Aircraft maintenance in style

The Ministry of Defence is renewing its equipment and infrastructure. The ageing aircraft are gradually being replaced by A400M transport aircraft. As these are considerably larger than their predecessors, the Ministry decided to build a new maintenance hangar. The plans have resulted in a structure that breaks with the traditional image of anonymity. Instead, the choice was made to create a striking volume that leaves an architectural mark on Melsbroek military airport.

With a floor area of 26,000 m², the maintenance hangar is the largest building of its kind ever commissioned by the Ministry of Defence. The project took a relatively progressive approach, opting for a public-private partnership in the form of a DBFM contract. “This was a sensible choice, as the complex schedule of requirements had to be reconciled with numerous conditions imposed by government authorities, aviation bodies and the immediate surroundings,” says architect Luc De Hovre of styfhals architecten. “It was a challenging project that called for a strong team with a wide range of skills. That is why Kardham Cardet Huet Architecture from Toulouse, France, also joined the team. The firm has extensive experience in designing aviation infrastructure, particularly for Airbus aircraft.”

A roofline with a dual purpose
It is difficult to describe the new building for the A400M aircraft as a hangar. For one thing, it accommodates far more than just maintenance space for three aircraft. It also includes offices, staff facilities, workshops, storage areas and more. For another, its architecture breaks with the traditional image of a hangar. “The project team unanimously decided to take a different approach. We did not want to build yet another anonymous aircraft hangar alongside the airport,” explains Luc De Hovre. “We opted for a striking undulating roofline that references the old maintenance hangars built for the aircraft of the 1950s. At the same time, this structural element played an important part in optimising the complex steel roof structure. The curved roof beams enabled us to use a relatively lightweight steel structure. The existing difference in ground levels was used to create a semi-sunken covered car park beneath the workshops. Restrained use of materials and refined detailing make the hangar, despite its size, a calm new landmark in its surroundings.”

Maximum sustainability and safety
The A400M hangar is progressive not only in its appearance. It is also an exemplar of sustainable design. Naturally, great attention was paid to insulation and airtightness. The roof also has an overhang that provides additional solar shading. “The technical systems were also selected with their energy consumption in mind,” says Luc De Hovre. “Industrial underfloor heating has been installed throughout the hangar. Safety, and fire safety in particular, was also carefully addressed. The standout feature in this respect is the advanced automatic fire suppression system, with sprinklers, infrared cameras and foam monitors.”

No internal support columns
The construction group that bid for the project’s DBFM contract was Democo. The construction company is part of Limburg property giant Democo Group. “We specialise in residential, commercial and industrial projects, as well as offices that add value for people and their surroundings,” says strategy & marketing director Thomas Bijnens. “Working as part of the project team, we played an active role in developing the concept. We were also responsible for the construction work, from the foundations through to the final finishes. From a construction perspective, this project was certainly a challenge. The maintenance hangar measures no less than 75 by 185 metres. However, the specification called for a solution without internal support columns that could potentially hinder the building’s functionality. We therefore had to ensure that the entire roof structure was supported solely by the hangar’s perimeter.”


A remarkable feat
Another technical feat was installing three gigantic hangar doors, which together span the width of an entire football pitch. In addition, numerous existing underground services on the site, including high-voltage cables, telephone lines and data cables, had to be rerouted. “To make things even more complex, at one point we even came across an unexploded World War II bomb, which had to be dismantled on site by DOVO,” says Thomas Bijnens. “The coronavirus crisis also created unforeseen challenges. For a time, there was some uncertainty around deliveries, and our employees had to take additional precautions. Nevertheless, we managed to complete everything on time, which was quite a feat. This project confirms just how much we have grown as a company in terms of flexibility and resilience. Of course, its successful delivery is also the result of exceptionally good and professional cooperation with all the team members, partners and, naturally, the client. Democo has shown how DBFM projects like this can deliver a win-win for all parties.”
Een zakelijke vraag aan TROX? Get in touch
Who worked on it
- ClientMinisterie van Defensie (Brussel)
- Architectstyfhals architecten (Machelen) en Kardham Cardet Huet Architecture (Toulouse, Frankrijk)
- Main contractor(s)Democo (Hasselt)
- Also involved
TROX
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyTROX