Construction projects

Elegant curtain walls add distinction

Geperforeerde verticale stroken accentueren de verticaliteit van het gebouw.
Geperforeerde verticale stroken accentueren de verticaliteit van het gebouw.

The Monteco building owes much of its fresh appearance to its stylish, transparent look. Specialist J. Hermans & Co framed the compact corner volume with three different curtain walls, which together are greater than the sum of their parts. “We are known for working everything out down to the last detail, including complex detailing,” says project manager Sonja Kiesekoms. “So challenging projects such as Monteco do not faze us in the slightest, even though combining curtain walls with timber-frame construction was a first for us.”

J. Hermans & Co was responsible for the external joinery on this prestigious project. “As well as a number of windows and doors, this mainly involved the curtain walls, our core business,” explains Sonja Kiesekoms. “We essentially installed three curtain walls one above the other: the first at the corner on levels 0 and 1, the projecting main façade, which runs from level 2 to level 6, and finally the curtain wall on the recessed seventh and eighth floors. This creates an intriguing sense of depth. The curtain walls use Reynaers Aluminium’s CW50 system and cover a combined area of 1150 m². For the windows and doors, we used Reynaers’ Masterline 8 profiles.”

The curtain walls bring abundant natural light into the offices behind them.

A welcome first

There was no shortage of technical and aesthetic challenges. For example, numerous glass-to-glass junctions were used at the corner, while the unglazed sections of the façade were also finished to perfection. “At floor level, we installed double-skinned white panels, complemented by deep cover caps and perforated vertical strips that create an apparently random rhythm. The perforations also feature in the façade cassettes on either side of the curtain walls, installed by Limeparts-Drooghmans,” says Sonja Kiesekoms. “It was also our first time working with a timber shell. It was a welcome experience, as this proved to have several advantages. Since the installation was carried out using wood screws, it was very quick and the site was extremely clean (in other words, no concrete work or pre-drilling was required). However, we did have to allow for the timber settling. It takes a long time to dry, so the building can still sink by a few millimetres. We had to factor this into our calculations and working methods. Despite this, everything went very smoothly and we are very pleased with the result. Our work always has a decisive influence on a building’s appearance, but in Monteco’s case we can even call it an architectural feature. Mission accomplished!”   

Have a business enquiry for Reynaers Aluminium? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyReynaers Aluminium
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.