Bottling plant as a landmark

A unique new-build, but certainly no run-of-the-mill industrial building. At the same time, it is a landmark that underscores the brewery’s connection with the city of Bruges. That was the ambition of Brouwerij De Halve Maan. An impressive building has therefore risen beside the Expresweg, distinguished by its connectivity and innovative spirit.

In 2005, Xavier Vanneste breathed new life into Brouwerij De Halve Maan, which has been in existence since 1856, with the launch of Brugse Zot. The brewery became a landmark in Bruges city centre and continued to grow at a dizzying pace. In 2010, the bottling plant moved to an industrial site on the outskirts of the city. Since 2016, a 3.3-kilometre underground beer pipeline has connected the two locations. It gradually became clear that the bottling plant was bursting at the seams. A major expansion was needed. The brewer acquired two adjoining plots on the industrial estate and commissioned Beeuwsaert Construct to build a breathtaking industrial facility to a design by Architecten Groep III.

Industrial construction 2.0
“The expansion of Brouwerij De Halve Maan is about more than creating extra space,” says Hein Verbeke, architect at Architecten Groep III. “Xavier Vanneste wanted a distinctive building, a statement. That fits perfectly with our vision of industrial construction 2.0. The entrepreneur understands that investing in an attractive building with added value can act as a draw for (potential) customers. The old bottling plant’s prime location gave us a huge opportunity. You can see the brewery almost every time you enter or leave Bruges. Did you know people now say ‘Brugse Zot exit’ rather than ‘Bruges exit’? In West Flanders, the new building is a true landmark.”
The design is characterised by large glazed areas, both on the exterior façade and inside the building. The bottling plant, its main function, is located at the centre of the building. Space has been created around it for a range of ancillary activities: a warehouse, warm room, office, underground car park, tank installations, laboratory, reception areas and dining areas. “Everything actually flows into everything else,” says Hein Verbeke. “Glass creates attractive sightlines. From the entrance, for example, you can look straight into the bottling plant and the tank park. The connectivity inside the building allows for a smooth flow and a high degree of transparency.”

Building around the bottling plant
Work began in 2019. “The intention was to deliver the entire complex in one go,” says Hein Verbeke. “For well-known reasons, we suffered delays in 2020. We then shifted our focus and set ourselves the goal of getting the bottling plant operational as soon as possible.” The first step was to pinpoint the beer pipeline’s location on the new site. The basement was also constructed. “The initial phases went very smoothly,” says Mathias Despriet, project manager at Beeuwsaert Construct. “Within a few months, the basement was already closed in and we were able to pour the bottling plant’s floor slab. The construction process was complicated by the fact that this area was right in the middle of the site, yet was due to be brought into use first. The challenge was to get the space ready on time, while also keeping it clear for the start-up of the brewing equipment and maintaining our own efficiency when building the adjacent and overlapping structures.” At the end of 2020, the bottle washer, a machine weighing more than 65 tonnes, arrived on site. To install it, the basement was given additional supports and the site surveyor mapped out an access route.
The bottling plant has been operational since April 2021. The keg line processes up to 180 kegs per hour, while the bottle line handles 24,000 bottles per hour. This has tripled the brewery’s capacity. The technology in the brand-new production hall reflects a strong commitment to innovation. Brouwerij De Halve Maan aims to brew beer as close to energy-neutral as possible. It uses the best available techniques in terms of energy and raw materials. The brewery has a water treatment plant, and waste heat from production is used to heat the offices. In summer 2022, further investment was made in solar panels and a green roof to reduce its environmental impact even further.

Familiar prefabrication and new challenges
In this complex construction process, Beeuwsaert Construct’s expertise in prefabricated construction was a godsend. Using prefabricated units for both stairwells meant there was no need to pour concrete alongside the bottling plant’s brand-new floor. This enabled the contractor to make rapid progress. At the same time, the project involved several firsts for Beeuwsaert Construct. Sections of the windows and façade cladding, for example, were installed using suspended platforms. As the bottling plant was already operating at full capacity by then, Beeuwsaert Construct had to revise its planned approach. This avoided disruption to the bottling plant below and allowed the façade to be completed without a hitch. Another example was the use of prefabricated architectural concrete for the ceiling. Mathias Despriet says: “The tank park structure was designed entirely in situ, but prefabrication enabled us to achieve a visually equivalent, or even better, end result more quickly. Flexibility really made the difference during this construction process. At the same time, coordination with the subcontractors was tight. Together, we ultimately brought everything to a successful conclusion.”

Golden box connected to Bruges
The façade is clad in gold-coloured profiled aluminium sheeting, a clear reference to the beer, according to Hein Verbeke. “The gold also gives the building extra distinction.” The beer’s colour is echoed in the interior, for example in the majestic 19-metre spiral staircase, installed in one piece. The brewery also maintains a visual connection with Bruges. From the tasting room and the two terraces, visitors can look out over the three towers in the city centre. The gleaming brewery was officially opened in September. “We are extremely proud of this project and look back with satisfaction on our first collaboration with Architecten Groep III. We would certainly work together again,” concludes Mathias Despriet.

Have a business enquiry for Beeuwsaert Construct? Get in touch
Who worked on it
Bottelarij Brouwerij De Halve Maan Brugge in Brugge, nieuwbouw
- main contractor
Beeuwsaert Construct - ClientBrouwerij De Halve Maan
- ArchitectArchitecten Groep III
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBottelarij Brouwerij De Halve Maan Brugge
- SubjectConstruction projects
- CompanyBeeuwsaert Construct
- CompanyBrouwerij De Halve Maan
- CompanyArchitecten Groep III