To guarantee better service and keep energy bills under control, Aarschot Town Hall underwent a complete transformation. Every floor was thoroughly renovated and given a sustainable, modern makeover. The exterior also received a completely new look thanks to an imposing curtain wall. The result is a forward-looking service centre that can hold its own against a new-build.
The town hall, which dates from 1976, had seen better days. Its layout no longer met the needs of a modern public service, its appearance was dated and energy costs were high. The town council therefore decided to carry out a thorough renovation. To avoid having to move services to another location, the work was completed in several phases, with the windows replaced each time by a CW 50-HI curtain wall system from Reynaers. Project manager Wen Kelgtermans explains: “Although we started with the ground floor, we then worked from the top down. By connecting the roof covering directly to the curtain wall, we were able to prevent water from seeping into the floors below. We installed the curtain wall profiles to the full height of each floor, with each phase taking less than fifteen days. First, we fitted temporary seals on the inside against the existing timber window frames. We then removed the external glazing, installed the curtain wall and fitted the new glass. The process ended with the removal of the temporary seals and the dismantling of the old window frames. It is also worth noting that the exterior of the curtain wall is finished with a combination of standard and recessed pressure plates. These are 30 cm wide, creating a kind of ‘fins’ that give the building a distinctive appearance.”

An optimised layout increased the usable floor area to 2,000 m²
Completely refurbished
Every floor was stripped back completely and redesigned ‘from scratch’. The building services were replaced while the town hall remained operational. “While work was under way on the ground floor, we installed the new heating units on the roof,” says Wen Kelgtermans. “We then connected the system to the new heat emitters floor by floor via a central services shaft. The old boilers were not removed and a new ventilation unit installed until the very end. In that first phase, we also installed the main sanitary pipework, then connected it to the new route on each floor. The data, telephone and electricity systems were switched over at weekends. We also clad the other façades with insulation and ceramic tiles, added an extra fire escape and ensured that all floors were compartmentalised and a triangular canopy was installed at the front.”

The pressure plates create an attractive accent. At 30 cm wide, they form a kind of ‘fins’ on the façade.
A challenging job, well done
Thanks to this thorough renovation, Aarschot now has an attractive town hall that is also ideally suited to further energy-efficient upgrades. In addition, the optimised layout has increased the usable floor area to 2,000 m². “Keeping the service centre operational throughout made this a particularly challenging project,” concludes Wen Kelgermans. “However, our expertise and, above all, extensive preparatory studies enabled us to bring this complex project to a successful conclusion.”
Have a business enquiry for Reynaers Aluminium? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral
- CompanyReynaers Aluminium