De Gaanderij is een residentieel geheel met acht stijlvolle gebouwen die eenheid in verscheidenheid prediken en ook qua energie-efficiëntie niets aan het toeval overlaten.
De Gaanderij is een residentieel geheel met acht stijlvolle gebouwen die eenheid in verscheidenheid prediken en ook qua energie-efficiëntie niets aan het toeval overlaten.

Historic architecture combined with contemporary comfort: that is the vision behind De Gaanderij in Herentals. The project has delivered, transforming the former school building of the Sint-Jozefsinstituut without compromising the familiar streetscape or the visual connection with the adjacent beguinage. A number of complementary new residential blocks and a car-free courtyard complete the picture. This distinctive mix of new-build and renovation has resulted in a charming development comprising 85 energy-efficient apartments and six cosy townhouses, all due to be handed over as planned from the end of November.

Its central location and car-free courtyard, with private and communal green spaces, are also unique assets.

It is always a shame when historic buildings that form part of our collective memory simply disappear. Fortunately, property developer Van Roey Vastgoed and main contractor Artem have brought the best of both worlds together in the charming town centre of Herentals: preserving the heritage of the old school buildings of the Sint-Jozefsinstituut while delivering a forward-looking residential development that more than meets all modern requirements for aesthetics, sustainability and living comfort. They appointed 360 architecten to create a timeless and fitting interplay between past and present. 

The characteristic architecture of the original school buildings, dating from 1904 and 1914, was central to the design.

Unity in diversity

The characteristic architecture of the original school buildings, dating from 1904 and 1914, was central to the design. Two of the blocks were given a new purpose, while their original façades were retained (‘Aula’ and ‘De Kapel’). In the monumental third building (‘Rector’), most of the internal walls were also preserved, allowing its architectural grandeur, distinctive detailing, high ceilings and large windows to shine. Only the magnificent front façade was retained of a smaller historic building on Fraikinstraat (‘Corridor’), which originally housed nuns. The other blocks and playgrounds of the former Sint-Jozefsinstituut made way for four new-build volumes. These have a slightly more contemporary appearance, yet fit clearly into the overall scheme, thanks in part to the choice of facing bricks in complementary soft shades. Three of these blocks (‘Magnolia’, ‘Foyer’ and ‘Entrée’), together with the renovated sections, provide space for 85 apartments ranging from 58 to 164 m². 

The fourth new-build volume (‘De Gaard’) houses the townhouses, which range from 120 to 161 m². The result is a unified residential development of eight stylish buildings that combine variety with a coherent identity, while leaving nothing to chance in terms of energy efficiency. All homes are heated and cooled without gas using individual water-to-water heat pumps connected to a shared aquifer thermal energy storage system. The central location and car-free courtyard, with private and communal green spaces, are also unique assets.

Every effort was made to preserve the heritage of the former Sint-Jozefsinstituut.

Different levels of renovation

Creating a future-proof residential development in the heart of a city centre while showing the utmost respect for historic heritage is no easy task. Artem rose to the challenge and delivered an excellent result. “We became involved in the project as the design was being finalised, to make a few optimisations and carry out destructive investigations in some of the existing sections,” says project manager Simon Huygen. “The combination of new-build and different levels of renovation naturally made this a special project. In ‘Aula’ and ‘De Kapel’, we effectively inserted a new-build structure within the existing footprint, structurally anchored to the surrounding façades. In ‘Rector’, by contrast, we replaced only the floors and roof and installed new stair and lift cores, while retaining the façades and most of the internal walls. Once these buildings had been stripped back, we commissioned a 3D scan to map everything accurately in BIM. One of the main technical challenges was coordinating demolition, façade bracing and rebuilding. This required carefully planned phasing to ensure stability, as openings had to be made in the façades at ground-floor level to create the apartments, including the installation of new concrete beams. It was a delicate operation, but fortunately it went smoothly. In ‘Rector’, we mainly used in-situ concrete and concrete blocks to allow maximum flexibility in fitting everything together. In the other renovated blocks and the new-build volumes, we opted for a more conventional construction, with precast concrete floors and calcium silicate block internal walls.”

The new-build volumes have a slightly more contemporary appearance, yet fit clearly into the overall scheme, thanks in part to the choice of facing bricks in complementary soft shades.

Right on schedule

Demolition began in spring 2022, and Artem started rebuilding and constructing the new residential buildings in November 2022. “We had 24 months to complete the work and we’re right on schedule,” says Simon Huygen. “Our work will be finished by the end of November, with the first handovers taking place in December. These will continue until February 2025 as the landscaping is completed. The provisional end result already looks excellent. Everyone is hugely enthusiastic about it. It is a project we are very proud of, because, apart from the landscaping of the public areas, we have handled everything: from demolition and groundworks through to the structural work, finishes, building services and painting. We worked block by block, with the necessary overlap. Thanks to the highly constructive collaboration with the other parties involved, which I have rarely seen run so smoothly, we have managed to meet the very tight schedule and live up to high expectations.”    

Een zakelijke vraag aan RG Tegel? Get in touch

Who worked on it

De Gaanderij in Laakdal

  1. vloer- en wandafwerkingRG Tegel
  2. clientVan Roey Vastgoed
  3. architect360 architecten
  4. architectARAT: architecten
  5. main contractorArtem
  6. aluminium buitenschrijnwerkVossal

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Gaanderij
  • SubjectAntwerp
  • CompanyRG Tegel
  • CompanyVan Roey Vastgoed
  • Company360 architecten
  • CompanyARAT – architecten
  • CompanyArtem
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.