediate example of sustainable construction and living. A statement of intent by the Brugse Maatschappij voor Huisvesting, brought to life by Algemene Bouw Maes.  

Client
Brugse Maatschappij voor Huisvesting (Brugge)
Architect
Gino Debruyne & Architecten (Brugge)
Main contractor(s)
Algemene Bouw Maes (Gent)

Question about this story? Ask your question

Wie aan Blauwe Poort werkte

  1. clientBrugse Maatschappij voor HuisvestingIn this story
  2. architectGino Debruyne & ArchitectenIn this story
  3. main contractorAlgemene Bouw MaesIn this story
  4. binnendeuren en verlaagde plafondsRaes G. SchrijnwerkenIn this story
  5. warmtenetIVBOIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBlauwe Poort
  • SubjectGeneral
  • CompanyBrugse Maatschappij voor Huisvesting
  • CompanyGino Debruyne & Architecten
  • CompanyAlgemene Bouw Maes
  • CompanyRaes G. Schrijnwerken
  • CompanyIVBO
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.