Construction projects

Food company invests in factory of the future

De eerder gesloten productie- en stockagevolumes contrasteren mooi met de kantoorzone, die zich boven de laadkades bevindt.
De eerder gesloten productie- en stockagevolumes contrasteren mooi met de kantoorzone, die zich boven de laadkades bevindt.

To keep pace with its rapid growth, DV Fresh invested no less than 17 million euros in a ‘factory of the future’. In addition to transforming the existing production hall, the project also included the construction of a brand-new facility where automation and digitalisation take centre stage. Naturally, this progressive character is also reflected in the architecture, which looks particularly contemporary thanks to its subtle interplay of lines and contrasting colours.

The new building includes an automated storage warehouse.
DV Fresh invested 17 million euros in its ‘factory of the future’.

In addition to cutting and packing fresh vegetables, DV Fresh also produces ready-to-eat meal salads for the retail and food service sectors in the Benelux, Germany and France. Since founding the company in 1998, managing directors Dirk and Hilde Verkinderen have focused on innovation and quality. They have developed innovative cutting techniques, creative recipes and customised packaging methods. This strategy has paid off, with the company experiencing rapid growth. The couple soon realised that an expansion would be needed sooner or later. When the adjoining Lafaut site came up for sale in 2016, Dirk and Hilde seized the opportunity. “This allowed us to expand our site to 34,000 m², opening up many more possibilities for the future,” they explain. “We knew that maximum automation was the way to stay ahead of the competition. So we came up with the idea of building an additional facility and developing the entire site into a ‘factory of the future’.”

A large dispatch area is another key feature of the new building.
Automation and digitalisation take centre stage in the new facility.

Stacked functions

The existing factory was converted into a production hall where the vegetables are washed, cut and dried. These semi-finished products pass through an intermediate cold store to the new facility, where they are further processed, packed and stored. The new building has a floor area of 10,000 m² and houses a packaging hall, an automated warehouse for products and empty crates, cold stores and a large dispatch area. “We opted for a solid, two-storey concrete structure,” the managing directors explain. “By stacking the different functions, we can make better use of the space, keep the zones completely separate and optimise our energy consumption. The site also looks much tidier, as storage for empty crates has been integrated into the building.”

The architect designed a concept in which smooth, light-grey concrete panels alternate with dark sandwich panels.

A cohesive architectural design

The relatively enclosed production and storage areas contrast beautifully with the office zone above the loading bays. “As well as additional offices, we created a spacious training room, a fully equipped test kitchen and a well-equipped
demonstration kitchen there,” say Dirk and Hilde Verkinderen. “This part of the new building is characterised by open façades with an intriguing interplay of lines. R-Architekten designed a concept in which smooth, light-grey concrete panels alternate with dark sandwich panels. Combined with natural timber joinery, this creates a restrained, timeless building that nevertheless conveys progressiveness, creativity and functionality. In short, the architecture perfectly reflects DV Fresh’s vision and what we stand for as a company. We are currently commissioning the new factory. We have been pleasantly surprised by the many benefits of the new layout and the associated workflow. It is already clear that this investment will enable us to respond perfectly to our growth trajectory, in which innovative products with added value and complexity play the leading role.”    

PROJECT DETAILS

Client
DV Fresh (Pittem)

Architect
R-Architekten (Oostende)

Main contractor(s)
Beaver Construct (Lendelede)

Question about this story? Ask your question

Who worked on it

Fabriek DV Fresh Pittem in Pittem

  1. ClientDV Fresh
  2. ArchitectR-Architekten
  3. Main contractorBeaver Construct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectFabriek DV Fresh Pittem
  • SubjectConstruction projects
  • CompanyDV Fresh
  • CompanyR-Architekten
  • CompanyBeaver Construct
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.