A remarkable location with a unique atmosphere that inspires and brings people together. That is how you could sum up 3Architecten’s new home. The creative team has moved into the deconsecrated Sint-Jozefskerk in Roeselare. And they are not the only ones. Visitors are welcome too. “Churches are natural meeting places. We want to preserve that role. We want to keep the neighbourhood involved and open our building to the public,” says architect Christophe Keirsbilck.

Although the Sint-Jozefskerk on Deken De Saegherplein has been given an entirely new purpose, its ecclesiastical character has been fully preserved. The architectural practice is housed in the church’s choir. The nave, in turn, provides space for gatherings and neighbourhood activities. The connection with the surroundings has been strengthened from within by adding three new windows. To create them, contractor Beeuwsaert Construct cut three understated, full-width openings into the massive church walls. It enlarged
one existing opening and created two more. These new windows bring daylight into the church, making the interior even more inviting and creating a dialogue with the activity outside.

The church was built in 1952 and from the outset played an important role in bringing the neighbourhood together.

A piece of history

At its new location, 3Architecten brings innovative construction together with a historic setting. The church was built in 1952 and was an important meeting place for parishioners from the very beginning. At the time, the neighbourhood, between the harbour in Roeselare and the submunicipality of Rumbeke, was still rapidly developing. Many artefacts were retained when the church was acquired. The clock and bells, church chairs, statues and organ can all still be admired in the building today, in all their glory.

The church has not served a religious purpose for several years. It was deconsecrated in 2014, and three years later the designers at 3Architecten spotted its potential. On Ascension Day, a symbolic date, they moved into their new office and at the same time provided local residents with a multi-purpose space. “It is our first business property. Previously, we always rented our office space,” says Christophe Keirsbilck, architect and co-managing director of 3Architecten. “The deconsecrated church brought everything together for us: a location with a story, a strong presence and space to work in complete comfort.” 

The connection with the surroundings has been strengthened from within by creating three new windows.

Modern building services

Converting a church building naturally brings specific challenges. Acoustics, for example. The natural reverberation time of no less than 9 seconds made meetings and discussions difficult. Christophe Keirsbilck explains: “So, together with our construction partners, we developed an acoustic solution. Using acoustic spray plaster, among other measures, we were able to reduce the reverberation time to around 3 seconds. It is the perfect compromise between a sound environment that works for our practice and the right acoustics for the authentic church organ.”

The contractor created several new openings in the thick church wall.

Sustainable repurposing

The indoor temperature also received particular attention during the alterations to the church. Insulation was laid over the existing floor, followed by a polished concrete floor to give it a contemporary look. The existing boiler was connected to a heat pump. Solar panels and a high-performance air handling unit complete the modern building services within the ecclesiastical setting. All systems, including lighting and access control, are managed by a home automation system. “It is a smart building management system that will spend its first year learning the users’ habits and then optimise consumption accordingly,” adds Christophe Keirsbilck. “We deliberately chose systems and materials whose simplicity complements the existing building and, above all, does not distract from its authentic features.” With this project, 3Architecten is giving the repurposing of the Sint-Jozefskerk a sustainable future.   

The choir screen separates the architectural practice from the rest of the church.

The beating heart of the neighbourhood

The choir screen separates 3Architecten’s office from the rest of the church. After office hours and at weekends, the church becomes a meeting place for up to fifty people. It is not intended for lively parties, but for quiet activities that respect the building’s authentic character. “Think of rehearsals by the local choir, talks or yoga sessions,” says Christophe Keirsbilck, giving a few examples. “The church’s role in bringing people together will be further strengthened in the coming years. The surrounding area will be depaved, creating something like a park. The Sint-Jozefskerk will once again become the beating heart of the neighbourhood.”    

Project partners speak

L.A.B.E.A.U. Structural engineering consultancy

3Architecten understood that an iconic building such as a church should be preserved in all its glory. Nevertheless, it made a limited intervention in the outer envelope to bring in enough daylight and strengthen the connection between indoors and outdoors. One window opening was enlarged and two new ones were created. “You cannot simply do that in church walls around 90 centimetres thick,” says Frederik Tonniau of L.A.B.E.A.U., the consultancy responsible for the structural engineering study. “The solution was to develop a clever sequencing plan that would create five point loads in the finished structure, redistributing the loads across the existing foundations.” L.A.B.E.A.U. also carried out the necessary calculations for the duplex. A slender, elegant steel frame was designed to be ‘tensioned’ between the existing massive structure. This also provides lateral stability, allowing for a minimalist design. “I trained as an architectural engineer myself, which has its advantages. We contribute to the design, not only in terms of calculations, but also spatially and architecturally,” Tonniau adds.

