Krokodiel private swimming pool, Middelkerke | Not a drop of dewatering water wasted

Building the Krokodiel private swimming pool in Middelkerke required a large construction pit. Given its specific location, securing a dewatering permit was no easy task. Nevertheless, G. Smeyers devised a solution that won approval from all the authorities involved. The pumped water was subsequently infiltrated back into the ground, a welcome measure in these times of drought!
Building the new leisure pool required a construction pit measuring approximately 100 x 40 metres. It had to be excavated from the existing ground level of +4.50 TAW down to +1.00 TAW. “Technically speaking, spanning 3.5 metres is not that difficult,” says René Lambrechts, director of G. Smeyers. “The problem, however, was the location: this new attraction in Middelkerke is right next to a protected dune area. Any adverse impact on the groundwater level could
have serious consequences for the flora and fauna. It is hardly surprising, then, that the authorities responsible, primarily the Flemish Environment Agency and the Agency for Nature and Forests, attached very strict conditions to the dewatering permit. In other words, this was a project that had to be approached with expertise. That is why main contractor Corneel once again decided to call on our expertise.”
After thoroughly reviewing the available ground investigation data, G. Smeyers proposed carrying out the dewatering within a water-retaining wall down to -10.00 TAW. “We designed the dewatering system using our own 3D computer simulation model and planned to install horizontal drains,” says René Lambrechts. “The impact of dewatering outside the construction pit was offset in two ways. First, a series of infiltration wells at the foot of the dune area. Second, the remaining pumped dewatering water was infiltrated through an infiltration field with horizontal drains. The construction pit has now been dewatered to the required depth. We are particularly proud to say that 100 % of the pumped dewatering water was in fact infiltrated.”

The dewatering system was designed using a 3D computer simulation model and installed with horizontal drains.
Building the new leisure pool required a construction pit measuring approximately 100 x 40 metres. It had to be excavated from the existing ground level of +4.50 TAW down to +1.00 TAW. “Technically speaking, spanning 3.5 metres is not that difficult,” says René Lambrechts, director of G. Smeyers. “The problem, however, was the location: this new attraction in Middelkerke is right next to a protected dune area. Any adverse impact on the groundwater level could have serious consequences for the flora and fauna in the area. It is hardly surprising, then, that the authorities responsible, primarily the Flemish Environment Agency and the Agency for Nature and Forests, attached very strict conditions to the dewatering permit. In other words, this was a project that had to be approached with expertise. That is why main contractor Cordeel once again called on our expertise.”
3D computer simulation
After thoroughly reviewing the available ground investigation data, G. Smeyers proposed carrying out the dewatering within a water-retaining wall, down to -10.00 TAW. “We designed the dewatering system using our own 3D computer simulation model and installed it with horizontal drains,” explains René Lambrechts. “The impact of dewatering outside the construction pit was offset, on the one hand, by a series of infiltration wells at the foot of the dune area. On the other hand, the remaining pumped dewatering water was returned to the ground through an infiltration field with horizontal drains. The construction pit has now been dewatered to the required depth. We are particularly proud to say that all the pumped dewatering water was actually infiltrated back into the ground.”
Een zakelijke vraag aan G. Smeyers N.V? Get in touch
Wie aan Krokodiel werkte
- main contractorCordeelIn this story
- main contractorVita GroepMentioned in State-of-the-art sports complex blends into the dune landscape
- architectSlangen+Koenis ArchitectenMentioned in State-of-the-art sports complex blends into the dune landscape
- zwembadspecialistHellebrekersMentioned in State-of-the-art sports complex blends into the dune landscape
Keep following this
Get an email when a new story is published. No account needed.
- ProjectKrokodiel
- SubjectGeneral
- CompanyG. Smeyers N.V
- CompanyCordeel