Elliptical sister towers enrich the streetscape and Brussels skyline

In Brussels’ Northern Quarter, where the TBR Tower once stood and served for many years as Belgacom’s headquarters, two elliptical towers capture the imagination and offer their users a standard of workplace comfort rarely found in the capital. They are more sisters than twins, as the towers are connected only by a canopy shaped like a Möbius strip. Hence the name of this exceptional project …

Flashback to 2015, nine days before the deadline for the design competition launched by insurer Allianz. Client Immobel contacted assar architects, which was celebrating its thirtieth anniversary at the time, and asked it to develop a design that could win over Allianz. Pierre-Maurice Wéry, architect and partner at assar, remembers it well: “Christophe Van Poppel, a partner at assar, had previously designed elliptical projects and buildings with curved lines. This allowed us to create two objects: one volume tailored entirely to the Allianz brief, and
another for the rest of the site, together providing around 62,000 m² of usable space. In the foreground is Allianz Belgium’s headquarters, a smaller tower with a striking profile (ground floor + 19 storeys). Behind it stands its big sister (ground floor + 23 storeys), which has recently been bought by the Régie des Bâtiments.”
“We also advised Immobel to buy an unused plot of land between the site and the existing social housing, so that cars could be kept out for good,” says Wéry. “That allowed us to make the ground floors open and permeable, surrounded by public spaces and a garden, giving a relatively small plot a strong identity.” These two elliptical volumes soon proved innovative, both in appearance and in their spatial layout, ultimately convincing Allianz. The tower designs were then refined down to the smallest detail.

Ingenious innovations
To meet the standards, the escape stairs were incorporated into the central core. It was the first time assar had built high-rise buildings without fire corridors dividing the floor plates in two. Such open, 360-degree floor plates were a first for Brussels. The vast majority of workstations are located close to the curtain walls, within 7 metres, and consequently benefit from maximum natural light.
The towers were given a kind of helmet, clad in horizontal grilles. This screens the office floors’ technical installations from view. The installations are housed in a covered external volume, topped by a metal canopy. Since these unenclosed spaces are not included in floor-area calculations under the regulations in force in Brussels, the designers were able to maximise the building’s saleable area. The same approach was taken at the base of the towers, notably by removing the above-ground parking areas.

BREEAM Excellent
Daylight for (almost) everyone, triple glazing, demountable climate ceilings, rainwater recovery, a rear garden that promotes biodiversity, visual comfort, cycle parking with changing rooms, the use of certified timber, smart waste management on site and, last but not least, the prime location close to Brussels North station: all these aspects helped secure a BREEAM Excellent certificate for these passive towers (EPB 2015).
“The radiant-heating climate ceiling system offers an optimum in energy performance and acoustics. Despite the shape of the building, the ceiling islands are rectangular, with no material wastage. The space between them allows us to benefit from the thermal mass of the concrete floor slab. They do not touch the façade and are simply left exposed, as are the concrete and the pipes. Allianz appreciated the industrial feel,” says Charlie Malou, the architect and partner responsible for the detailed design and site supervision. This restrained finish also sits well with the BREEAM philosophy. While some buildings try to impress with complex material treatments, the Möbius Towers are all about form, light and views. Everything else is superfluous.
You might think the elliptical shape of the towers would lead to significant material wastage, but nothing could be further from the truth. The architect quickly drew up a specific laying plan for the concrete hollow-core slabs to show that it was possible to use standard precast slabs instead of in-situ concrete, apart from a few intermediate bridging elements. As a
result, the towers could be built very quickly, at a rate of almost one structural floor per week. The core was constructed using climbing formwork, followed by the installation of the precast Ergon elements and, finally, the façades. Everything proceeded fully simultaneously, with a gap of a few storeys between the core and the outer envelope.

Living façades
The façades were designed differently according to their orientation. Given its importance to the project, an atypical tendering procedure was used for the façade, with a specific request for tenders for the façades. Assar proposed that Immobel approach three façade contractors directly and invite them to submit a ‘value for money’ tender offering considerable technical freedom, in close consultation with Philippe Gérard, architect and partner at assar and its leading façade expert. “The selected façade contractor, working as a subcontractor under a performance specification, convinced us,” says Pierre-Maurice Wéry. “By manufacturing the window units at 3.20 metres rather than 2.70 metres, with thinner spandrels, we avoided material waste and only needed to install sprinklers to comply with the fire regulations for high-rise buildings. As an experienced insurer, Allianz immediately saw the benefits. It was a textbook example of optimal coordination between the developer, end user, façade contractor and architect, all of whom stood to gain. We not only kept to budget, but also succeeded in enhancing the building compared with the approved planning application.”
A double skin on the south façade prevents overheating while also refining the tower’s volume. Grated walkways on each floor shield the building from the sun, as does the high reflectance of the external glazing. The latter also acts as a balustrade for the executive office terrace on the top floor. Air inlets are integrated into the double skin to create a stack effect and remove heat.” Assar also fitted the Allianz building with glossy, bluish glazing, making it a highly animated tower that reflects the colours of the sky as the day progresses. From the inside, the blue tint of the glazing subconsciously gives the impression of fine weather, even on grey days …
The base of the towers, comprising the ground floor and level +1, is clad in natural stone, creating an attractive connection with the surrounding public realm. The entrance halls are generously glazed on the boulevard side and actively engage with public life. Between these bases and the glass towers, at level +2, an aluminium canopy twists into the shape of a Möbius strip, giving the project its name.

A success from top to bottom
Compared with the old TBR Tower and its surroundings, swallowed up by a closed podium that stifled all forms of social interaction, the Möbius Towers are also a success in terms of their landscaping. Their distinctive shape and positioning made it possible to create new public spaces, including wider pavements and an inviting restaurant terrace. Above, the sister towers enrich the Brussels skyline with their elegant roofs, while respecting the authorities’ requirements.
Pierre-Maurice Wéry: “Möbius is the ultimate proof that our way of working, combining different complementary profiles, leads to projects with few weak points. Designers, software specialists, site managers, project managers and no fewer than four assar partners all contributed their specific expertise. That makes us very proud!”

A business enquiry for Assar Architecten? Get in touch
Wie aan Möbius 1 werkte
- bouwliften
EuroMentioned in Custom-built construction hoist meets the needs of prestigious new-build project - verzekeringsmaatschappijAllianzMentioned in Custom-built construction hoist meets the needs of prestigious new-build project
- main contractorInterbuildMentioned in Custom-built construction hoist meets the needs of prestigious new-build project
- ClientImmobelIn this story
- Main contractorBAM InterbuildIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMöbius 1
- SubjectConstruction projects
- CompanyAssar Architecten
- CompanyImmobel
- CompanyBAM Interbuild