VRT selects VRT Morgen consortium to build a new compact, horizontal building

VRT has selected a partner to build its new headquarters. The contract has been awarded to the construction team comprising OFFICE Kersten Geers David Van Severen, Jaspers-Eyers Architects, Bureau Bas Smets, Tractebel, CES, Ideal Acoustics, Willemen Construct, Jan De Nul Group and EEG. Under the name VRT Morgen, they are joining forces to deliver the new VRT headquarters, which the public broadcaster can move into from summer 2026. The new media centre places a strong emphasis on flexibility and collaboration, with spaces for VRT staff to meet at its heart. It is a compact, accessible building made up of two stacked volumes. The structure is defined by a ground floor with a mezzanine and just three upper storeys, each measuring 87 x 87 m. Green spaces will flourish in and around the new VRT headquarters.
The call for candidates for the new-build project, which is part of the transformation of the Reyers district and the development of mediapark.brussels, opened in February 2020. Seven construction teams submitted applications under a Design & Build formula. A competitive dialogue was held with a number of these candidates in recent months. Following this negotiation process, VRT’s Board of Directors and management opted to award the contract to the VRT Morgen construction team. The contract was put out to tender just over a year ago, with a maximum construction cost of 133.5 million euros. VRT Morgen will deliver the building for a construction cost well within the stated contract budget.
Luc Van den Brande, Chair of the VRT Board of Directors: “VRT has chosen a beautiful, strong design in which staff will feel at ease and able to be creative. The decision to choose the Reyserssite once again for this project is linked to the importance of ensuring that the Flemish Community continues to take responsibility in Brussels. As the largest Flemish cultural institution, VRT is not abandoning Brussels, and is further strengthening the ties between Flanders and Brussels. The new building will be not only a broadcasting centre, but also an open house for all Flemish people.”
The new management agreement prepares VRT for the future, and this building is the perfect home for it.
Benjamin Dalle, Flemish Minister for Brussels, Youth and Media: “With the completion of the new building, our public broadcaster is taking another major step towards the future. A modern media company deserves the best possible infrastructure. The new building will be a landmark in the Brussels media hub. On the iconic Reyerslaan, alongside the familiar tower, a modern, sustainable media building will respond to the latest developments in the media landscape. It is clear that VRT will undergo far-reaching change in the years ahead. The new management agreement set this change in motion, and it will soon become highly visible with the new building. It will also provide VRT staff and partners with a pleasant, modern workplace.”
Kristiaan Borret, Brussels Bouwmeester: “The new VRT headquarters is a high-quality building that meets contemporary architectural expectations. It fits perfectly into the urban context and the surroundings of the Reyers site.”
“A building that encourages a new way of working together”
The new VRT headquarters has a floor area of 65,000 m², of which 40,000 m² is above ground. It will remain on the current site on Reyerslaan and is described as a horizontal building made up of two stacked volumes. The first, octagonal volume forms the base. It contains a spacious lobby, numerous meeting places for staff and visitors, and three large television studios. Above it sits the second volume, the work field, consisting of just three storeys. Each storey is a particularly spacious work floor, a square measuring 87 m x 87 m where collaboration is central. VRT is a creative home, and in future it will be easy to create content on every office floor. Flexibility and media production go hand in hand. The new VRT headquarters is aiming for an A++ accessibility rating, signifying excellent access for visitors and staff.
“We have chosen a horizontal building that will foster a new way of working together and break down silos between our departments,” says VRT CEO Frederik Delaplace. “Our people will literally work together on large work platforms that can adapt flexibly to the way media evolves over the coming decades. The building will create a new environment for staff: a place where creativity and interaction are central, and where we can make media anywhere.”
A sustainable building with five courtyards and a compact footprint
The new VRT headquarters is a compact building integrated into its natural surroundings, with a limited ecological footprint. The project aims to preserve as many existing trees as possible, while the new building will be 100% fossil-fuel-free. It will have a well-insulated building envelope and will be heated entirely using recovered heat and heat pumps. The roof will also feature 2,300 m² of solar panels to support the electrical systems.
VRT is also opting for a green building in the literal sense, with five large courtyards and adjoining terraces. Together with the trees and park, they will create a distinctly green environment, both inside and out.
Move planned from summer 2026
The construction team aims to get started as soon as possible. Over the coming months, VRT staff will be closely involved in deciding how the brands and departments will be arranged in relation to one another. Meanwhile, the planning application is being prepared. Once the permit has been issued, the exact start date for the work will be set. The aim is to move in from summer 2026.
The new VRT headquarters
The new VRT headquarters is a versatile building, both literally, with its octagonal base volume, and figuratively. It is the ideal place to make media, a home for staff and a meeting place for visitors.

