Construction projects

High-end ceramic finishes for renovated office tower

Text Tim JanssensImage Vivian Hertz, RG Tegel

De Louizatoren wordt met het grootst mogelijke respect voor de originele architectuur opgewaardeerd naar de hedendaagse standaarden op het vlak van comfort en energie-efficiëntie. (Beeld: Vivian Hertz)
De Louizatoren wordt met het grootst mogelijke respect voor de originele architectuur opgewaardeerd naar de hedendaagse standaarden op het vlak van comfort en energie-efficiëntie. (Beeld: Vivian Hertz)

There is always plenty of activity on Avenue Louise in central Brussels, but these days there is even more than usual. This is all down to the renovation of the Louizatoren, also known as the Generalitoren, one of the first buildings in the Belgian capital to exceed 80 metres in height. This distinctive landmark is being transformed into ‘The Louise’, a forward-looking office building aiming for BREEAM Excellent certification. Its status as a prestigious project is also reflected in the high-quality interior finishes, including ceramic tiles and washbasin tops from Italian luxury brand Ariostea. 

The Brussels-based architectural practice A2RC describes the creation of The Louise as ‘a significant achievement in Belgian architectural history’. The project is being carried out for German real estate fund manager PATRIZIA, with main contractor CIT Blaton overseeing the work. These are no idle words: renovating a 90-metre-high building dating from the 1960s is no everyday undertaking. The iconic tower has 24 floors and is being upgraded to contemporary standards of comfort and energy efficiency with the utmost respect for its original architecture, with BREEAM Excellent certification as the ultimate goal. 

Ariostea ceramic tiles can be found, among other places, in the building’s entrance hall.

A thorough makeover

Renovation work began at the end of January 2021 and is now approaching the final stretch. The façades and building services were tackled first: improved insulation, high-quality double glazing, a new ventilation system, efficient ceiling cooling … The interior is now being refurbished and is also getting a thorough makeover. The 3,286 m² ground floor will include a shared reception area, a library, food and drink venues and lounges, as well as a passageway to the adjoining Hotel Wielemans, a protected Art Deco building being transformed into a 685 m² business club. 

While the latter is exclusively accessible to users of The Louise, the first floor of the renovated office complex will be more public in character. It will house coworking spaces, meeting facilities and open work and relaxation areas for the general public, covering 1,594 m² in total, and will also connect to a spacious 801 m² terrace. 

Above the public podium are five ‘podium floors’ ranging from 1,372 to 1,751 m², and 17 tower floors of 1,048 m², offering panoramic views over central Brussels. These are intended for A+ workspaces for a range of companies, which can even rent a duplex floor if they wish and make use of a variety of services and shared facilities, including a business app, concierge, bicycle maintenance, shower and changing facilities, shared mobility and electric vehicle charging points … In total, the building will provide around 30,000 m² of column-free office space. Completion is scheduled for the first half of 2024. 

Ceramic tiles from the Fragmenta, Teknostone and Astra collections were selected.

A major challenge

The Louise offers the best of the best not only in terms of comfort, energy efficiency, service and hospitality. The bar is also set high for aesthetics and quality of finish. It is no coincidence, then, that the architects opted for high-end ceramic materials from Ariostea. RG Tegel represents the Italian brand in Belgium and consequently served as a crucial link between the factory and main contractor CIT Blaton, from tile selection through to overseeing the work. “Ceramic tiles from the Fragmenta, Teknostone and Astra collections were selected. They have been used in the sanitary facilities on the 17 tower floors, where ceramic washbasin tops measuring 1.7 to 4 metres in length have also been installed. They can also be found in the building’s entrance hall, on the terraces and in the lifts,” says RG Tegel. 

“One of the main challenges of this project was producing the washbasin tops, 90 in total, as these were large-format pieces measuring 1 x 3 metres. Getting these heavy units upstairs and into position was no easy task,” says RG Tegel. “We were also asked to supply triangular tile elements, which were not standard and therefore had to be cut to size. It is also unusual for Ariostea’s high-quality products to be used on such a scale. We are talking about thousands of square metres of tiling, which does not happen very often. The Louise is therefore a true prestige project for us too. We are delighted to be able to add it to our list of references soon!”    

Een zakelijke vraag aan RG Tegel? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow