Brand-new care home in an old city neighbourhood

GZA Zorg en Wonen demolished its existing complex in Antwerp’s Seefhoek district and replaced it with a spacious, airy new building. After a temporary relocation, the 136 residents moved in in October. “They are people with mental health vulnerabilities and people with acquired brain injuries, such as Huntington’s disease,” says director Elke Raman. “They do not all come from this neighbourhood, but they do not stand out in the streetscape. This was one of the factors behind the decision to rebuild the care home here rather than at another location.”

The original building dated from the 1980s. “At the time, buildings were designed to meet existing needs with the bare minimum,” explains architect Jan Kalhöfer (Stramien cv). “Unfortunately, this meant that renovating the complex to meet today’s needs and comfort requirements would have cost much more than building an entirely new one. For example, ceiling heights were limited back then. We now need much more clear height to install suspended ceilings, with the required building services infrastructure above them.” The importance of building services today is reflected in the structure of the temporary joint venture. EEG (building services) is on an equal footing with Van Roey (structural works).

Optimised building services
“The building services include 102 PV panels on the roof, which is covered with white roofing felt to prevent overheating from the sun,” explains Roger Albertijn, technical services manager at GZA Zorg en Wonen. “The mechanical ventilation and cooling system is fitted with CO2 controls, condensing boilers provide the heat and LED lighting is used throughout.”
The old building had many double rooms and single rooms without showers, whereas private showers and toilets are now the norm. “The partitions were made of masonry. In the new building, they are made of plasterboard. This means the layout can be adapted in the future without major work, should the need ever arise. “The special provisions for the residents are unobtrusively integrated into the interior,” says Jan Kalhöfer. A good example is the bathroom doors, which can be locked and also serve as sliding partitions to separate the sleeping area from the bathroom. Another is the stone dado, which
is resistant to urination in public and vandalism. The water supply to individual bathrooms can be shut off for residents with potomania or obsessive-compulsive behaviour. The external mobile sun shading with horizontal louvres can be adjusted individually. On the south side, it is concealed behind the masonry, while on the east and west sides it is hidden from view by additional window frames.

Carefully considered façade rhythm
Thanks to the large windows and courtyard garden, the new building feels much more spacious and light-filled than its predecessor. It also provides approximately 40 % more floor space. This is partly thanks to the carefully considered architecture and partly to the incorporation of two adjoining plots, previously occupied by terraced houses. “The construction project was preceded by extensive planning and preparation,” says Roger Albertijn. “Given its scale, the building has a major impact on the appearance of the adjacent square. We therefore had to negotiate extensively with the municipal departments
responsible for urban planning.”
The front façade combines white facing brick with sills and copings in white architectural concrete. “As the school on the other side of the square was a very stark composition, we needed to introduce more variety,” explains Jan Kalhöfer. “That is why we added articulated sections with different grain sizes. This rhythm creates harmony with the houses along the rest of the square.”

More open space
With five above-ground storeys, the new building is about the same height as the demolished one. “At the rear, however, we compromised on the building height and limited ourselves to just three storeys, ensuring that other local residents retained their open views. The city also benefited from the project in other ways. Removing an existing warehouse allowed us to increase the open space from 1,600 m² to 2,300 m². This figure excludes the largely intensively landscaped roof garden, the care home’s centrepiece,” stresses Jan Kalhöfer.
GZA Zorg en Wonen has given the open space at De Zavel both green and blue features. It also installed a number of rain gardens, or wadis. As well as enhancing the setting, they serve the practical purpose of storing rainwater.

Question about this story? Ask your question
Who worked on it
De Zavel in Antwerpen, nieuwbouw
- ClientGZA Zorg en Wonen vzw (Antwerpen)
- ArchitectStramien cv (Antwerpen)
- Main contractor(s)Van Roey (Rijkevorsel)
- Main contractor(s)EEG (Gullegem)
- Studiebureau techniekenSDKE (Brugge)
- Studiebureau stabiliteitIngenieursbureau B.E.C. (Brussel)
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDe Zavel
- SubjectHealthcare projects
- CompanyGZA Zorg en Wonen vzw (Antwerpen)
- CompanyStramien cv (Antwerpen)
- CompanyVan Roey (Rijkevorsel)
- CompanyEEG (Gullegem)
- CompanySDKE (Brugge)


















