Construction projects

Intelligent office building shaped by ecology and technology

Zuidwestgeoriënteerde hoek met vluchttrap op de zevende verdieping. 860 PV-panelen maken het gebouw nagenoeg het hele jaar door energieneutraal.
Zuidwestgeoriënteerde hoek met vluchttrap op de zevende verdieping. 860 PV-panelen maken het gebouw nagenoeg het hele jaar door energieneutraal.

VanRoey.be is a major ICT player in the Belgian market. The management of this tech company chose a new, sustainable workplace packed with technology: Kempus. After all, those who work in technology also appreciate a working environment equipped with intelligent tools.

A cubic shape has a proportionally smaller surface area of heat loss, so the building was constructed upwards rather than outwards.

The new headquarters on Kempenlaan in Turnhout has nine storeys (-1 to +7). Level -1 houses the car parks and building services plant. Level 0 is home to the ‘Digital innovation center’, which includes an evolving XR MetaVerse Experience space. Above this are six office floors with meeting rooms equipped with every possible communication tool. The seventh floor, almost 30 metres above ground, is reserved for shared high-tech meeting, event and conference spaces, the welcoming ‘Roeftop’ hospitality venue and a spacious south-west-facing terrace with spectacular views over the treetops, stretching as far as Turnhout’s charming town centre. 

White precast terraces, façades and canopies create an attractive architectural interplay of vertical and horizontal lines.

Designed for multiple lives

“We completed the seventh floor a month ahead of schedule and were genuinely overwhelmed by the magnificent panorama,” says Reginald Schellen, director of Schellen Architecten, which was responsible for both the design and construction. The building features load-bearing precast concrete façades on the outside. “This meant the spans could be achieved in a single operation,
columns were unnecessary, and we could build very quickly, completing one floor a week,” says Schellen. Inside, a central load-bearing precast concrete core (8 x 8 metres) houses the stairs, lifts, sanitary facilities and kitchens. “The compact core and absence of columns make the building flexible and adaptable.” Circular construction is becoming increasingly important. “The structure and layout of this project are so logical and straightforward that it can even serve multiple lives. For example, it could later be repurposed for the private housing market, or as a care or educational facility.”

The compact core and absence of columns make the building flexible and adaptable.

“Working with client VanRoey.be, we optimised the fit-out for efficiency and flexibility,” says Kevin Van Dyck, Senior Projectleider Bouwafdeling at vanhout.pro. “For example, we installed demountable raised floors with carpet tiles and modular glass partitions, making any future alterations relatively easy to carry out.”

Great Place To Work

“In June, together with various local construction companies, we completed this impressive piece of architecture alongside the existing building,” says Tom Hufkens, Marketing Manager at VanRoey.be. “At present, attracting and retaining IT specialists is a major challenge in the jobs market. With this intelligent, sustainable office building, we aim to create Belgium’s most attractive post-Covid workplace. The green surroundings and convenient location in the heart of the Kempen help us achieve that.” Guided by the company motto ‘employees make the company’, VanRoey.be likes to treat its many employees. And it pays off: the company is proud to hold the international ‘Great Place to Work® Certified’ label. “Our focus on so-called ‘new ways of working’ has certainly played a part. If we want employees to perform at their best, we also need to provide pleasant, flexible and fully ergonomic workspaces, complemented by inviting places to relax and enjoyable activities, outside the office too.” General manager Patrick Van Roey wholeheartedly agrees: “I can confirm that employee satisfaction has increased significantly since we moved into our new building.”      

On some floors, third parties occupy smaller units with their own fit-outs.

Intelligent means more than smart

VanRoey.be deliberately opted for a minimal footprint. The parking spaces are used to their full potential and fitted with electric vehicle charging points, while every effort is made to encourage cycling. “The same focus on energy efficiency informed our decision to make the building volume as compact as possible,” explains Schellen. “A cubic shape has a proportionally smaller surface area of heat loss, so the square floor plan measures 24 x 24 metres and the building rises upwards. Its height and striking architecture also give the building a kind of ‘gateway’ function at the N12/Turnhout Ring junction.”

