Fosbury & Sons | Watermael-Boitsfort

Taking coworking to new heights
Following the opening of its first 3,000 m² location in architect Léon Stynen’s former Electrabel building in Antwerp, beside Koning Albertpark, Fosbury & Sons recently opened new offices in the former headquarters of concrete company CBR in Watermael-Boitsfort. IBS Bouw was appointed for both full renovations.

“We did not want to recreate a vintage feel, but to preserve the authentic features as much as possible while introducing our own contemporary touches,” says architect Michiel Mertens. (JV)
Coworking offices have become an established feature in Flanders’ major cities. They offer start-ups and mobile entrepreneurs not only a desk and a range of office services, but also pleasant, inspiring workspaces and high-quality catering. As a home-grown trendsetter, Fosbury & Sons quickly made a splash in the growing coworking sector. Alongside breakfast and lunch, it offers additional services such as talks and networking events.
Respecting and updating heritage
“We see architectural heritage being tampered with far too often,” say Stijn Geeraets and Maarten Van Gool, the founders of Fosbury & Sons. “We felt it was our duty to incorporate its strengths into a contemporary concept. Architects Anaïs Torfs and Michiel Mertens of studio Going East understand perfectly how to combine this with our requirements for functionality and quality of life.” Geeraets and Van Gool are firmly committed to an innovative approach to work, moving away from the one-size-fits-all doctrine. “Today’s and tomorrow’s millennial generation expects a contemporary working environment to meet its needs. The digital age gives us enormous freedom of movement and autonomy, but at the same time we need a stable habitat. That is inherent to being human. We reflect this in the architecture, among other things, aiming to create an inspiring, motivating experience for our coworkers.”

Brodzki
The building in Watermael-Boitsfort is an architectural landmark by Constantin Brodzki, now 93. He spent seven years perfecting the concrete façade of his CBR building.

Restored panelling, authentic exposed concrete and end-grain wood flooring are combined with design features and a fantastic view over the Sonian Forest. (RD)
Completed in 1970, it was the first precast-concrete building with flowing forms and was included in the MoMA exhibition ‘Transformation in Modern Architecture’. Brodzki resisted the trend of using concrete primarily for clean, rectilinear structures, striving instead to make full use of the material’s formal possibilities.
“Even today, we are still in awe of his craftsmanship and ingenious solutions, which were far ahead of their time,” says Michiel Mertens. “We did not want to recreate a vintage feel, but to preserve the authentic features as much as possible while introducing our own contemporary touches, which sometimes complement them and sometimes create a slight clash.” Like Brodzki, Going East delivered a complete concept, from the shell through to the restoration of the panelling, desk lamps and furniture. “Unlike the original building, we wanted each floor to have its own accents, atmosphere and focal points.”

A new mezzanine level doubles the available floor area, but had to be built entirely from scratch and anchored into the existing building. (RD)
Deliberate nonchalance
“Its casually styled, semi-industrial appearance may be misleading, but the required standard of finish was indeed very high,” says Pieter Dereere, site manager at contractor IBS Bouw. “Coupled with the very tight construction schedule, it was a real challenge to plan our own tradespeople and subcontractors efficiently. Fortunately, we are used to that extreme flexibility and working to a shifting schedule, as IBS also frequently undertakes industrial projects, where timing is always critical. The opening party was therefore both a relief and a release for us.”

The architect, client and contractor worked closely together to perfect the concept, both technically and aesthetically. (RD)
“The technical challenges should not be underestimated either,” adds project manager Stijn Van de Zande (IBS Bouw). “For example, we had to reinforce the entire concrete frame of the Electrabel tower, built in 1958, from the foundations and underground car parks up to ground level. Handling those extremely heavy, multi-metre-long steel elements required millimetre precision. Fortunately, the construction team worked together perfectly. It is very rewarding to see that Fosbury & Sons is often used as a filming location for television programmes such as ‘Over eten’ with Kobe Ilsen and Danira Boukhriss.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects