Construction projects

A sustainable, versatile meeting centre

Text Kris VandekerckhoveImage AB-Eiffage

Een bijzonder aspect van het project is de integratie van de kapel van het voormalige klooster.
Een bijzonder aspect van het project is de integratie van de kapel van het voormalige klooster.

Kloosterdomein in Knesselare is an impressive project introducing a new meeting centre in the municipality of Aalter. The initiative is testament not only to modern architectural progress, but also to a strong focus on sustainability and multifunctionality. To make way for the new-build project, the old monastery in Kloosterstraat was demolished, with the exception of the chapel, which has been beautifully integrated into the contemporary complex.

Aalter can be proud of its new meeting centre.

Ing. Nico Godderis, Production Director at AB-Eiffage: “The new-build project placed a strong focus on sustainability, combined with technological progress. The use of geothermal heat pumps for heating and cooling makes the building virtually energy-neutral. This makes the project an excellent example of how modern construction methods can contribute to a sustainable future. One particularly notable aspect of the project is the integration of the chapel from the former monastery. It has been preserved as a reminder of the past and given a new purpose as an outdoor play area, covered stage, reception area and exhibition venue. This creates a harmonious connection between history and modernity.”

With capacity for ninety children and facilities including a quiet room, a sleeping room, a playroom and a playground, the centre provides a safe and stimulating environment.

Multifunctional spaces

On the south side of the building is a versatile space that can be divided into three separate rooms using insulated sliding panels. This flexibility makes it suitable for a range of activities, including meetings, lessons and small-scale events. It gives associations and local groups the opportunity to adapt the space to their specific needs.

The meeting centre has a 380 m² event hall, equipped with the latest technology and an electronically retractable grandstand. Depending on the layout, the hall can accommodate between 200 and 350 people. It is ideal for musical performances, theatrical productions and other large-scale events, making the centre an important cultural hub for the region, without a doubt.

Behind the event hall is a fully equipped professional kitchen. This facility makes it possible to provide catering for a range of events. The kitchen is also an excellent venue for cookery workshops, where participants can learn and try out new skills in a professional setting.

Three music rooms have been fitted out with the latest technology in electronics and acoustics.

A home for readers and musicians

The new library has been designed with extensive glazing, creating a bright and welcoming space with beautiful views of the Hellemeersen. This makes for a pleasant environment in which to read and study. In addition, three music rooms have been fitted out with the latest technology in electronics and acoustics. These rooms support the Academie voor muziek, woord en dans and Knesselaars Muziek- en Toneelonderwijs (KMTO), as well as other local music and theatre groups.

The centre offers spacious out-of-school childcare (BKO) for Knesselare’s youngest residents. It caters for children aged 2.5 up to primary school age, both before and after school and on school-free days and during holidays. With capacity for ninety children and facilities including a quiet room, a sleeping room, a playroom and a playground, the centre provides a safe and stimulating environment.    

PROJECT DETAILS
Client Municipality of Aalter
Architect BASIL architecture (Aalter)
Main contractor(s) AB-Eiffage (Antwerp)

Question about this story? Ask your question

Who worked on it

Kloosterdomein in Aalter

  1. clientGemeente Aalter
  2. architectBASIL architecture
  3. main contractorAB-Eiffage

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKloosterdomein
  • SubjectConstruction projects
  • CompanyGemeente Aalter
  • CompanyBASIL architecture
  • CompanyAB-Eiffage
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.