With 3.16 million square metres of industrial and logistics property, 111 logistics buildings and 23 hectares of land, Prologis is a household name in the Benelux. Having previously had two buildings constructed at Tongeren-Oost business park, this leading property provider is now adding a third logistics warehouse with office space on the intervening plot, to be built to the BREEAM Very Good standard. This is right up ASK Romein’s street, and the company took the initiative to make extensive use of 3D modelling. The results speak for themselves: the shell was completed a month ahead of schedule. 

Prologis and ASK Romein have a long history of working together. The renowned steel and industrial construction company has completed numerous projects for Prologis in the Netherlands, and currently has two projects under way in Belgium. One of these is in Tongeren, where ASK Romein is building a turnkey distribution centre with sixteen loading docks and office space, providing a gross floor area of approximately 16,686 square metres. Of this, approximately 15,940 square metres is allocated to the warehouse, 1,723 square metres to a mezzanine, 588 square metres to the separate office block and 452 square metres to a corridor connecting the new building to the adjacent one. “Both buildings will be leased by Rajapack. The corridor will serve as a connecting passage for conveyors,” says Niels Vorselaars, project manager at ASK Romein. “For us, this is a full turnkey project, including fit-out, building services and external works. Work began on 19 April. The shell has recently been made wind- and watertight, and the 170 mm thick superflat concrete floor has been poured.”

The new distribution centre has a gross floor area of approximately 16,686 square metres.

No ordinary project

The specific characteristics of the site have made construction of the new complex quite a challenge, says Niels Vorselaars. “The start of work was initially delayed by two months for an archaeological survey, which uncovered several valuable finds. Only then could we prepare the site for construction. In addition, space for logistics on site is very limited, partly because excavated soil is stockpiled along the side of the plot and preparations for the external works have to be carried out. The site also has an irregular gradient, so during the shell construction phase we had to negotiate significant changes in level. The new warehouse had to have the same floor level as Rajapack’s existing building, while the ground slopes steeply towards the rear. We therefore had to use retaining plinths to accommodate a 1.5-metre difference in level between inside and outside. A few metres further on, retaining walls hold back the soil on the neighbouring plot. Finally, the building incorporates some distinctive architectural details, a hallmark of Prologis: a strip of glazing above the doors and sections of the façade in different colours, white and anthracite in this case. This is certainly no ordinary project!”

The building design incorporates some distinctive architectural details, making this no ordinary project!

Ahead of schedule

Despite all these unusual challenges, ASK Romein is right on schedule. In fact, the wind- and watertight shell was completed a month ahead of plan. “This is partly thanks to the fact that we modelled the building in great detail in 3D beforehand, right down to the smallest anchoring components, all building services and the complete external works,” explains Niels Vorselaars. “The client had not required this level of detail, so we took the initiative ourselves. In a sense, we treated this project as a pilot for 3D modelling, with the aim of minimising the risk of problems and errors during construction. We adapted our entire way of working accordingly. The final evaluation is still to come, but it is already clear that we are reaping the benefits. We can agree things more effectively in advance, which clearly results in fewer defects and lower additional costs. Work on site is also much more efficient, as we can give our tradespeople specific instructions based on the 3D model. A clear image is worth a thousand words, especially when it comes to complex construction details, such as structural connections and curtain wall junctions, or building services, such as the layout of the sprinkler system, which is subject to strict requirements and must be coordinated with other services and obstacles. Of course, this takes a great deal of coordination and preparation, but it really does save time over the course of the project. The same goes for BREEAM Very Good certification: it brings a lot of additional administration, but also enhances the quality and value of the building. It has been an intensive but very useful and instructive process,” concludes Niels Vorselaars.    

Question about this story? Ask your question

Who worked on it

Distributiecentrum Prologis Tongeren in Tongeren

  1. clientPrologis
  2. architectHVC Architecten
  3. main contractorASK Romein

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDistributiecentrum Prologis Tongeren
  • SubjectConstruction projects
  • CompanyPrologis
  • CompanyHVC Architecten
  • CompanyASK Romein
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.