Healthcare projects

Assisted living residences built to the highest standards

Koninksveld bestaat uit twee volumes met drie bovengrondse bouwlagen, die aan elkaar gekoppeld zijn via een gelijkvloers gedeelte met de inkomzone en de gemeenschappelijke ruimtes.
Koninksveld bestaat uit twee volumes met drie bovengrondse bouwlagen, die aan elkaar gekoppeld zijn via een gelijkvloers gedeelte met de inkomzone en de gemeenschappelijke ruimtes.

Demand for suitable housing for older people has risen dramatically in recent years. Fortunately, the choice in Linden has grown a little, as an old farmhouse on Leuvensesteenweg, close to the charming village centre, has made way for Koninksveld, a residential complex with 44 accredited assisted living apartments. The older residents who moved in over the past few months can now enjoy their new home to the full, with beautiful views of the greenery behind the building. The quality of the construction and site management also make this a project that deserves to be held up as an example.

A central location, high-quality homes, welcoming communal spaces, including a cosy café, and a large garden with a spacious terrace: Koninksveld has plenty to offer. Carl Ceusters, project manager at DCA, the construction company responsible for delivering this attractive assisted living complex, agrees. “The ground floor has extensive glazing, so you can practically see right through the building, which is a huge asset. Large rooflights in the communal areas also let in plenty of natural light, creating a very open feel. The stunning views of the green surroundings are the icing on the cake.”  

“It was a great advantage that buildability was considered from the design stage. This helped improve productivity on site,” says Carl Ceusters.

A considered choice of colours and materials

Koninksveld comprises two blocks, each with three above-ground storeys, linked by a ground-floor section containing the entrance and communal areas. The fact that the entire building has a basement is a significant bonus. The spacious basement, built in in-situ concrete, accommodates 25 parking spaces, bicycle storage, storerooms and a communal plant room with a large gas-fired boiler that supplies the satellite boilers in the assisted living apartments. Elsewhere in the building, the load-bearing internal walls are made of calcium silicate blocks and the non-load-bearing walls of gypsum blocks. “This meant we could finish the entire interior with skim plaster,” says Carl Ceusters. 

“The floors are made of predalles, with the electrical wiring, light points and ventilation ducts cast into the concrete topping. The façades are clad in a subtly varied beige-grey facing brick, complemented by projecting balconies which, like the stair cores, were prefabricated at our DCA Concrete factory in Olen. Buyers could finish their homes to suit their preferences, choosing from three packages that each create a distinctive atmosphere through a carefully considered choice of colours and materials: classic, sleek or warm. Every apartment is also fitted with an emergency call system from Essec, allowing residents to request help or send an alarm if necessary.”

The projecting balconies, like the stair cores, were prefabricated at the DCA Concrete factory in Olen.

Excellent collaboration

Although the project was delivered during the height of the coronavirus pandemic, construction of Koninksveld experienced little or no delay. This was thanks to DCA’s proactive approach. After the general lockdown was announced in March 2020, the company did not sit back and wait. “We immediately looked at how we could resume work safely, which meant the site was only closed for two weeks,” explains Carl Ceusters. “We were still working on the underground structural works at the time, outdoors, so it was manageable with the necessary safety measures in place: workers travelling to the site in their own cars or reserve vehicles, keeping their distance in the excavation, and paying particular attention to hygiene. We handed over the building in early March 2022.”    

DCA has nothing but fond memories of this impressive project, thanks in large part to the excellent collaboration with the client and architect. “It was a great advantage that buildability was considered from the design stage, for example by keeping complex details to a minimum. This helped improve productivity on site. Communication between everyone involved was also smooth, open and solution-focused from the outset. The client and architect placed great value on our expertise. For example, the resin floors and skirting in the bathrooms form a single continuous surface, making them easily accessible to wheelchair users. When working on previous assisted living projects, I had already noticed that this ‘tray principle’ had many advantages over the traditional approach of laying small tiles on a slope. So we were firmly committed to quality and functionality, without compromising the overall architectural design. If every project went this smoothly, I’d be a happy man,” says Carl Ceusters with a wink.    

Question about this story? Ask your question

Who worked on it

Koninksveld in Lubbeek

  1. clientSolid Wonen
  2. architectAtrio architecten associatie
  3. main contractorDCA
  4. graaf- en grondwerkenGodts
  5. call systemEssec

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKoninksveld
  • SubjectHealthcare projects
  • CompanySolid Wonen
  • CompanyAtrio architecten associatie
  • CompanyDCA
  • CompanyGodts
  • CompanyEssec
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.