The former Federal Mogul site on Prins Boudewijnlaan in Kontich has been redeveloped as Green Business Park Gate 7. This mixed-use business park offers bespoke standalone business premises for a range of users, ‘multi-tenant buildings’ for start-ups and small and medium-sized enterprises (SMEs), and office-style SME buildings for modern industries such as IT, research and development. “The concept behind Gate 7 is to take as much of the burden as possible off end users,” says architect Filip Van Tricht. 

A beautiful green setting enhances the site.

End users at Green Business Park Gate 7 in Kontich have everything they could wish for: a fully equipped, ready-to-use working environment tailored to their activities and size. The park management looks after the construction and maintenance of roads, sewers, utility connections, signage, lighting columns, letterboxes, waste management, parking facilities, rainwater management and landscaping, allowing businesses to focus entirely on their core activities.  

The roof terrace is perfectly integrated into its surroundings.

Open versus closed

mortelmans van tricht architecten was responsible for the design, tendering and full project supervision. Five building volumes were constructed on the same principle. Facing the street, around an entrance square, four multi-storey office and laboratory buildings are linked to a row of SME units behind them. Filip Van Tricht, partner and architect at mortelmans van tricht architecten: “The street-facing buildings have fully glazed façades, with the storeys separated by projecting, continuous floor slabs in white architectural concrete. These bands accommodate the solar-control blinds and act as fire breaks between storeys and compartments. On each floor, full-height white perforated steel panels have been fitted in specific locations, clamped between white concrete bands. These perforated panels define the façade’s appearance and create a visual interplay of open and closed. They also provide a mounting surface for company logos. The façades of the multi-tenant buildings are also horizontally layered, with space for a company logo above each doorway. To make the individual SME units easier to identify, each street has been given its own colour.”

Attractive paving frames the various buildings on the site.

Compactness and considered simplicity

Each SME unit has its own heat pump, while rainwater is stored, infiltrated and reused on site. Solar energy meets the electricity demand wherever possible. A rooftop car park above the centrally located multi-tenant building eases parking pressure in the surrounding area, while also improving land-use efficiency. This reflects the pragmatic, realistic vision of mortelmans van tricht architecten, a practice specialising in commercial property that consistently strives for maximum efficiency. This is achieved, among other things, through compactness and considered simplicity. “Designing for the future is second nature to us,” says Filip Van Tricht. “From the very first sketch, we consider not only the programme as it stands today, but also the possibility of a business expanding or contracting, and of buildings or parts of buildings being divided up or repurposed. It is important for every company that its building retains its property value as an intelligent shell.”      

Businesses can display their company logos prominently.

The right project in the right place

Research and development are among the modern industries in Belgium that need the right space in the right place. These new industries do not cause adverse environmental impacts or harmful emissions, so they can be located in strategic areas on the edge of cities and close to residential centres. That is why Gate 7 is the right project in the right place. “This development stands out for its sustainable use of space, thanks to the compact buildings and the stacking of functions,” concludes Filip Van Tricht. “It has often been shown that business parks of this kind generate more stable employment while also producing fewer vehicle movements than a single large business building with the same gross floor area. The project also provided the impetus to redevelop the Prins Boudewijnlaan-Villermontstraat junction, directly helping to make this part of Kontich safer and more liveable.”    

A practical, stylish bridge linking two buildings.

Question about this story? Ask your question

Who worked on it

Green Business Park Gate 7 in Kontich

  1. clientBVI.EU
  2. architectmortelmans van tricht architecten
  3. main contractorWilly Naessens Industriebouw

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGreen Business Park Gate 7
  • SubjectConstruction projects
  • CompanyBVI.EU
  • Companymortelmans van tricht architecten
  • CompanyWilly Naessens Industriebouw
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.