An imposing landmark on Zuidkaai

As a renowned family business, Moderna Products has been manufacturing innovative plastic products for pets since 1932. To sustain its growth, the company moved to a larger building that seamlessly integrates offices, production and storage.
In recent years, the third generation at the helm of Moderna began to feel that the company was outgrowing its premises. So it moved to a new site on Zuidkaai in Izegem. Just a few kilometres from the old headquarters, but in a more strategic location by the canal that will enable Moderna to continue growing. The company took over a 28,500-square-metre site with existing warehouses. Moderna called on the experience of AAVO Architects for its new factory with high-bay warehouse.

Concrete construction was chosen for its durability and strength. The building has no gas connection, as it is heated using waste heat recovered from production. “Cooling water is used during the injection moulding process, and the heat generated is recovered,” explains managing director Bart Bonte. The roofs are fitted with 6,500 solar panels, and underfloor heating and climate ceilings have been installed in all the offices. The offices face north. This provides plenty of natural light, while limiting heat gain and glare.

Production hall across multiple levels
Moderna’s production runs 24/7 on a five-shift system, but capacity needed to increase. “The old site was packed with 25 injection moulding machines,” says Bart Bonte. “The new factory has room for 58 injection moulding machines.” Moderna is starting with 33 machines, but this will ensure scope for future growth. “We want to use new materials in our machines, with a particular focus on recycled raw materials.”
The production hall extends across several mezzanine levels, giving staff a clear overview of the shop floor. The workers’ ergonomics were also an important consideration. There are four overhead cranes, each with a lifting capacity of up to 20 tonnes. Cleanliness was another priority. Anything that generates noise or dust is housed in a separate, enclosed space.

The construction of a 40-metre-high warehouse with automated handling for around 12,500 pallets, together with a 3,500-square-metre packaging area on the upper floor, made it possible to accommodate the client’s brief on the limited site. The project is an example of efficient land use in a region where land is in short supply. Architecturally, this results in an impressive interplay of volumes. Light grey tones were chosen to minimise the building’s impact on its surroundings.
A new way of working
Combining the existing warehouses with the new factory brought its share of challenges. Lieze Vergauwe explains: “We submitted various designs, from which we distilled the optimal functionality, resulting in a clear circulation loop. A tight schedule and clear phasing were essential.” The combination of a 5,500-square-metre production floor, high-bay storage and six loading bays also enables a different way of working. Moderna can now handle three lorries an hour.
A good connection between production, storage and the office was crucial. Large sections of fire-resistant glazing provide transparency and strengthen the link between production and the administrative team. “Plenty of light is also important so that we can always check the colour and quality of our products accurately,” says Bart Bonte.

The offices span three levels and are spaciously designed. The aim is for every employee to find a quiet place in the communal areas for internal meetings, Teams calls and breaks. This approach was also shaped by new insights gained during the coronavirus crisis. A pleasant dynamic emerges between individual offices, meeting rooms, open spaces and a creative room where the R&D and marketing teams can freely share ideas. The fourth floor houses a showroom and event space with a roof terrace overlooking the canal. All departments come together to unwind in the welcoming cafeteria. Finally, employees can let off steam around the football table, at the dartboard or on the padel court.
Have a business enquiry for Beeuwsaert Construct? Get in touch
Who worked on it
- ClientBart Bonte (Izegem)
- ArchitectAAVO Architects (Kortrijk)
- Main contractor(s)Beeuwsaert Construct (Ledegem)