Construction projects

A new lease of life for the brewery

De achtergevel kreeg nog een extra dimensie dankzij de prefabbalkons, die bekleed zijn met hoogwaardige metalen gevelpanelen.
De achtergevel kreeg nog een extra dimensie dankzij de prefabbalkons, die bekleed zijn met hoogwaardige metalen gevelpanelen.

The area around West Station in Sint-Jans-Molenbeek is undergoing a major transformation. The regeneration of the entire neighbourhood began on the former Vandenheuvel brewery site, which has been given an impressive new purpose and is now home to numerous new buildings. The latest development there is ‘Go West’, a striking complex providing 31 flats, a shop and a nursery. Its clean, distinctive architecture, combined with a crisp pattern of white and grey, brings a fresh touch that sets it apart in the neighbourhood.

‘Go West’ was built to the passive house standard, with 30% of the flats being energy-neutral.

‘Go West’ forms part of the larger ‘Ekla’ regeneration programme, named after one of Vandenheuvel’s beers. After the brewery closed in the 1970s, the site lay derelict for decades. In 2013, Revive, a specialist in brownfield redevelopment, bought the block to launch the ‘Ekla’ regeneration programme: a 22,000 m² project comprising a hotel, shops, offices, a primary school, student accommodation and homes sold at market rates. citydev.brussels, the leading public-sector property developer in Brussels, joined the project and bought part of the site, around 1,400 m², for ‘Go West’. The public agency issued a design and build contract, which was awarded to architecture practice A2M and property developer Ciril, part of Democo Group. 

‘Go West’ includes 31 flats, all finished to a very high standard.

A mix of uses

Construction of the brand-new building began in 2018, with a green space to be created alongside it at a later date. To create a sense of dynamism, the architecture practice designed a scheme that rises from three to six storeys above ground. This provides a usable floor area of just over 3,800 m². In addition to a nursery for 36 children and a 45 m² retail unit, the building has 31 regulated-price flats with two, three or four bedrooms. Although the interior finishes are standard, quality was a clear priority. There is also a basement level containing plant rooms and a 740 m² car park.

An angled façade

The building has a plinth clad in dark brown brickwork. Above it, the front façade is defined by a pattern of white and grey render. “The rear façade gains an extra dimension from the prefabricated balconies, clad in high-quality metal façade panels,” says Francis Heeb, project manager at Democo, the construction company that acted as main contractor on the project. “On the Ninoofsesteenweg side, the architects designed a strikingly ‘angled’ façade, clad in metal cassettes that shift slightly from floor to floor. This clever architectural move gives the building a particularly dynamic appearance.” 

An angled façade was created on the Ninoofsesteenweg side, clad in metal cassettes that shift slightly from floor to floor.

Unforeseen obstacles

‘Go West’ was built to the passive house standard, with 30% of the flats being energy-neutral. “We achieved this by combining high insulation values, careful detailing of thermal bridges, a very high level of airtightness, communal heating, PV panels and a CHP unit to recover energy,” explains Francis Heeb. “However, achieving this target was not the main challenge. The biggest difficulties arose at the outset. The site proved to be relatively contaminated and also contained numerous old foundations and a large, thick reinforced concrete slab. This inevitably meant unforeseen groundworks to remediate the site, resulting in a considerable amount of additional work and delays during construction. Fortunately, citydev.brussels responded appropriately and provided the funds needed to overcome this obstacle. From a construction perspective, the ‘angled’ façade was a real technical feat, both in terms of stability and finish. Although there were times when we were at our wits’ end, the result certainly meets expectations. We delivered an excellent record for quality and programme. We also scored highly on airtightness, the number of snagging items, fewer than one per flat, and overall customer satisfaction. ‘Go West’ shows that close collaboration with a funding public authority and thorough preparation can deliver real added value.”

The front façade is defined by a pattern of white and grey render.

The next step: large-scale transformation

Benjamin Cadranel, Director-General of citydev.brussels, is also particularly pleased with the result. “‘Go West’ is a top-class project on a very complex site, so hats off to the architects and contractor. Delivering projects like this requires a strong partnership. ‘Go West’ offers a taste of the huge challenges that still lie ahead in the area around West Station. The Brussels Government has asked us to act as coordinator there. In the years ahead, citydev.brussels will therefore be working hard to transform the vacant land into an attractive mixed-use development that creates jobs and provides services and amenities, while also making affordable, high-quality homes a priority.” 

Smeets Laswerken: aluminium cladding and glass and steel balustrades

The architectural vision for Go West was brought to completion thanks to the craftsmanship of Smeets Laswerken (Hechtel-Eksel). This specialist in decorative metalwork for the construction sector had a major impact on the building’s appearance. “We were asked to bring the cantilevered terraces and twisted façade together as a single composition,” says managing director Wouter Smeets. “Specifically, we supplied the aluminium cladding and the glass and steel balustrades. The twisted façade made this a challenging job. We therefore began by carrying out a 3D scan, which we then converted into an accurate construction drawing. As a result, the columns and glass balustrades align perfectly with the twisted façade.” Smeets Laswerken once again demonstrated its wide-ranging expertise on this project. “Our work spans everything from metal stairs and handrails to balustrades and aluminium cladding,” Wouter Smeets continues. “Go West gave us the opportunity to showcase several aspects of our expertise. It is therefore a valuable addition to our extensive portfolio of diverse projects across Belgium.”

PROJECT DETAILS

Client
Ciril (Brussels) 

Contracting authority:
citydev.brussels (Brussels)

Architect
A2M Architecten (Brussels)

Main contractor(s)
Democo (Brussels)

Question about this story? Ask your question

Who worked on it

Go West in Sint-Jans-Molenbeek

  1. Aanbestedende overheidcitydev.brussels
  2. ClientCiril
  3. ArchitectA2M Architecten
  4. Main contractor(s)Democo

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGo West
  • SubjectConstruction projects
  • Companycitydev.brussels
  • CompanyCiril
  • CompanyA2M Architecten
  • CompanyDemoco
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.