A listed Neo-Gothic building given a contemporary purpose
Text Koen MortelmansImage Bruno Knockaert en Bressers Architecten

Alongside the town hall, Sint-Laurentiuskerk and the city museum, the former 1906 post office is one of four iconic corner buildings on the Markt in Lokeren. It had stood empty for some time when the city council bought the property in 2019. In the near future, it will serve, among other things, as the city archives and home to the municipal tourist office.
Given the building’s listed status and location, it would not have been straightforward for a private property developer to find a new use for the post office. The city council, however, saw the opportunity to buy it as a chance worth taking. Limited preservation works were carried out in 2020. The main restoration and renovation works began in 2023, led by specialist contractor Monument Vandekerckhove and based on a design by Bressers Architecten, winners of a competition organised by the city council.
“After its makeover, the city will also use the multi-purpose post office for weddings and other ceremonies, council meetings and exhibitions,” explains Bruno Knockaert, project manager at Monument Vandekerck-
hove. The building has also gained a contemporary extension. “We connected the new-build seamlessly to the existing Neo-Gothic building without compromising its historic character. We preserved the building’s historic fabric and elements of artistic value as authentically as possible, although in some places we had to reconstruct them to match the original.”



Plinth cut into slabs
One example was part of the façade plinth. “It was built from green arcosic stone. Part of it had once been removed to make way for an ATM. We removed the ATM. Green arcosic stone is still quarried, but new stone would stand out from the rest of the now-weathered façade, both because it has not undergone the same ageing process and because natural variations in the quarries, in colour and texture, would make it a poor match for the existing plinth. We therefore removed part of the existing façade plinth and cut it into slabs. After cutting and further processing, the entire plinth is once again made from similar material, albeit in a thinner layer,” explains site manager Niek Ghijs.
The entire façade was also cleaned. “We cleaned the lime-sandstone and bluestone and, where necessary, temporarily removed, repaired and reinstated them, then repointed them. We repaired badly damaged sections with stone inserts or, where this was not possible, replaced them with new material.”
No more fungal decay
Monument Vandekerckhove gave the building remedial treatment. “We carefully removed fungus and woodworm damage from timber structures and walls. In several places, the eaves, roof trusses, wall plates and slate-covered roofs were so badly damaged that we had to install new elements.” The existing roofs of the old building were also given new natural slate coverings. “The new-build will have both extensive and intensive green roofs. Part of the new roof area will house the equipment for the heat pumps and ventilation ducts.”
The existing post box also received remedial treatment. “We adapted it so it can be used efficiently again, preserving a lasting link with the building’s former function.”

Marble and cork
The old plaster ceiling, built on a timber support structure, featured numerous mouldings. Monument Vandekerckhove’s specialist team carefully removed and restored them using traditional methods. “With surgical precision,” stresses site manager Lorenzo Noppe. “But we could not salvage the ceilings beneath the slate-covered roof. We made new mouldings to match the originals.” The existing marble window sills were cleaned and salvaged wherever possible. “The old building was fitted with insulating cork lining on the inside, so we had to adjust the dimensions of every sill.”
The old wrought ironwork was given a new coating after sandblasting. “We made replacement cast-iron façade lanterns to match the originals. We also replaced all the external timber joinery in the same way. The windows were fitted with double glazing using the Fourcauld process. This leaves slight distortion and waviness visible in the glass,” explains Bruno Knockaert.

Daylight and breathing space
“We designed the new volume on the ground floor to be transparent, allowing both this part and some of the historic front building to make the most of the incoming daylight,” says architect Frédéric Rosier of Bressers Architecten. The volumes added in the 1970s were demolished, giving the historic building more breathing space and light. “We built a new four-storey extension on part of the cleared space. Despite the extensive building programme, we decided not to build over the entire available area. The new-build sits well alongside the existing buildings, while remaining subtly hidden behind the old post office and not extending all the way to the street. This allowed us to enhance the historic character to the greatest possible extent.”
The patio between the two volumes, the winter garden in the historic building and the rhythmic glazed sections in the new-build ensure that both parts of the building make the most of the incoming daylight. “This allows the different spaces to be used flexibly, blurring the boundaries between indoors and outdoors, and between old and new,” Rosier explains.
The relationship between old and new is evident elsewhere, too. “For example, on the upper floor, where the new council chamber connects to the historic attic. This intervention creates an engaging play of lines when viewed from different parts of the building,” the architect explains. The choice of white brick for the new-build reinforces its connection with the historic building. “The white colour blends perfectly with the white natural stone of the 1906 building, while the texture adds depth. Vertical white concrete elements echo its slender façade.”

Parquet and aggregate
The floors on the upper storeys of both the old and new buildings are finished with solid oak parquet, white-oiled. “On the first floor of the historic building, we used engineered parquet with a top layer of white oak, finished with oil,” explains Bruno Knockaert. “This was because we decided to install underfloor heating using a dry system over timber joists. Solid parquet could have led to settlement.” Other ground-floor areas also have underfloor heating, but are finished with polished concrete containing 16 mm white Norwegian aggregate.
All-Connects: Site management
To ensure a safe and legally compliant construction site, Monument Vandekerckhove drew on the expertise of All-Connects. This family-run business based in Kontich specialises in digital solutions for site management and security, as well as monitoring people, equipment and vehicles. “In short, we provide the construction sector with a fully online management platform that can connect all assets,” says marketing manager Hilde Lavrijssen. “Our SaaS solution allows companies to meet all registration requirements under Flemish, Belgian and European legislation, including social security obligations, in a convenient way.” All-Connects tailors these applications to each client. “Monument Vandekerckhove has been a trusted partner for some time,” says Lavrijssen. “In Lokeren, the request was limited to a turnstile linked to a time clock. The same was true at the Menin Gate in Ieper. During asbestos removal at the Boerentoren in Antwerpen, security measures were more extensive and we kept track of everything. At Sint-Gummaruskerk in Lier, a time clock without a turnstile was sufficient. Our applications go beyond legislation and site security. They give construction companies control over attendance, material use and driving behaviour. In this way, All-Connects contributes to fair working conditions and more sustainable site management.”
TECHNICAL DETAILS
Client Stad Lokeren
Architect Bressers Architecten (Gent)
Main contractor(s) Monument Vandekerckhove (Ingelmunster)
Question about this story? Ask your question
Who worked on it
Postgebouw Lokeren in Lokeren
- ClientStad Lokeren
- architectBressers Architecten
- Main contractorMonument Vandekerckhove
- digitale oplossingen voor werfbeheerAll-Connects
Keep following this
Get an email when a new story is published. No account needed.
- ProjectPostgebouw Lokeren
- SubjectMonuments
- CompanyStad Lokeren
- CompanyBressers Architecten
- CompanyMonument Vandekerckhove
- CompanyAll-Connects