Construction projects

Impressive co-creation centre sets the tone for new R&D campus

Het nieuwe cocreatiecentrum van Flanders Make in Kortrijk is een open, uitnodigend gebouw.
Het nieuwe cocreatiecentrum van Flanders Make in Kortrijk is een open, uitnodigend gebouw.

Kortrijk is a city on the rise. New developments are springing up like mushrooms to the west of the historic centre. To the north of the Leie, the focus is on luxury apartments, while a research campus dedicated entirely to technological innovation is taking shape south of the river. One of the first signs of this is the new Flanders Make co-creation centre, which is currently under construction. It is a promising project, as its forward-looking design creates endless possibilities …

Technology is the future, with digital twins, smart robotics and automation at the forefront. Following co-creation centres in Lommel, Leuven and Kortrijk, the Flemish drone federation in Sint-Truiden and core labs at the five Flemish universities, Flanders Make is also opening a site in Kortrijk this autumn. The aim is to test the latest Industry 4.0 technologies and manufacturing methods, enabling businesses to discover how they can invest in smart, future-proof factories and digitalise their production processes with ease. On 9 July 2021, Flemish Minister for the Economy and Innovation Hilde Crevits laid the symbolic first stone of the new co-creation centre in Kortrijk. At 6000 m²
it will be Flanders Make’s largest base. This state-of-the-art flagship is due to be ready for operation by the end of this year.

The Kortrijk co-creation centre is being built in a new district just outside the ring road, separated from the city centre by the Leie and a railway line. “A number of separate campuses have already been established on the site, but the city wants to strengthen this campus cluster, with Graaf Karel de Goedelaan as its central axis,” explains Max Herman, Head of Design at Jaspers-Eyers Architects. “The plan is to create several clusters with courtyards, around which a number of buildings will be grouped. The Flanders Make building is part of the first cluster. Graaf Karel de Goedelaan will also be transformed, with much more space set aside for greenery and active travel. A pedestrian and cycle tunnel under the railway, which has already been completed, connects the site to the new swimming pool complex and the rest of the city centre.” 

“Flanders Make’s dynamism and the way its functions are interwoven internally are also reflected in the façade architecture,” explains Max Herman.

A three-dimensional building

The new Flanders Make building is a rectangular, five-storey volume. The brief comprises laboratories, research and production spaces, as well as meeting rooms and offices. “We have created a compact, three-dimensional building with a horizontally layered architectural design, stacking and fitting together all the spaces and functions to create strong connections between them,” says Max Herman. “Most of the laboratories, research and production spaces, for example, are surrounded by offices and meeting rooms, allowing views into them and ensuring an open façade. In addition, the circulation zone at the front of the building continues up to the top floors, with views both in and out.”

“The building uses standard 3.5-metre floor-to-floor heights. Laboratories, research and production spaces are generally on the lower floors, with offices and meeting rooms on the upper floors, but the built-in spatial ‘interlocking’ and interweaving mean this is by no means set in stone. Some laboratories even span three floors. Most of level +3 is reserved for an Flanders Make office floor, including meeting rooms, a kitchenette and a cafeteria overlooking Graaf Karel de Goedelaan and the park opposite. Finally, there is an underground car park with space for one hundred bicycles and seventy cars, as well as charging points for electric vehicles.”

Façade design creates a strong identity

Seen from the outside, Flanders Make’s new co-creation centre is an open, welcoming building, with a lively, transparent façade facing the future courtyard. “Flanders Make’s dynamism and the way its functions are interwoven internally are also reflected in the façade design, giving the building and the rest of the site a strong identity,” explains Max Herman. 

“Strategically positioned windows and bands of glazing provide pleasant natural light throughout the building, even in the laboratory, research and production spaces. The solid sections of the façade are made of architectural concrete with a clean finish. In terms of massing, the building steps down from the railway towards Graaf Karel de Goedelaan and the eastern boundary of the plot. We have made the most of this cascading effect by providing spacious south-facing terraces. Since separating the different circulation flows was also a key consideration, the functions requiring loading and unloading facilities, access gates and goods lifts are located on the railway and river side. As a result, the site’s logistical activity will not detract from the building’s attractive appearance.”

As the different circulation flows are kept separate, logistical activity will not detract from the building’s attractive appearance.

Flexibility and sustainability are key

Another key strength of the new co-creation centre is its spatial and structural flexibility, which allows for a range of expansion and contraction scenarios. “We deliberately used long spans and perimeter column supports to create adaptable open spaces. The shape and massing of the building are, of course, fixed, but almost anything else is possible from a technical and functional point of view. Laboratories can therefore be quickly and efficiently converted into offices, and vice versa,” emphasises Max Herman. 

“We also set the bar high for sustainability. The co-creation centre meets BEN standards thanks to high-performance glazing, thick insulation and energy-efficient systems such as solar panels, a borehole energy storage (BEO) field with heat pumps, radiant ceiling panels, a Type D ventilation system and rainwater harvesting. All this made it a particularly enjoyable project. The collaboration with Flanders Make and the other parties involved was excellent, and we are eagerly awaiting the finished result!”    

Een zakelijke vraag aan Stadsbader? Get in touch

Who worked on it

Cocreatiecentrum Flanders Make Kortrijk in Kortrijk

  1. main contractorStadsbader
  2. clientSTADION: ION
  3. architectJaspers-Eyers Architects
  4. architectMODULO architects

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectCocreatiecentrum Flanders Make Kortrijk
  • SubjectConstruction projects
  • CompanyStadsbader
  • CompanySTADION: ION
  • CompanyJaspers-Eyers Architects
  • CompanyMODULO architects
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.