De Nieuwe Molens | Ghent: Old mills find a new purpose

Another building gradually taking shape as part of the redevelopment of the ‘Oude Dokken’ in Ghent is the ‘De Nieuwe Molens’ residential complex. It is an excellent example of how industrial heritage can be given a progressive and interesting new purpose. No fewer than 51 lofts and apartments are being brought together on the site of the old flour mill, in an attractive green setting.
To preserve the link with its industrial past, the façades are made largely of the red brick that characterised the original site.

All that remained of the once thriving flour mill was a group of buildings from different periods, arranged around a courtyard. Commissioned by Tondelier Development, they are being redeveloped as a residential complex to plans by Rapp+Rapp. Kris De Caluwe, project manager at contractor Louis De Waele: “A new, lower volume is being added on the west side to enclose the courtyard. It is designed as a solid concrete structure with generous terraces on the south-west side. The monumental warehouse on Gasmeterlaan is being restored and partially given a new façade. The Mill Building on the south side is being converted into a loft building. Finally, the enclosed silo building is undergoing extensive renovation.”
Old and new flow seamlessly into one another.

An architectural link with the industrial past
The complex ranges from four to seven storeys. It also includes two underground levels, with a car park for 90 vehicles, bicycle parking, storage rooms and plant rooms. With almost 10,000 m² of usable floor area, ‘De Nieuwe Molens’ will be one of the larger residential complexes in Ghent. To preserve the link with its industrial past, the façades are made largely of the red brick that characterised the original site. This is combined with small sections of white architectural concrete, large expanses of glazing and black aluminium frames. To soften its imposing appearance, the new section is built mainly in white architectural concrete, combined with glass balustrades and grey aluminium frames. Part of the complex’s flat roof is being turned into a green roof, accessible to all residents. “The project gives urban living a completely new meaning,” says Kris De Caluwe. “All residents have views of the water or the greenery of the neighbouring park. The upper floors also enjoy views of Ghent’s beautiful skyline.”
No fewer than 51 lofts and apartments are being brought together on the site of the old flour mill, in an attractive green setting.

A complex project
The delivery of this impressive adaptive reuse project was entrusted to Ondernemingen Louis De Waele, the renowned main contractor that has been active in various branches of the construction and infrastructure sectors since 1866. Senior site manager Franky Verbraekel: “The mix of new-build, renovation and restoration work calls for a special approach. At the Kanaalgebouw, we retained only the front façade. The rest was demolished and rebuilt to the original design, including three-brick-thick masonry façades. Naturally, everything has to comply with current EPB standards. We also had to take account of the varied façade composition: facing brick, architectural concrete elements, blue limestone, decorative render … Finally, the client gave buyers considerable freedom to make all kinds of changes during construction. In short, this project calls for a great deal of patience, perseverance and craftsmanship from our people and subcontractors. But we are convinced that the result will be very rewarding for everyone involved.”
Text Els Jonckheere | Image Ondernemingen Louis De Waele
Featured image: To soften its imposing appearance, the new section is built mainly in white architectural concrete, combined with glass balustrades and grey aluminium frames.
TECHNICAL DETAILS
Client Tondelier Development (Ghent)
Architect Rapp + Rapp (Amsterdam)
Main contractor(s) Ondernemingen Louis De Waele (Brussels)
Project partners speak
G. Smeyers: Construction pit dewatering
For De Nieuwe Molens, the excavation for the car park had to be dewatered down to level +80.4. The task presented several challenges, particularly when it became clear that the groundwater was contaminated. This meant that the originally planned method could not be used. However, the G. Smeyers (Zonhoven) engineering department quickly adapted to this unexpected situation, enabling the work to be completed within the planned timeframe.
At first glance, the work at De Nieuwe Molens looked like a typical project for G. Smeyers. “An excavation measuring 87 x 18 metres, with the groundwater level needing to be lowered by 5.75 to 8.55 metres below ground level, is technically straightforward to achieve using wellpoint dewatering with deep wells,” says director René Lambrechts. “In practice, however, it proved to be a different matter. We found groundwater contamination, which meant the water pumped out during dewatering first had to be treated before being discharged into the sewer. However, groundwater remediation was limited to a flow rate of 80 m³/h, so we had to find another method. Fortunately, we have more than enough expertise in-house. Our own engineering department created a 3D groundwater flow model. We ran several simulations to find the right balance between the depth of the cut-off wall and the pumping rate, taking the local soil conditions into account. Based on the results, we decided to install a cut-off wall down to level -4.00 TAW. Within it, 21 shallow vacuum deep wells were drilled. The system we installed then dewatered the excavation to the required depth, while the pumped water was sent to the groundwater treatment plant without exceeding the maximum permitted flow rate of 80 m³/h. We have also successfully used this method on the follow-up project on the same site (Cronos).”
WoonProject: Kitchens
High-quality apartments need perfectly designed and finished kitchens. At De Nieuwe Molens, residents can choose from a selection of kitchens supplied by WoonProject of Gavere, a company run by brothers Werner and Peter Van Laere since 2004.
“Because we work without intermediaries and have our own workshop, we can keep prices down while still delivering perfect quality,” says Werner Van Laere. “We also take pride in guiding customers through their choices. Given that an average of 420 decisions have to be made when designing a kitchen, it is naturally a time-consuming process. But it is immensely rewarding when the customer is delighted with the result. We always start with a blank sheet. Every cabinet is literally made to measure, never a rehash of an earlier design. This bespoke approach allows us to respond perfectly to customers’ ergonomic, functional and aesthetic requirements, and to create a well-considered design. Finally, at WoonProject we aim to set ourselves apart through clear communication and equally reliable scheduling.”
WoonProject has more to offer, too. In addition to kitchens, the company supplies and installs a wide range of other fitted furniture, an option many buyers at De Nieuwe Molens have been keen to take up. “As well as the 51 kitchens, we have now received a great many enquiries about bedrooms, hall cupboards, bathroom furniture, dressing rooms and so on,” says Werner Van Laere. “De Nieuwe Molens is therefore an important project for us, though not only because of its size. Above all, we are proud that the client selected us as its preferred kitchen supplier, because they were extremely pleased with our work on an earlier project, La Reserve in Knokke.”
Een zakelijke vraag aan G. Smeyers N.V? Get in touch
Who worked on it
De Nieuwe Molens in Gent
- bemaling bouwput
G. Smeyers - clientTondelier Development
- architectRapp+Rapp
- main contractorOndernemingen Louis De Waele
- kitchensWoonProject
Keep following this
Get an email when a new story is published. No account needed.