Logistics provider H.Essers continues to develop. The Limburg-based company is growing by more than 10% a year, is making a name for itself elsewhere in Europe and is once again preparing for a substantial increase in its workforce. To accommodate this expansion, while awaiting a new headquarters, it has already had a parking tower built at its ‘mother site’ in Genk. The project carries a green message: the tower stands out for its sustainable design. 

Acquisitions, stakes in other companies and expansion of activities: things are going well for H.Essers. The ‘logistics giant’ also wants to strengthen its presence in Limburg in the years ahead, and so had to find ways to accommodate the steady growth in its activities and workforce. The first project to get under way was the construction of a new parking tower by ASK Romein. The building occupies a large part of the former outdoor car park. “Sustainability was the guiding principle, in several respects,” says H.Essers. “We opted for a tower building to minimise its spatial footprint, and had it fitted with a green roof and green façade. The entire structure is also ventilated naturally, without the use of electrical systems.” 

De centrale locatie was een bron van inspiratie en bracht tegelijk enkele uitdagingen met zich mee.

The entire structure is ventilated naturally, without the use of electrical systems.

A mix of steel and concrete

The newly completed parking tower has five floors and a total floor area of 14,500 m². The building provides space for 502 cars as well as a ground-floor bicycle parking facility. “The entire structure rests on pile foundations,” says Jurgen Wolfs, construction director at main contractor ASK Romein. “Apart from the two vertical concrete stair cores, the structure is built entirely from S235 and S355 steel, coated with a fire-resistant coating. The floor slabs, with a total area of 12,500 m², are 40 centimetre-thick prestressed hollow-core slabs with a cast in-situ structural topping. The ground floor features a 2,500 m² cast concrete slab on grade. It has turned out to be an attractive building. The box columns, which do not taper towards the top, are particularly pleasing to look at. Only the wall thickness has been adjusted. This gives the building a clean, symmetrical appearance. The railings appear to float because they are anchored to impact beams suspended from the structure above.” 

Residentie Mon Bijou in De Panne trekt de aandacht met haar ronde vormen en uitkragende terrassen.

The structure of the new parking building is made entirely from S235 and S355 steel, coated with a fire-resistant coating. The floors consist of 40 centimetre-thick prestressed hollow-core slabs.

Tight schedule, carefully planned phasing

H.Essers set ASK Romein a very tight deadline for completing the work. Construction began in January, and the new parking tower was already operational by July. “We divided the project into three phases: first we built one half of the building, then the other half, and finally the access ramps, covering a total of 3,750 m²,” explains Jurgen Wolfs. “As we erected the steel structure, we installed the prestressed hollow-core slabs straight away. During construction, we anchored the supporting structure to the stair core to ensure stability, using temporary wind bracing and other auxiliary components that were removed later. Once the entire steel structure had been assembled, we poured the structural toppings on the floor slabs, followed by the impact beams and railings. The schedule and the stability challenge were not the only important factors: weather conditions also played a major role. In the early stages, we often had to contend with rain and wind, while towards the end we faced extremely high temperatures. None of this prevented us from delivering the new parking tower in excellent condition and within the deadline!”   

Question about this story? Ask your question

Wie aan Parkeertoren H.Essers werkte

  1. main contractorASK RomeinIn this story
  2. binnenafwerking en maatmeubilairJansenMentioned in A new landmark in a post-industrial mining landscape
  3. clientH.EssersMentioned in A new landmark in a post-industrial mining landscape
  4. architectILB ArchitectenMentioned in A new landmark in a post-industrial mining landscape
  5. masterplanCREOSUMMentioned in A new landmark in a post-industrial mining landscape
  6. stabiliteitsbureauMoutonMentioned in A new landmark in a post-industrial mining landscape
  7. main contractorSTRABAGMentioned in A new landmark in a post-industrial mining landscape
  8. buitenschrijnwerk en automatische schuifdeurenGroup CeyssensMentioned in A new landmark in a post-industrial mining landscape
  9. aanleg van het groentuinspecialisten van Gert KwantenMentioned in Attractive landscaping enhances sustainable business site

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectParkeertoren H.Essers
  • SubjectConstruction projects
  • CompanyASK Romein
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.