Spacious station car park in the city centre

A three-level underground car park with no fewer than 889 spaces has been built in the station area of Kortrijk. The concept was a conventional one, but its execution was anything but. It was a first for the contractors involved, who completed the project after three years of hard work.

Antwerpse Bouwwerken built the underground car park in collaboration with its sister company Vuylsteke. The car park was delivered through a partnership between NMBS, Infrabel, De Lijn, the city of Kortrijk, the Agentschap Wegen en Verkeer and Parko. The project forms part of the master plan to redevelop the station area in Kortrijk. The works involved excavating 130,000 cubic metres of earth. And there are more impressive figures: the project also required 11,300 square metres of diaphragm walls, 17,350 cubic metres of concrete and 4,350,000 kilograms of reinforcement.

Building from the top down
Antwerpse Bouwwerken is a general contractor with extensive experience across a range of construction disciplines. Although a station car park of this scale was not new to the company, the project called for an unusual approach. The limited space in the city centre meant the contractor had to use an innovative technique. The car park was excavated using the top-down method. “Essentially, you build from the top down, starting with the roof slab and the foundation walls,” explains Nico Godderis, production director at Antwerpse Bouwwerken. “The three levels below are then excavated one by one. We knew the technique, but this was the first time we had used it ourselves. This construction method presents logistical and technical challenges, but it was essential in these circumstances. An excavation pit would have been too large for the space available in the centre of Kortrijk. We were able to use the roof for heavy transport at an early stage. This approach also ensured the stability of the surrounding infrastructure. That is always important, but particularly crucial next to the railway tracks. It is a great experience to complete a project in a different way for once. And everything went well. Excavation was even a little quicker than expected. That gives us confidence.”

Concrete takes centre stage
The concrete had to meet demanding requirements. That is only right, agrees Nico Godderis. “Getting the concrete mix right is fundamental. We adapt the formwork methods accordingly and pay extra attention to concrete placement.” The car park is defined by clean lines and a high standard of finish. Epoxy, steel and glass details make it an impressive architectural project. A large glass wall brings colour and natural light into the car park. “This is not a conventional enclosed box of a car park. Large open spaces give the structure a lively feel, while painted walls bring in colour. When the light falls just right, it creates unique patterns on the concrete.” Another distinctive feature is the bus lane that runs through the car park, from level -1 up to the roof slab. “We can be proud to add this project to our portfolio. Concrete takes centre stage in a refined overall design,” concludes Nico Godderis.

Question about this story? Ask your question
Who worked on it
Ondergrondse parking NMBS Kortrijk in Kortrijk
- ClientNMBS Stations (Brussel)
- ArchitectEurostation (Brussel)
- main contractorTM AB-Eiffage
- main contractorVuylsteke-Eiffage
- main contractorAntwerpse Bouwwerken
Keep following this
Get an email when a new story is published. No account needed.
- ProjectOndergrondse parking NMBS Kortrijk
- SubjectGeneral
- CompanyNMBS Stations (Brussel)
- CompanyEurostation (Brussel)
- CompanyTM AB-Eiffage
- CompanyVuylsteke-Eiffage