Base: The base is an octagonal volume designed to connect with its surroundings. It includes a spacious, welcoming reception area, a 500 m² event space, a staff restaurant, three large television studios and logistical work areas such as loading and unloading zones, the control room and dressing rooms. Parking will be underground.`
Field: The field above the base comprises three storeys, or work floors, punctuated by five courtyards. Collaboration and meeting are central to these three open work floors. The news studio and radio studios are located here, and it will also be easy to produce media, as various media facilities are integrated into the work floor. There will also be spaces for working together, brainstorming and working quietly, depending on what staff are looking for.
Kersten Geers (Architect, OFFICE Kersten Geers David Van Severen): “VRT will soon be housed in a compact, horizontal building. It is a little like a VRT tower laid on its side, because the building is almost as wide as the tower is tall. This volume is like an entire plot layout, a field for all VRT brands and departments. The media field is supported by a versatile base.”
David Van Severen (Architect, OFFICE Kersten Geers David Van Severen): “The new VRT is a culture factory, a studio for making media. Wherever you want. And everyone is close to one another. No distance, but collaboration, discussion and creativity. The many gardens inside the building and the magnificent trees around it create a completely new and inspiring environment.”
John Eyers (Architect, Jaspers-Eyers Architects): “The design is all about people meeting. An open central staircase connects the work floors and communal areas. Interaction is also central here, thanks to the various gardens and pleasant meeting places.”
Bas Smets (Landscape Architect, Bureau Bas Smets): “The building is arranged around five spacious courtyards, accessible from the work areas. Lush vegetation filters the daylight and purifies the air. The building has been positioned cleverly on the site to preserve as many of the large existing trees in the park as possible. As a result, it overlooks the existing public park while also offering views into the secluded gardens at its heart.”
The central concept in 6 images
The new VRT headquarters is a horizontal building with a total floor area of around 65,000 m², of which 40,000 m² is above ground. It consists of two stacked volumes. The ground floor has a highly welcoming reception area facing the media square, the city and the park. There are also three open, spacious storeys where meeting and collaboration are central. Departments and management teams are closer together, and many more people work on each floor, bringing VRT staff closer both literally and figuratively.

The main entrance is on the new media square, opposite the new RTBF building. The VRT headquarters aims to be an open, welcoming and accessible meeting place for staff and visitors. Everyone is welcome, and the entrance hall reflects this. The building’s glass walls offer a unique view into the media centre and make transparency a literal feature of the design. The main entrance is in a green, car-free zone where cyclists and pedestrians can move around safely. The building provides ample cycle parking, along with facilities including showers and lockers.

The hall can be likened to a lively market square, the vibrant heart of the new media centre. The reception area features a central open staircase leading to the various floors. There are plenty of coffee corners and meeting places where VRT staff and visitors can get together.
The spacious lobby flows into the staff restaurant, which opens onto a large outdoor terrace. There is also a comfortable reception area for studio audiences attending a recording, as well as a large event space for public events. This will make the building accessible to visitors, for example those attending a performance.

The new building is first and foremost a creative space, with a strong focus on flexibility and media production. Media can be made throughout the building, with all the necessary facilities and tools available everywhere.
The five green courtyards, each measuring 14 x 22 metres, are embedded in the core of the building and each has its own identity, with native trees and shrubs. The adjoining terraces are freely accessible, creating a pleasant, inspiring and, above all, green working environment.

The news studio is located in the middle of the work field, on the second floor. A glass wall connects the studio to the heart of the newsroom. The radio studios and flexible spaces for creating content are also located in the VRT Field.
The VRT Base, the building’s lower volume, also contains three large television studios.

The new VRT building is compact, integrated into its natural surroundings and has a small ecological footprint. The construction project aims to preserve as many existing trees as possible and retain the site’s green qualities. What’s more, the new building is 100% fossil fuel-free. A highly insulated building envelope minimises the need for heating. The motto is ‘Avoid first, then make greener’. Natural gas and heating oil are no longer used, and the building is heated entirely using technologies including heat pumps and geothermal energy, with a strong focus on heat recovery and activating thermal mass. Around 2,300 m² of solar panels will be installed on the roof to support the electrical system.
The new VRT building in figures
- 1 base and 1 field
- A 3-storey field
- 65,000 m² of building space
- Each floor is the size of 2 football pitches
- 18,000 m² of flexible workspaces
- 5,000 m² of green space
- 5 internal courtyards
- 10,000 m² of meeting spaces
- 500 m² of event space
- 3 large TV studios
- 1 studio on the newsroom floor
- 5 radio studios
- 100% accessible to everyone
- 2,300 m² of solar panels
The VRT Morgen construction team
Several leading players in the Belgian construction sector share a vision and values, and have come together as the VRT Morgen construction team. Building on fruitful collaborations in the past, these parties came together for this project thanks to their complementary expertise.
- Design team: OFFICE Kersten Geers David Van Severen, Jaspers-Eyers Architects, Bureau Bas Smets, Tractebel Engineering, CES and iDeal Acoustics
- Contractors: Willemen Construct, Jan De Nul and EEG
Jelle Machiels (Project Manager VRT Morgen, Willemen Construct): “We want to get it right first time. Close collaboration is therefore crucial. We are continually refining the design from every angle. We bring plenty of experience and enthusiasm to the table, united by a single shared goal: to create a fantastic new VRT building. Everyone is pulling in the same direction!”
Sofie Herreman (Sales Manager, Tractebel): “VRT Morgen has designed a compact, open and dynamic media centre where creativity is at the heart of everything. The building sets an example in terms of user comfort, energy efficiency and biodiversity. It is also connecting, inspiring and flexible, just like the construction team.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral


















