Energy-neutral production hall for electric city buses

More and more city authorities believe that zero emissions should become the norm in the near future. It is therefore expected that three-quarters of all public transport buses will be electric by 2025. Against this backdrop, Dutch company VDL Bus & Coach opened a new factory in Roeselare earlier this year. It will be VDL’s Belgian centre for e-mobility.
The production process will be compact and geared towards building more electric buses than at present. Preparations will involve smart pre-assembly, shortening lead times and improving efficiency. By streamlining the production process, reducing the hours required per bus, VDL will be able to double the new factory’s maximum capacity to up to eight hundred buses.

Energy-neutral setting
Everything has been designed to build electric buses as efficiently as possible. Production will take place in an energy-neutral setting using ‘green’ technology. Measures include making greater use of natural light and reducing artificial lighting, which is healthier and safer for employees; reusing rainwater; using medium-weight concrete, which helps even out the heating and cooling cycle in summer; and installing green roofs on the offices, improving air quality and providing a cooling effect. A major undertaking for the construction team …

Flexibility and ingenuity
Preparatory work, including groundworks and excavation, began in late 2021. The production hall covers more than 21,000 square metres. A further 6,000 square metres was allocated to offices, communal areas, including the staff restaurant, the fully glazed showroom and the warehouses. Another 20,000 square metres was set aside for parking and landscaping.
Silke Manssens, project manager at Alheembouw: “Together with Valcke Prefab Beton, we secured this contract partly through a competition and partly through a traditional tender. We were responsible for the enclosed, wind- and watertight shell and the landscaping. In terms of scale, this was not an exceptional project for us. But, as is often the case today, we had to keep a close eye on the pressure from rising prices and short completion deadlines throughout the project. This once again called for considerable flexibility and ingenuity. We also encountered changes to the plans during construction from time to time, which brought its own challenges. For example, the production hall was initially designed with a flat floor, but several underground inspection pits and technical service crawl spaces were later incorporated into the project. However, because collaboration with the client, architects, construction coordinator, engineering consultancies and subcontractors remained constructive and respectful throughout, we were able to make all the necessary adjustments smoothly and still meet the target schedule.”

Tight schedule
Harold Hemelaere, site manager at Alheembouw: “The schedule for this project was very tight from day one. That is why we immediately brought in additional crews and a second crane, followed later by a third. This enabled us to complete everything a month ahead of schedule. Choosing a concrete roof with TT elements instead of steel decking also proved more cost-effective, creating a thermally inert building and particularly comfortable working conditions. As well as the above-ground works, including the parking area and outdoor spaces, we were also responsible for constructing the sprinkler water storage basement.”
Question about this story? Ask your question
Who worked on it
Productiehal VDL Roeselare in Roeselare
- clientVDL Vastgoed Belgium
- architectDEMO Architecten
- main contractorAlheembouw
- prefabbetonValcke Prefab Beton
Keep following this
Get an email when a new story is published. No account needed.
- ProjectProductiehal VDL Roeselare
- SubjectConstruction projects
- CompanyVDL Vastgoed Belgium
- CompanyDEMO Architecten
- CompanyAlheembouw
- CompanyValcke Prefab Beton