Building Loods 23 was no easy feat. Quite literally, as a brand-new underground car park was built beneath the existing complex. Technically, it was an almost impossible task, yet it was successfully completed thanks to an ingenious foundation solution based on VHP-LR and VHP piles.
“Few problems are too big to solve, even in the construction industry,” says Dirk Valvekens of the client, Locus Development. This message certainly did not fall on deaf ears at engineering consultancy LIME, which developed the concept for the car park beneath Loods 23. “I have known the site since the early 1990s, when I was studying at Ghent University,” says managing director Francis Delacroix. “It has fascinated me for a long time, and I was already fascinated by imposing steel structures back then. I now live in Loods 22 and look out over Loods 23. I have always wondered how they would tackle this project. Keeping an existing building standing, excavating its foundations and putting a car park underneath it is no easy task. I was honoured to be asked to work on the problem, but at the same time it was a huge challenge.”

Jonas Landuyt: “We received valuable support from subcontractor Smet Group, which devised a solution involving 99 VHP-LR piles (replacing the existing masonry pad foundations) and sixteen VHP piles.”
Column and foundation in one
“The basic principle behind the concept was that a support structure was needed for the superstructure. Temporarily propping up a building costs time and materials, so fortunately the support structure could also serve as the permanent structure, taking into account the position of the columns needed to support the superstructure and the space required for the car park. This also saved costs, as we could proceed straight to the permanent works,” explains Francis Delacroix. “The original idea was to build separate pads next to the old masonry foundations for the new permanent columns,” continues Jonas Landuyt, project manager at contractor Vandenbussche. “The difficulty was that we would have had to excavate in very carefully planned stages, as we could not expose all the existing foundations along one gridline at once due to the risk of buckling. That was when we came up with the idea of driving steel piles into the ground next to the existing foundations, where they could serve as both columns and foundations. We received valuable support from subcontractor Smet Group, which devised an ideal solution involving 99 VHP-LR piles (replacing the existing masonry pad foundations) and sixteen VHP piles. There are now fewer columns in the basement than there used to be masonry foundations!”
Question about this story? Ask your question
Wie aan Loods 23 werkte
- clientLocus DevelopmentsMentioned in Ghent, Loods 23 | 19th-century cotton warehouse transformed into stylish lofts
- architectCompagnie-O ArchitectsMentioned in Ghent, Loods 23 | 19th-century cotton warehouse transformed into stylish lofts
- contractorVandenbusscheMentioned in Ghent, Loods 23 | 19th-century cotton warehouse transformed into stylish lofts
- clientLocus DevelopmentIn this story
- engineering consultancyLIMEIn this story
- subcontractorSmet GroupIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLoods 23
- SubjectConstruction projects
- CompanyLocus Development
- CompanyLIME
- CompanySmet Group