Winners of the 2020 Steel Construction Competition announced

Building with steel is an art in itself, which is why knowledge centre Infosteel organises a Steel Construction Competition every two years to celebrate outstanding projects.
On 22 February, the winners of the 2020 edition were announced. From 65 projects completed wholly or partly in steel between June 2018 and the end of May 2020, the professional jury selected four winners in as many categories. A Public Prize was also awarded. In this article, we take a closer look at the chosen projects.

Cordeel HQ, Temse
An architectural tour de force, a technical feat, a unique eye-catcher: there are many ways to describe Cordeel’s new headquarters in Temse. It is hardly surprising, then, that this prestigious project came out on top in the Utility Buildings category. Designed by BINST ARCHITECTS, the 108-metre-long beam-shaped structure spans the former Boelwerf dry dock, strategically located on an offshoot of the Scheldt. Steel, glass, reflective façade panels and boundless ambition combine to make this structural gem a unanimous favourite. The 1,200-tonne steel truss structure was pre-assembled at the end of the dry dock and lifted into position using special cranes.

CART, Ham
On a modest, wooded plot in an SME zone overlooking the Albert Canal, a welding workshop, an open-plan office for around four people and a loft-style home have been built. To showcase the welding company’s activities, MAX8 architecten chose exposed, permanently visible profiled steel and steel sunshades. Although the building has a hybrid structure, partly concrete and partly steel, it gives the impression of being built entirely as a steel structure, since the black steel beams (UPN400 type) and columns are visible on the façades, which are clad in timber slats. In total, 38 tonnes of S235 section steel were used in the building. In short, a worthy winner in the Residential category!

A Giant Sculpture, Kasterlee
At the highest point of the Kempense Heuvelrug near Kasterlee, atop the 30-metre-high dormant sand dune of Hoge Mouw, stands ‘A Giant Sculpture’, a permanent steel sculpture designed by Gijs Van Vaerenbergh. The colossus measures 6 x 5 x 3 metres and weighs around 2 tonnes. Its faceted head is built as a dome comprising 2,115 metal triangles, each 6 mm thick and welded together. This new, uncanny feature fuels the landscape’s mythology, alluding to sculptures unearthed from antiquity, and won the Specific Steel Elements category.

imec/KUL Car Park, Leuven
A new car park was built in the second half of 2018 on Arenberg III campus, between the imec site and building 200A of KU Leuven’s Department of Computer Science. Rather than an ordinary volume whose structural shell also serves as the finished surface, this is a high-quality architectural project by Stéphane Beel Architects, with a refined appearance, and it took top spot in the Industrial Buildings category. Unlike many other car parks, often built entirely from (precast) concrete, imec and KU Leuven’s energy-neutral car park consists of a steel structure with built-up I-beams and reinforced composite steel deck slabs.
The Dutch Vault, Houten (NL)
Because of the coronavirus pandemic, voting for the Public Prize took place entirely online. 2,700 people cast their votes, choosing The Dutch Vault in Houten, the Netherlands, as the winner. It was an excellent choice, as the new headquarters of the Royal Dutch Mint is certainly a sight to behold. Designed by Architectenbureau Wastiau & Co and Architectenbureau Wil-Ma, the iconic building stands out thanks to its gold-coloured façade. This impressive example of façade architecture was created through the intriguing interplay of triangular metal pointed profiles, whose three-dimensional form and shifting colours create a unique optical illusion.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral


















