Industrial contractor delivers biggest-ever project in Bilzen
Text ediboImage edibo

In Bilzen, industrial contractor edibo has completed its biggest-ever project for property developer Logistics Capital Partners: more than 40,000 m² of new warehouses and 3,650 m² of offices. The project, led by project manager Kris Verbruggen and site managers Ruben Bloemen and Gilles Verhaert, was also delivered fully in line with BREEAM Excellent standards. This article takes a look behind the scenes at this remarkable construction site.
The impressive new-build complex rose over the past year on the border between Bilzen and Genk, right next to the Albert Canal. It comprises two warehouses totalling 40,555 m², 44 loading bays, six floors of office space totalling 3,650 m² and a 2,650 m² mezzanine. All in all, almost 47,000 m² of built-up area.
Although the building uses traditional industrial construction materials such as concrete and sandwich panels and steel-deck roof sheets, it still stands out. The steel structure, as well as the inner faces of the building’s façade and roof elements, were given a distinctive white finish. A long, narrow strip of polycarbonate at the front of the building brings in plenty of extra daylight.

Five major challenges
Edibo took charge of the entire construction process, including the external works. It was quite a feat, given the five challenges the industrial contractor had to contend with.
1. An unexpected plot twist
Work for edibo began in March 2022, with completion scheduled for a year later as a tight deadline. “We quickly won the client’s trust by offering firm guarantees that the materials for the concrete structure would be delivered on time,” says project manager Kris Verbruggen. “Even so, we had to draw on one of our greatest strengths several times to stay on track for the deadline: our flexibility. When work began, neither of the two warehouse units had a tenant under contract. But while we were erecting the structure for the first warehouse, we were suddenly told that a prospective tenant had come forward for the other one. Its construction was only scheduled for a later stage of the project. This plot twist meant we had to completely rework the schedule. To speed things up, we called on several workshop staff to help with the assembly work. At one point, fifteen of us were working on the installation, quite
a number.”
2. Flexible storage
With materials in short supply due to the pandemic and the war in Ukraine, edibo chose to have a great deal of material delivered to the site before work actually began, to ensure the project could be completed on schedule. This meant storing the materials and occasionally
moving them to a different location.
3. Rock-hard ground
Edibo installed gravel columns beneath the concrete floors as foundations. However, the ground was so hard that the gravel-column rig initially could not penetrate it, so pilot holes had to be drilled first.
4. Literally high voltage
During the assembly work, edibo also had to take additional safety measures because of the nearby high-voltage cables. As the power could not simply be switched off, or a large part of Bilzen would have been left without electricity, a specially adapted crane was brought in.
5. A slippery site
Later in the construction phase, edibo had to contend with a lot of mud. The site’s predominantly clay soil prevented rainwater from draining into the ground. This made the external paving works particularly challenging.

Building on its BREEAM pioneering work
The project also shows that edibo remains a pioneer in sustainable construction. In 2013, the industrial contractor completed its first-ever BREEAM-certified project in Belgium. Ten years later, achieving the highest BREEAM certification, BREEAM Excellent, for a major project such as the new warehouses and offices for Logistics Capital Partners is no mean feat. The following measures helped make it possible:
- All 70,000 m³ of crushed stone used for the earthworks was delivered by boat. This kept 3,500 lorries off the road.
- Instead of removing the soil, edibo treated it on site so it could be reused there.
- Water use on and around the site was monitored in detail.
- Noise measurements at the construction site helped minimise disturbance to people and wildlife;
- Edibo also planted trees and installed beehives on the project for local birds and bees.
“Proud”
“As a team, we can be absolutely proud that we delivered a project of this scale to the highest standards in such a short time, while also incorporating BREEAM sustainability requirements. The adaptability we demonstrated on this project proves that we are ready for any challenge. If you are looking for an industrial contractor to deliver your project, we would be delighted to hear from you,” concludes Kris Verbruggen.