Construction projects

Gare Maritime Brussels | Former railway station transformed into an authentic experience venue

Gare Maritime Brussels | Former railway station transformed into an authentic experience venue

The area around the Port of Brussels has been undergoing a remarkable transformation for several years. The unattractive former industrial district is gradually becoming a vibrant urban neighbourhood. The development of Gare Maritime is making a significant contribution to this.

Commissioned by Extensa, MBG is transforming the former goods station at the Tour & Taxis site in Brussels into a covered urban space for offices, events, promenades, food and drink, and shops. Dutch architectural firm Neutelings-Riedijk, known for projects including the Museum aan de Stroom in Antwerp, drew up the plans for the new development, preserving as many of the original features of the impressive, 75-metre-long station halls as possible. These include the cast-iron columns with their Art Nouveau ornamentation. 

Below ground are two small basement rooms and two long storage tanks with a capacity of 1,400 m³ of rainwater.

CLT 

The station’s 40,000 m² footprint is being supplemented by 35,000 m² of usable floor space through the construction of internal floors, which will house offices. Shops, showrooms and food and drink outlets will be located on the ground floor. These internal structures are being built entirely using timber frame construction, with CLT (cross-laminated timber) elements. Only the pile foundations, foundation slabs and basements of two smaller structures are made of concrete. The timber structures are not freestanding in the hall, but connect fully to the existing façades and roofs. “As the steel structure can move in response to wind and temperature, we had to allow for sufficient movement at every connection and seal them flexibly for acoustic and thermal reasons,” says MBG project director Jan Mulkens.

Additional rooflights and smoke vents in the roof.

Ramblas 

No permanent structures are being built in the three central roof sections. Green areas, among other features, will run the full length of these halls. The side halls will have six cross streets, giving the whole space the feel of Spanish ramblas. “We started renovating the old railway halls in July 2016 and building the timber structures inside in June 2018,” says Mulkens. “We found that the existing steel structure, timber roof structure and timber-slat ceiling were still in good condition. We are replacing the zinc roof covering with sandwich panels and applying a fire-retardant coating to some of the steel.”
When the old zinc covering was removed and the new sandwich panels installed, the original roof structure, with its timber boarding and rafters, and the battens beneath it were exposed. “Some of the timber, particularly around the gutters, had rotted and had to be replaced. Most of the roof structure and battens remained intact. Inevitably, damp ingress and old dust had left large sections of the battens with a black ‘coating’. We managed to remove most of it by carefully abrasive blasting. The battens are now visible in their original condition.

Sun

Additional rooflights and smoke vents have been installed to bring in more daylight and improve fire safety. “This required extra attention to the watertight detailing where the vents meet the sandwich panels,” explains Mulkens. Solar cells have been integrated into the glazing of the hall’s south-west-facing end wall. “To feed the electricity generated by these cells into the grid, we had to adapt the detailing, including finding a way to conceal the cables.”

Leasing

Extensa, the developer and owner of the entire 30-hectare site, has no plans to sell Gare Maritime immediately. “We sold the new office buildings we had built there, such as the Herman Teirlinckgebouw, whose tenant is the Flemish Government, and the building for Leefmilieu Brussel. But the renovated historic buildings, such as Gare Maritime, will remain within the group for now. By leasing them, we can shape the overall direction of their use ourselves,” says COO Peter De Durpel.

The existing platforms have been removed and the ground is being regraded to take account of the difference in level between the two long façades.

 

Experience at the heart of the concept

The plans focus on events, food and drink. Extensa does not want to create yet another shopping centre dominated by familiar fashion chains. “Our concept puts the experience at the heart of it. The spaces will be geared mainly towards trying, demonstrating and tasting products. 60% of the office space has already been leased. Bosch-Siemens-Hausgeräte, for example, will not only have a presence in the public area, but will also establish its Belgian headquarters on the upper floor.”    

Question about this story? Ask your question

Wie aan Gare Maritime werkte

  1. ClientExtensa Group nvMentioned in Optimal fire safety at Gare Maritime
  2. architect nieuwbouw binnenvolumesNeutelings-Riedijk ArchitectenMentioned in Optimal fire safety at Gare Maritime
  3. architect renovatie buitenschilJan de Moffarts ArchitectenMentioned in Optimal fire safety at Gare Maritime
  4. architectBureau BouwtechniekMentioned in Optimal fire safety at Gare Maritime
  5. main contractorCFE Bouw Vlaanderen: MBGMentioned in Optimal fire safety at Gare Maritime
  6. RWA-systeemColt InternationalMentioned in Optimal fire safety at Gare Maritime
  7. property developerExtensaMentioned in Tour & Taxis/Gare Maritime | Brussels
  8. architectNeutelings-RiedijkIn this story
  9. schrijnwerkWeboMentioned in Gare Maritime Brussels | Complex joinery with an eye for detail
  10. architectNeutelings Riedijk ArchitectsMentioned in Gare Maritime Brussels | Complex joinery with an eye for detail
  11. Main contractorMBGMentioned in Gare Maritime, Brussels | A covered city built with 11,000 cubic metres of timber
  12. engineering consultancyNey & PartnersMentioned in Gare Maritime, Brussels | A covered city built with 11,000 cubic metres of timber
  13. steel curtain wallsLootens LineMentioned in Gare Maritime, Brussels | A covered city built with 11,000 cubic metres of timber
  14. complete fit-outTecnoSpaceMentioned in Unique office fit-out at Gare Maritime
  15. interior designCAPTIF Office ArchitectsMentioned in Unique office fit-out at Gare Maritime

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGare Maritime
  • SubjectConstruction projects
  • CompanyNeutelings-Riedijk
  • CompanySiemens
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.