Brielpark, Maldegem | Demand-controlled ventilation guarantees ultimate living comfort at Brielpark

Brielpark is a handsome new-build development in Maldegem. The 27 houses and 21 flats are set in a green environment, just a stone’s throw from the town centre. Every home is finished to the last detail with modern, sustainable materials, including a high-performance ventilation unit that guarantees ultimate living comfort.

With a reduction factor of 0.43, the DucoTronic System perfectly meets all the requirements.
Brielpark was developed through the conversion of a former sawmill. “The construction brief called for an economically attractive ventilation system with a specific reduction factor,” says Wouter Reynaert, project manager at installation company Air Technologies. “We compared a great many ventilation systems. The DucoTronic System, with its reduction factor of 0.43, proved to be a perfect fit for our requirements.” The DucoTronic System was developed by Duco. “It is a demand-controlled ventilation system requiring a minimum of ductwork,” says Dirk Stevens, sales manager at Duco. “That has a positive impact on the price. It is no coincidence that the system has become the standard for ventilation in new-build projects.”
Optimal indoor climate
“The demand-controlled ventilation system uses electronically controlled TronicTop 60 supply grilles,” explains Dirk Stevens. “In living rooms, these are automated window grilles, while bedrooms have self-regulating grilles. The DucoBox Focus extracts polluted air from the bathroom, kitchen and toilet. Integrated humidity and CO2 control valves monitor the indoor climate. The intelligent control system ensures that the valves close as soon as the indoor climate is optimal again, resulting in significant energy savings.”
Taking the burden off the installer

The demand-controlled ventilation system uses electronically controlled TronicTop 60 supply grilles.
In living rooms, these are automated window grilles.
“As the manufacturer, Duco provided the support we needed on this project,” says a satisfied Wouter Reynaert. “Once we had installed the cast-in ducts, all that remained was the window grilles. That was when Duco stepped in. The internal parts of the grilles are kept in stock, and the service department then visits during the finishing phase to fit them itself. Now that’s service! There are projects where we run into all kinds of problems, but everything went smoothly here.”
Have a business enquiry for DUCO? Get in touch
Who worked on it
Brielpark in Maldegem, nieuwbouw
- ventilation system
Duco - building services contractorAir Technologies
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBrielpark
- SubjectConstruction projects
- CompanyDUCO
- CompanyAir Technologies