Willy Naessens Industriebouw pushed the boundaries of precast concrete to meet the high aesthetic standards set by DevolderArchitecten for ntgrate’s new premises in Kortrijk. The client and architect opted for precast concrete, with a distinctive finish and a carefully considered concept. The challenging project was entrusted to the experienced team at building contractor Willy Naessens Industriebouw.

Just before the summer break in 2019, ntgrate approached DevolderArchitecten. The company wanted to create its own premises at Evolis business park in Kortrijk and was looking for the right partners. With a very tight deadline in mind, the company wanted to move in by the following summer, so architect Geert Devolder decided to work on the design during the holiday period. “I arranged the first meeting with the directors just before they went on holiday. They were standing there in their shorts, ready to board the plane,” he recalls. “When they got back from their trip, I had a few ideas ready. We needed the same speed from our contractor. Willy Naessens Industriebouw is highly vertically integrated, which gives them the capacity we were looking for.”

From the outset, it was clear that the schedule would be the biggest challenge. To get things moving quickly, DevolderArchitecten and Willy Naessens Industriebouw drew up a budget based on the underlying concept. Planning permission was also applied for in two stages. The fire brigade wanted to preserve access all the way around the building. An application was therefore submitted for a design in which 45-degree sections were cut off the building’s corners to meet the requirements. This meant work could start while the team took time to develop and secure approval for an alternative route around the building without the 45-degree corners. Willy Naessens Industriebouw was involved from the outset. The company delivered the closed shell, windows, roof finish and external works, including planting.

Inspiration in the showroom
Geert Devolder did not have to look far for inspiration for his building concept. “I saw a sample in the showroom,” he explains. “The mat on which the tiles were laid, the border around it, the woven texture and the ntgrate logo. It was the perfect eye-catcher for the façade. Using rubber mats in the formwork, the Willy Naessens team made concrete panels with the look and feel of ntgrate’s samples.” The panels measure approximately 6 by 3 metres, with a 10-centimetre border in smooth concrete. The joints between the panels are sealed and finished with steel profiles.
Producing the façade panels off site presented some challenges. Willy Naessens Industriebouw used three different types of mat, laid in two directions. This resulted in six patterns in different widths and heights, as the storeys vary in height. The showroom is 3.50 metres high, the offices 3.25 metres and the technical floor just 3 metres. “In the end, we needed around twenty mats,” says Vincent De Meyer, representative at Willy
Naessens Industriebouw. “To optimise production, we reused the mats as much as possible. We normally cast elements in sequence with the build and deliver them just in time, but the complexity and variety of the elements made that impossible here. So we carefully mapped out where each one had to go, cast them all in advance and stored them ready for efficient, accurate delivery during the construction work.”

Industrial construction with architectural flair
The bar was set high not only in technical terms. This project also pushed the architect and contractor to their limits aesthetically. The windows follow the size of the façade panels, for example, and Willy Naessens Alu produced bespoke folded metalwork for the substantial window surrounds, including specially made, repeating corner pieces. All columns and beams fit within a 6-by-6-metre grid, supplemented by non-load-bearing beams to maintain the rhythm of the architecture. The project partners agree: “The difference is in the details. For example, the windows in the atrium are fitted behind the columns, and we avoided disruptive columns in the hall by choosing long-span TT concrete. This allowed us to create an industrial building with a warm, welcoming office atmosphere, where the precast concrete also serves as the finish.”
Question about this story? Ask your question
Who worked on it
Bedrijfsgebouw ntgrate in Kortrijk
- Clientntgrate
- ArchitectDevolder Architecten
- Main contractorWilly Naessens Industriebouw
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBedrijfsgebouw ntgrate
- SubjectRoofing & façades
- Companyntgrate
- CompanyDevolder Architecten
- CompanyWilly Naessens Industriebouw