Calling TVH Equipment’s new base alongside the E17 in Waregem an eye-catching landmark would be an understatement. The West Flanders family business has brought all its local operations together in a state-of-the-art headquarters, dubbed ‘Het Nest’. An apt name, given the complex’s distinctive circular form and the structural solar shading that protects employees from the heat. The iconic building not only streamlines internal operations, but also stands out as a new landmark in the area.

Under the motto ‘Rent, buy and learn from a friend’, TVH Equipment has specialised for more than fifty years in the sale, hire and maintenance of, among other things, boom lifts, telehandlers, earthmoving equipment and forklifts. The company also has its own Academy, with a VCA-accredited examination centre offering operator and safety training for all the machines in its range. The business now operates throughout Belgium, but has always remained true to its home town of Waregem. Until recently, its employees there worked from two locations. To improve internal collaboration and operational efficiency, however, TVH Equipment decided to bring everyone together in a brand-new office building with considerable architectural flair.

The courtyard garden can be reached via several external staircases and, together with the surrounding terraces, provides an oasis of calm in the industrial setting.

A carefully considered concept

The striking design is by DEMO Architecten, which created a compact volume with a distinctive ring shape. But aesthetics were by no means the only consideration, stress managing architects Levi Deryckere and Dirk Moerman. “The building programme is highly functional, as is the form of the building. No fewer than forty workshops were needed to repair and maintain large, tall machines, each fitted with generously glazed sectional doors. They are located on the ground floor and strategically grouped around a central core containing the warehouse, toilets and changing rooms. This avoids unnecessarily long walking distances and supports the logistical organisation of the 52,000 m² site, with the building acting as a roundabout for vehicles and machines coming and going. The choice of a circular structure with a diameter of more than 90 metres was therefore driven primarily by practical considerations. The concept has resulted in a compact building that makes life more pleasant for the technicians, while facilitating knowledge transfer and ensuring maximum visual contact on the shop floor. The overhead cranes are also designed to suit the circular form.” 

The architects also had to provide space for the necessary support facilities, such as a multi-purpose canteen, as well as offices for administrative staff and the ICT department. These are located on the upper office floor, with views of the workshops on one side and a pleasant courtyard garden, complete with greenery and seating, on the other. “The garden can be reached via several external staircases and, together with the surrounding terraces, provides an oasis of calm in the industrial setting,” explain Levi Deryckere and Dirk Moerman. “The exterior façade of the generously glazed office floor is fitted with structural solar shading in the form of a double layer of aluminium louvres. This diamond-shaped grid, with open apertures on the north side and denser ones to the east, south and west, is the crowning touch. It helps give the building its iconic status as a new landmark in the area. The complex also performs well in energy terms, thanks in part to geothermal heating and cooling via a BEO field.”

The support facilities and offices for administrative staff and the ICT department are located on the upper office floor.

A combination of precast and in-situ concrete 

Two renowned contractors joined forces to build the shell: Stadsbader and Willy Naessens Group. They also took on several separate work packages. “Apart from a few steel beams and some traditional masonry, the load-bearing structure consists mainly of a combination of precast and in-situ concrete,” says Lander Geerts, project manager at Stadsbader. “As well as producing and installing a share of the precast elements, each contractor had its own responsibilities. At Stadsbader, we handled the in-situ concrete work, including the basement level with underground staff parking. We were also responsible for the groundworks and landscaping, including almost 44,000 m² of paving in various types.” Willy Naessens Group, meanwhile, installed the roof covering through Mutec and the aluminium external joinery through Willy Naessens Alu. “It was quite unusual to work so closely together. Precast and in-situ concrete are two construction methods that require different approaches and have different lead times. They were closely intertwined in this building, so we had to coordinate everything very carefully to ensure a logical and efficient sequence of construction and phasing.”

“The circular form of the building, which is actually a faceted polygon, also presented some challenges. Some adjustments to the precast structure and specially designed infill elements were needed to close everything off neatly,” says Lander Geerts. 

“The surrounding site also remained in use throughout construction, and TVH Equipment’s day-to-day operations could not be disrupted. This meant that we always had to reserve a certain area for storing machines that were being hired out or sold. Another unusual detail is the service pits in the workshops. They are not supported from the basement, but were fully shuttered on site and anchored into the thick floor slab with the reinforcement in a second phase. Finally, a holding tank was cast in situ beneath high-voltage lines, where height restrictions applied. So, although there were some specific challenges, the work went extremely well, thanks to the excellent understanding between all the parties involved. Everyone always acted in the interests of the end result, which is certainly something to be proud of!”

The exterior façade of the generously glazed office floor is fitted with structural solar shading in the form of a double layer of aluminium louvres.

Scale and complexity

Like the façade, a fine interplay of precast fair-faced concrete panels, glass and solar shading at upper-floor level, the interior strikes a happy balance between high-end and industrial. “Alongside a few concrete accents, the interior finishes are based on three dominant colours: TVH Equipment’s distinctive red, neutral white and bronze-finished furniture,” says Koen Gutschoven, project manager at Holvoet Gebroeders, which acted as main contractor for the complete fit-out. “From the screed and insulation to the painter’s final brushstroke, and of course everything in between, including ceilings, plasterboard walls, glass partitions, floors and fixed furniture, we coordinated it all. A wide range of furniture with unusual shapes, bronze lacquer finishes, bespoke metalwork and various oak accents are the main visual highlights. The furniture is in prominent locations throughout the building, so it really catches the eye. The reception desk sets the tone from the outset. The result is excellent, and we have received a lot of positive feedback.”  

As a fit-out contractor, Holvoet offered the client a complete solution. “We combine our expertise in internal doors and bespoke furniture with extensive coordination and engineering,” adds Koen Gutschoven. “At Holvoet, we strongly believe in having the right person in the right place, and in combining our own strengths with those of our partners. The project manager is the key figure who ensures that the client gets a perfect end result: on time, to the required quality and within the agreed budget. Projects of this scale and complexity mean we regularly review and refine our way of working. For this project, we added an extra layer to our teams: a site manager who was on site continuously. Having him there meant we could respond quickly and effectively whenever necessary. This certainly helped us stick to the schedule. There is no doubt that this project is a milestone for our company, both in terms of scale and complexity. We were already accustomed to large-scale work on internal doors, but this is our biggest complete fit-out to date. The building’s unusual circular form also required numerous bespoke junctions and additional finishes. It was quite a challenge, but in the end everything went even more smoothly than we had hoped. We have shown that we are fully capable of delivering projects like this, and look back with great pleasure on the process we went through with the other parties involved. In short, this is something we can build on in the future, just like TVH Equipment itself!”    

TECHNICAL DATA
Client TVH Equipment (Waregem)
Architect DEMO Architecten (Izegem)
Main contractors Stadsbader (Harelbeke; earthworks, structural work and landscaping), Willy Naessens Group (Wortegem-Petegem; precast concrete structural elements, roof waterproofing and joinery) and Holvoet Gebroeders (Ingelmunster; finishing)

Een zakelijke vraag aan Stadsbader? Get in touch

Who worked on it

Het Nest in Waregem

  1. main contractorStadsbader
  2. clientTVH Equipment
  3. architectDEMO Architecten
  4. main contractorWilly Naessens Group
  5. main contractorHolvoet Gebroeders

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHet Nest
  • SubjectConstruction projects
  • CompanyStadsbader
  • CompanyTVH Equipment
  • CompanyDEMO Architecten
  • CompanyWilly Naessens Group
  • CompanyHolvoet Gebroeders
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.