Construction projects

Challenging CLT structure for Europe’s largest indoor e-karting circuit

Text Tim Janssens, Rose’s Natural HomesImage Rose’s Natural Homes

Challenging CLT structure for Europe’s largest indoor e-karting circuit

On 20 June, Experience Factory finally opened at the former General Motors site in Antwerp. This versatile 20,000 m² entertainment centre includes an e-karting circuit that spans three floors and is more than 1.1 kilometres long, making it the largest of its kind in Europe. This ambitious project was made possible by the expertise of timber construction specialist Rose’s Natural Homes, which was responsible for the design and construction of several large-scale structural elements in CLT: a 3,000 m² mezzanine floor, a 120-metre-long fire corridor and two 12-metre-high escape stairwells. No fewer than twenty lorry loads of CLT were delivered to the site.

The project involved particularly demanding technical, financial and logistical requirements. It also called for exceptional adaptability from the teams carrying out the work. “After an in-depth study of the requirements, we proposed a more cost-effective alternative to the client without compromising the required technical performance,” say Luc Rose and Maxime Cruysmans, CEO and project engineer respectively at Rose’s Natural Homes.

Installing the upper section of the escape stairs, located in the centre of the building, presented a complex challenge.

A unique reference

“One of the biggest challenges was that the entire structure had to be fire-resistant (RF),” explains Maxime Cruysmans. “The mezzanine floor had to provide 60 minutes of fire resistance, while the fire corridor and escape stairwells had to withstand fire for 120 minutes. We achieved this with ease using CLT panels thick enough, up to 16 cm.”

Logistics on site also proved complex. “Our work took place at a height of 21 metres in a completely enclosed space, which placed significant constraints on delivery and assembly. Among other things, we had to manoeuvre our prefabricated structures between existing steel trusses, making installation considerably more difficult.”

A 60-metre-high tower crane was used to install the upper section of the stairs, which are located in the centre of the building. The section was lifted into place through an opening in the ceiling, via the roof. “It was a delicate operation, which we prepared down to the last detail using advanced 3D models. Our teams on site then carried it out with millimetre precision,” adds Luc Rose.

For the Experience Factory project, Rose’s Natural Homes was responsible for the design and construction of several large-scale structural elements in CLT.

A lasting partnership

Luc Rose looks back on this special project with great satisfaction: “Our collaboration with both clients, Erwin Beerens and ProKarting, went smoothly. In ProKarting’s case, it has already led to another project: we recently designed a similar structure for a karting circuit in Zürich. At Rose’s Natural Homes, we are known for our ability to deliver technically challenging projects and provide practical solutions tailored to each project. We are proud of that.”    

Een zakelijke vraag aan Rose’s Natural Homes? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyRose’s Natural Homes
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.