The dynamic simulation carried out by Vörtgang resulted in heating and cooling via climate ceilings, connected to an open KWO system. “It’s an ingenious system that stores excess heat underground in summer, ready to be used for heating during the colder months. This groundwater energy reaches the various cooling ceilings via a heat pump and a network of small pipes, making heating and cooling highly efficient. In addition, CO2 levels are measured on every floor and ventilation is adjusted if necessary. The 860 PV panels make the entire building energy-neutral for most of the year, as no external energy is then required. Any surplus energy from the PV system is used to power the electric vehicle charging points. On average, we generate more energy than the building needs.” The demand-controlled system ensures that not a drop, or any other form of energy, goes to waste.

On even-numbered floors, the terraces are on the south façade, while on odd-numbered floors they run along the entire façade.

“A smart building uses sensors to create smart information silos, while an intelligent building brings all that smart information together in portals,” says Patrick Van Roey. “Kempus is more than a smart building. Bringing everything together in portals gives everyone involved in managing the building access to all the data and information. The construction team has succeeded in creating a building packed with technology without making it overly complex. All the information is accessible remotely, and the data can be used for various purposes. For example, the lighting control sensors show when everyone has left the building and the alarm system can be activated.”      

Climate ceiling with integrated LED lighting controlled by daylight and occupancy sensors. (Image: Vörtgang)

A close-knit construction team

From the design phase onwards, the various partners on the project, Schellen Architecten, vanhout.pro, building services engineering consultancy Vörtgang and the client, worked together as a close-knit construction team. Reginald Schellen: “From the outset, we looked for the optimal construction method, both in terms of speed and cost.” The entire project, including the building services, was modelled as efficiently as possible in BIM Revit. “In this respect, Schellen Architecten is a pioneering firm, which greatly benefited the collaboration,” says Kevin Van Dyck. “Once the principles had been finalised, we worked them up in technical detail with our precast suppliers. We worked particularly closely with our sister company Architon, which produced the load-bearing walls and the attractive white terraces. Prefaco supplied the predal walls for the central core, Fingo the hollow-core slabs and Tripan the white façade panels. We integrated all the suppliers’ production drawings into our BIM model, enabling us to resolve any potential clashes through clash detection and achieve an exceptionally low margin of error.” 

The plant room houses the heat pump, among other equipment, which is connected to an open KWO system.

The building services, coordinated by Vörtgang, were also added to the 3D model, allowing elements such as the risers to be built entirely off-site during the shell construction phase by subcontractor Belcotec. A total station was also used to link the 3D model digitally to the site, enabling vanhout.pro to set out and measure everything on site in detail. Kevin Van Dyck: “This resulted in an exceptionally smooth installation on site, and we even finished well ahead of schedule. This project is further proof of the value of working with BIM models and building the entire project virtually, and of the return on the associated investment. After the shell construction phase, we could rely on trusted, high-quality partners for the extensive external joinery (KA Construct from nearby Beerse) and the building fit-out.”

Each floor has four small and two larger meeting rooms, separated by glass partitions to preserve a sense of space and visual contact.

Still a need for new offices?

The building was completed during the Covid pandemic. “For a while, there was even some doubt about whether so many new offices would still be needed,” the architect says with a smile. “Fortunately, we all pressed on. One positive outcome of the pandemic was the addition of an external staircase to encourage employees not to always take the lift, as well as the terrace concept. On even-numbered floors, the terraces are on the south façade, while on odd-numbered floors they run along the entire façade. The terraces therefore serve three purposes: giving employees a place to get some fresh air while on the phone, providing solar shading and preventing fire from spreading across the façade. The terraces and the corner panels, set at 45°, are defining features of the building.”    

Stylish black-tinted walls and ceilings, together with the use of natural forms, give the reception area a warm feel.

Een zakelijke vraag aan VanRoey? Get in touch

Who worked on it

Kempus in Turnhout

  1. clientVanRoey
  2. architectSchellen Architecten
  3. main contractorvanhout.pro
  4. building services consultancyVörtgang
  5. aluminium buitenschrijnwerkKA Construct
  6. separate contractorBelcotec
  7. dragende wandenArchiton
  8. predalwandenPrefaco
  9. welfselsFingo
  10. witte gevelpanelenTripan

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKempus
  • SubjectConstruction projects
  • CompanyVanRoey
  • CompanySchellen Architecten
  • Companyvanhout.pro
  • CompanyVörtgang
  • CompanyKA Construct
Share this article