Alertis: Access control, intruder and fire detection

The architecture of a church and the dual use of the building in its new role: these were the two challenges facing Alertis as the partner responsible for access control, intruder detection and fire detection. Project manager Michael Algoedt oversaw the project. “We often work on built heritage projects. In those settings, we often opt for aspirating smoke detection, as we did here. Installing a fire detector on the ceiling was not straightforward, nor was it the best solution aesthetically. We were able to offer an elegant alternative that is unobtrusive visually.” Access control also called for the eye and hand of a specialist. A flexible system was needed to manage both the architects’ own use of the building and its rental to external users. “Thanks to its extensive programming options, the Nedap system is ideal for this. It is also linked to the intruder alarm system and the home automation system. Communication between the different systems was the biggest technical challenge. Close collaboration with partners including Duotecno delivered an excellent result,” says Michael Algoedt. Alertis has fourteen other project managers at work, so there is always someone available to answer questions or deal with problems. “We make a difference through close contact with our clients and our tailored approach.”

Bernard Degroote: Concrete flooring

The poured polished concrete floor is a fine example of how past and present come together in the deconsecrated church. For this work, 3Architecten turned to Bernard Degroote BV in Zonnebeke. Like the architectural practice, this concrete flooring specialist focuses on high-quality finishes. Bernard Degroote BV poured an 18-centimetre-thick concrete floor with double mesh reinforcement of 150/150/8/8 millimetres, combined with polypropylene fibres. The fibres help prevent small shrinkage cracks. The 2-millimetre-thick double slip membrane allowed the concrete floor to move freely over the substrate as it shrank and expanded. The team created a shadow gap between the floor and the walls, using a 3-centimetre-thick insulation strip. Galvanised movement joint profiles were installed at the corners. “All of this was done to minimise the risk of cracking,” explains general manager Steven Dedrie. “We also made special formwork at the doorways. This allowed us to cast the steps at the same time as the concrete floor, minimising colour differences in the finish. That is the benefit of our many years of experience and expertise.” Korodur was dry-shake applied to the top layer, providing a highly abrasion-resistant finish in light grey. After polishing, saw cuts were made in the concrete floor according to a pre-prepared cutting plan. “This is an excellent reference project for us, showcasing our knowledge and expertise to the full,” concludes Steven Dedrie.

Duotecno: Home automation

Drawing on its own-manufactured hardware modules and years of experience with a wide range of projects, Duotecno (Brugge) equipped 3Architecten’s new home with modern home automation. The systems are easily controlled through a decentralised system distributed across three electrical cabinets. Connections for audiovisual installations were also fitted straight away. “Access control in particular required a bespoke solution,” says Burt Eeckhout, one of the managing directors. “This was a specific case because the building has two functions. Part of the church, alongside the architectural practice, has been set up as a meeting place. The church therefore remains accessible after office hours, but the office space does not. It is a matter of getting the programming right.” This project demonstrates the wide range of home automation options Duotecno offers for bespoke solutions. It is a puzzle of components and brands, with a thorough individual approach through à-la-carte configuration.

PROJECT SPECIFICATIONS

Client 3Architecten (Roeselare)

Architect 3Architecten (Roeselare)

Main contractor(s) Beeuwsaert Construct (Ledegem)

Have a business enquiry for Beeuwsaert Construct? Get in touch

Who worked on it

Sint-Jozefskerk in Roeselare

  1. contractorBeeuwsaert Construct
  2. Client3Architecten
  3. structural engineering consultancyL.A.B.E.A.U.
  4. toegangscontrole, inbraak- en branddetectieAlertis
  5. Concrete floorsBernard Degroote BV
  6. home automationDuotecno

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSint-Jozefskerk
  • SubjectMonuments
  • CompanyBeeuwsaert Construct
  • Company3Architecten
  • CompanyL.A.B.E.A.U.
  • CompanyAlertis
  • CompanyBernard Degroote BV
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.