Construction projects

Forward-thinking office building with striking canopy for social enterprise

Text Wouter PolspoelImage UAU collectiv

Forward-thinking office building with striking canopy for social enterprise

Bewel, a social enterprise employing people who face barriers to the labour market, replaced its outdated headquarters in Diepenbeek with a new building that meets modern energy standards and offers employees all the comfort expected of a working environment today. The project was carried out under the DBME formula, or Design, Build, Maintain & Energy, by a consortium comprising design firm UAU collectiv, main contractor Artem and Van Roey Services, a partner in sustainable building and systems maintenance management. The new office building, distinguished above all by the large canopy that wraps around it, was designed for adaptability, allowing it to accommodate new uses in the future. 

UAU collectiv’s design was developed only after the architects had listened carefully to the specific wishes of Bewel’s employees. Conceived as a pavilion, it has four clusters spread across two levels and a central entrance hall that creates an inviting, intuitive flow through the building. The many glazed sections in the 7.5-metre-high façade, some of them opaque, maximise the connection with the lush green surroundings, helping to promote users’ wellbeing. The 8-metre-long steel canopy that wraps around the building adds architectural appeal, but also serves practical purposes, such as eliminating the need for window shading, which can detract from the building’s aesthetics and requires maintenance.

The entrance area has a polished concrete floor that flows seamlessly into the external concrete paving.

Timeless materials

The building has a concrete frame. Independent of this frame, the façade comprises glass and a number of white aluminium panels. The external joinery, canopy and supporting steel columns are finished in matt white to emphasise the building’s lightness. The external paving, also included in the project, was laid in exposed aggregate concrete in a soft colour. 

This balanced, timeless palette of materials is carried through into the interior. The entrance area has a polished concrete floor that flows seamlessly into the external concrete paving. The office floors are finished with light-coloured carpet. The fixed furniture is made of HPL with a dark finish, while the upholstered furniture comes in a natural shade of green. The same colour also features in the tiles on the walls and floors of the sanitary facilities.

Sustainability comes first

The new Bewel headquarters, completed in June 2023 after around 18 months of work, is a model of sustainability in several respects. The architects used the Flemish Government’s GRO sustainability assessment tool to guide their design.

The building was designed to be flexible, so it can be adapted to changing user needs with minimal intervention. In principle, this means it will not need to be demolished before the end of its technical service life.

A circular approach was also adopted during construction, with the use of as many reclaimed materials as possible.

Energy efficiency was another priority. For example, solar-control glazing with high thermal insulation performance was chosen to reduce energy consumption for heating and cooling, while also ensuring acoustic performance and limiting reliance on mechanical heating and cooling systems. The generous glazing also reduces the need for artificial lighting during the day. Heating and cooling are provided geothermally by a BEO field, without the use of fossil fuels. Together, these measures make the building nearly zero-energy.

The steel canopy adds architectural appeal to the building, but also serves practical purposes, such as eliminating the need for window shading.

Finally, the focus was not solely on the initial construction costs. The project also aimed to reduce the total cost of ownership, or TCO, which includes long-term costs such as energy and maintenance. This is closely linked to the specific form of the contract, a DBME, or Design, Build, Maintain & Energy. By requiring a performance guarantee for the building’s energy consumption over 20 years at the tender stage, together with a guarantee of good indoor environmental quality in the form of a comfort-as-a-service contract, Bewel encouraged the consortium to incorporate sustainable technologies into the design. These often involve higher capital costs, but pay for themselves through lower energy consumption. Van Roey Services will also be responsible for maintaining the systems for two decades, helping to extend their service life. 

The new headquarters was built next to the old one, which made way for a new car park and access paths. This autumn, Bewel employees will plant the site themselves, following a plan by Natuurpunt.    

Een zakelijke vraag aan Pami? Get in touch

Who worked on it

  1. ClientBewel (Diepenbeek)
  2. ArchitectUAU collectiv (Hasselt)
  3. Main contractor(s)Artem (Dessel)
  4. Also involvedPami

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
  • CompanyPami
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.