Construction projects

Creative design as a unique calling card

De groene kleur van de golvende keramische gevel verwijst naar de bedrijfskleuren en bij uitbreiding naar de duurzame ambities van de onderneming.
De groene kleur van de golvende keramische gevel verwijst naar de bedrijfskleuren en bij uitbreiding naar de duurzame ambities van de onderneming.

Wyckaert is a construction company that likes to stand out from the crowd. This is reflected in the company’s new head office and warehouse complex.

The atypical green cladding makes a striking first impression. But the buildings are more than just visually impressive. In terms of sustainability and comfort, Wyckaert’s new base is also a shining example of progressive, creative thinking. 

With more than 125 years behind it, Wyckaert is more dynamic than ever. Its extensive expertise is matched by a progressive, forward-looking vision centred on customer satisfaction, innovation and sustainability. “We’re passionate about building, and you can see that in our approach,” says managing director Johan Franceus. “As a family business, we put our employees first. This results in project teams who approach their work with drive and enthusiasm. They work closely with clients, aren’t afraid of a challenge, are given the freedom to think creatively and strive for perfection every day. It is this passion that has enabled Wyckaert to keep growing, to the point where our existing head office had become too small.”

The ground floor is designed as a ‘plinth’, with the offices stacked above it.

Making the most of its visibility

For Wyckaert, there was no question that the new head office had to be built on the existing site. “Its location at the junction of the E17 and E40 in Ghent is invaluable,” says Johan Franceus. “Our company is not only easy to reach. Its strategic location also offers enormous visibility. To make the most of this asset, we chose a new position on the motorway side of the site. This meant demolishing the existing warehouses, so we also had to invest in a new warehouse. The architect seized this opportunity to turn our base into a real eye-catcher.”

Dancing in the sunlight

The warehouse and office building were not designed as separate entities, but brought together beneath a single enveloping facade. “It serves as a showcase, thanks in part to the choice of a rippling green ceramic facade,” says Matthias Ingels, project manager at Wyckaert. “This creates a striking visual effect that changes according to how much sunlight falls on the waves. The architects came up with an inspired solution, as it is the perfect visual expression of Wyckaert’s versatility. The green colour references the company’s corporate colours and, by extension, our commitment to sustainability. The extensive glazing and understated finish, meanwhile, translate our transparent, flat organisational structure into architectural form.”

Visual coherence

From the motorway, the new development appears to be one large building. In reality, however, the rippling facade conceals two separate entities, divided by a courtyard. “A lovely feature for our employees,” says the CEO. “Despite the busy surroundings, they can now enjoy lunch or hold meetings there in peace and privacy.” With a usable floor area of 2,700 m², the new office complex is almost twice the size of the former base. The ground floor is designed as a ‘plinth’, with the offices stacked above it across four identical floors. The ground floor houses the reception area, meeting rooms and canteen, which opens onto the courtyard. “There is also a gym in the basement,” says Matthias Ingels. “It is a good example of Wyckaert’s commitment to keeping its staff fit and healthy.” The large canopies provide solar shading and add an attractive accent. They are also clad in green ceramic and give the office tower extra volume. The 4,300 m² warehouse is finished in the same way, creating visual coherence.    

With a usable floor area of 2,700 m², the new office complex is almost twice the size of the former base.

A model of sustainability

Both the office complex and the warehouse are highly energy-efficient. Automatically controlled LED lighting also helps reduce energy use, while both buildings are heated and cooled using a BEO field. In addition, almost the entire roof area is covered with solar panels. “This makes us virtually independent of third parties for our energy supply,” says Matthias Ingels. “Combined with very good insulation, this gives us an E-level below 30, which is a good result for an office. Two green roofs covering more than 4,700 m² also provide the necessary rainwater retention. Mobility was designed with the future in mind too, with charging points for electric cars and bicycles.”

Attention to detail defines Wyckaert’s new headquarters.

Exploring new techniques further

It was only logical that Wyckaert should deliver the project itself. “It was a great opportunity to further refine our expertise in BIM and lean construction, while also shortening the construction period,” says Matthias Ingels. “Using BIM allowed us to model the project in meticulous detail and check for clashes, so we encountered no surprises on site. Lean, in turn, enabled us to work very efficiently. At one point, we were installing precast concrete elements in one section, closing the roof in another and carrying out the earthworks for the floor slab in a third. Both methods offer exciting prospects for helping Wyckaert continue to grow into a leading, competitive construction company.”    

Project partners speak

Stone, ceramic tiles

Natural stone or ceramic tiles? It was one of the difficult decisions Wyckaert faced when building its
new head office. “The client wanted the look of natural stone with the practicality of ceramic tiles,” says Kristof
T’Sjoen, sales manager at Stone. “At first glance, an impossible request, but we were able to offer a good compromise. Stone’s own ‘Altra Pietra’ brand, inspired by a carefully curated selection of natural stones, combines the best of both worlds. These tiles have the same refined appearance as natural stone, while offering all the technical characteristics of high-end ceramic tiles. A test area during construction of the new office convinced both the client and the architect. They chose ‘Altra Pietra Duomo Perla’ in the 90×60 format, installed both inside the offices and around the building. Given the extensive glazing, it was essential for the joints to continue from indoors to outdoors, resulting in a particularly attractive finish.”

TECHNICAL SPECIFICATIONS

Client Patrimbeheer (Ghent)

Architect Architecten Achtergael (Ghent)

Main contractor(s) Wyckaert (Ghent)

Question about this story? Ask your question

Who worked on it

Hoofdkantoor Wyckaert Gent in Gent

  1. clientPatrimbeheer
  2. architectArchitecten Achtergael
  3. main contractorWyckaert
  4. ceramic tilesStone

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHoofdkantoor Wyckaert Gent
  • SubjectConstruction projects
  • CompanyPatrimbeheer
  • CompanyArchitecten Achtergael
  • CompanyWyckaert
  • CompanyStone
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.