Het Royale Belge-gebouw kwam in 2017 leeg te staan.
With its orange windows and Corten steel substructure, the building constructed in the late 1960s for the insurance company Royale Belge is an emblematic feature of Brussels. The landmark, designed by René Stapels and situated on the edge of the Sonian Forest beside the Tenreuken pond, stood empty for several years, after which it fell into disrepair. The developers who bought the building therefore decided to renovate it before giving it a new purpose with a mix of uses. CIT Blaton carried out the full renovation. “This was far from a routine project and came with its fair share of challenges,” says Daan Watté, senior project manager at CIT Blaton.
The Royale Belge building, a cross-shaped tower rising eight storeys above a large two-storey podium, stood empty in 2017 when AXA, which had merged with Royale Belge in 1990 and retained its name, moved out. Various property developers were keen to redevelop the now listed building straight away, but it was not until 2019 that Souverain 25, a consortium of CORES Development, Urbicoon, Foresite and Ape, was able to breathe new life into the building and its distinctive architecture. The design competition organised by the City of Brussels was won by London-based Caruso St John’s Architects and Antwerp-based Bovenbouw Architectuur. The detailed design was then developed in the midst of the Covid pandemic. Brussels-based DDS+ joined the project at this stage.
Alongside its distinctive form, the use of Corten steel is another defining feature of the building (photo, April 2023).
Souverain 25’s aim was to transform the Royale Belge building through a limited number of interventions, while retaining its characteristic features, into a building with a total floor area of 80,000 m². It now houses a 180-room hotel, a fitness and wellness centre, restaurants, meeting rooms, an event space, coworking spaces, offices, archives, plant rooms and a three-storey underground car park. In other words, the building was given a new use that would open it up to the general public, allowing everyone to experience the grandeur of this remarkable structure. Naturally, the building also had to meet current EPB standards and fire safety and circulation requirements following the upgrade.
Tenants moved into the first offices in April 2023. The hotel, wellness centre and fitness facilities opened in June 2023. The project was completed in autumn 2023.
Facades completely renewed
CIT Blaton was the project’s main contractor, having been awarded the general construction contract in August 2021. “Once the entire building had been stripped out, we completely renewed the facades, replacing the secondary Corten steel structures, all the joinery and the glazing, including that of the podium, in close collaboration with our subcontractor Kyotec Group. The primary Corten steel structures, the profiles that transfer the load from the entire cross-shaped section of the building to the concrete beams on top of the podium, formed part of the building’s load-bearing structure, so we left them untouched. We also largely refurbished the Corten steel balustrades around the level 2 terraces,” begins Daan Watté, senior project manager at CIT Blaton, describing the scope of the works. “We also renewed the flat roof waterproofing and installed as much high-performance insulation as possible.”
“Inside, we completely renewed all the building services,” he continues. “We installed new HVAC and plumbing systems, new electrical wiring, sprinklers, new lifts, lightning protection … We also took care of the interior finishes, tailored, of course, to the use of each space.”
CIT Blaton also carried out the landscaping. “Stairs and paths, green roofs, terraces with large-format paving slabs, and the connection of the rainwater drainage to the pond,” Daan Watté lists.
The building’s distinctive facades were completely renewed (photo, April 2023).
Challenges
CIT Blaton also carried out several structural works, which presented their own challenges. Daan Watté explains: “Two 25-metre concrete pool tanks had to be suspended from the existing structure of the former car park for the two swimming pools in the fitness area. This proved quite a complex undertaking, especially as several movement joints also ran through the existing column and beam structure. The overall stability of the structure was a constant concern throughout this intervention.
“The same was true of the atrium, with new circulation routes around it, created within the existing structure. I would certainly call it a tour de force on our part. We had to demolish adjacent load-bearing structures and replace them with new ones, without touching any of the building’s special features, such as the white marble on the walls and floors.
Working very closely with our in-house engineering department, structural engineers ELLYPS (now Lemaire Ingénieurs, ed.) and inspection body SECO, we devised a special propping and support system that enabled us to carry out both the demolition and construction of the new structures. Four steel columns were installed where the future concrete columns would stand, temporarily supporting the roof beam structure. Other load-bearing elements below were then demolished, down to ground-floor level. We then constructed the imposing new concrete columns and walls, from which a floating staircase was subsequently suspended. The walls were made using a concrete mix intended to match the old concrete. After the formwork was removed, the walls were shot-blasted. Finally, the floors were ‘concreted back onto’ the concrete walls to make them load-bearing.”
The site was challenging for CIT Blaton for other reasons too. “During the strip-out, the building revealed a few more secrets, so we had to deal with quite a lot of surprises and unforeseen issues,” says Daan Watté. “The exceptionally short time between the contract award and the start of the works also left barely any time to carry out the detailed design studies thoroughly and in a coordinated way.”
Creating an atrium within the existing structure, with imposing concrete columns, was a tour de force for CIT Blaton (photo, April 2023).
Pride
CIT Blaton brought the project to a successful conclusion, to the satisfaction and pride of the senior project manager. “As main contractor, we brought in a large team of specialists in every discipline from day one. To organise the approximately 400 workers on site over the entire duration of the project, we also deployed a team of seven site managers and assistant site managers. Close collaboration with the engineering teams of subcontractors Cegelec, ITB, Le Sprinkler Rationnel and Van Hoey helped us identify and resolve many obstacles shortly before work began. In short, this was far from a routine project. It took a great deal of focus from the whole team to complete the work within the tight timeframe,” concludes Daan Watté.
One final point: the project won two awards at the renowned MIPIM property fair in Cannes, for best mixed-use project and best redevelopment. It is unusual for a Belgian project to win an award there, let alone two.
CIT Blaton also renovated the building’s interior (photo, April 2023).