Construction of a new care campus in Ekeren began in June 2021. Just a year and a half later, handover inspections are already under way at the new CLT building. The unusual construction method and tight schedule called for greater speed, precision and flexibility, so a Leica iCR70 total station was brought in.

In recent years, Groep Van Roey has bought several Leica total stations from measurement specialist Lasertopo. “Those instruments are never sitting in the warehouse,” reveals project manager Wim Cox. “They’re always in use. They weren’t available this time either, but fortunately we could rely on Lasertopo’s rental service. We haven’t ruled out buying this instrument as well once the rental period is over.”

The iCR70 was used to set out foundations, lift cores and sewers, among other things, and later to check the as-built condition. (Image: Groep Van Roey)

The need for exceptional precision

Zorgcampus Sint-Jozef comprises two schools and a care facility for children with disabilities. Wim Cox: “The building consists of four sections, has three storeys and was the largest CLT project in Flanders when work began. That means all the walls and floors are made from cross-laminated timber panels. Only the foundation slab and lift shafts were built in concrete.” 

The CLT panels were prefabricated in Austria using a highly detailed BIM model, then assembled on site like a jigsaw puzzle. “CLT demands exceptional precision. Because everything is prefabricated, deviations of just a few millimetres can already cause problems. You must therefore never stray from the setting-out lines.”

Putting the total station to work

Site manager Joppe Schepers explains how the total station helped achieve that level of precision without jeopardising the project’s tight schedule. Van Roey had 18 months for the construction phase. “The iCR70 was used to set out foundations, lift cores and sewers, among other things, and later to check the as-built condition. A school building like this, for example, has quite a few sewer pipes coming up through the floor. The total station let us check straight away whether they were in the right place and intervene in good time if they weren’t.” The position, dimensions and verticality of the lift shafts were also checked against the BIM model. “This gave us confidence that the CLT panels would fit later on, and it also saved time. With the iCR70, we could carry out the check immediately after installation, which meant we could order the lifts at a very early stage.”

According to Wim Cox, precision, speed and flexibility are the total station’s key advantages. “Traditionally, you rely on surveyors to achieve a high level of accuracy. But if the design changes or a few stakes are accidentally knocked over, you usually have to wait several days before they can come back to site. With the total station, you’re in control of everything without compromising on precision. 

You can set out points whenever you need them, and if anything changes, you only have to load the new model.”

When the rental instrument was delivered, experienced surveyors from Lasertopo gave site manager Joppe Schepers a thorough explanation and demonstration. (Image: Lasertopo)

Creative possibilities

Joppe Schepers confirms that the instrument and software are easy to use. “You can also use them very creatively, for example by checking dimensions or volumes directly on the tablet, without having to transfer everything to a computer first. We also created the sewer as-built model without a computer: an export from the total station was all we needed.”

And there are further opportunities, Wim Cox believes. “We used the total station to set out the site road, so it wouldn’t accidentally run across the foundations on the 15,000 m2 site. We also carried out a lot of check measurements with the iCR70, for example for earthworks. In other words, it eliminates guesswork at every level.”

A direct line for support

Joppe Schepers was the one who got to operate the total station on the Ekeren site. “It was my first time,” he admits. “When it was delivered, Jochen and Roy, two experienced surveyors from Lasertopo, gave me a thorough explanation and demonstration on site. That was enough to get me started, although, of course, you do run into problems from time to time. In that case, Lasertopo was never more than a phone call away. Jochen could usually talk me through a solution straight away, and if not, he could always take control of my screen via TeamViewer. As a result, I never had to stop surveying. And after a month, I didn’t even need to call Jochen any more …”   

Een zakelijke vraag aan Lasertopo BVBA? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBIM
  • CompanyLasertopo BVBA
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.