New sports fields, a multifunctional sports hall and a green play area for children: Lichtervelde has a new asset. The brand-new sports site offers young and old alike plenty of opportunities to enjoy sport and exercise. In consultation with the municipality, the architect opted for durable, low-maintenance materials with excellent thermal properties.

An accessible site with clear sightlines and architecture put to optimum use: that is a fitting description of the new sports site in Lichtervelde. At its centre is the multifunctional sports hall, a two-part complex with extensive glazing. The passage between the two halves of the building links the football pitches on either side. The roof projects 160 centimetres, providing shelter from both sun and rain. The steps beneath the overhang also serve as a covered stand, where enthusiastic supporters can give the sporty people of Lichtervelde an extra boost.

Het betonmeubilair wordt volop getest door de leerlingen van Het Kwadrant.

In consultation with the municipality, the architect opted for durable, low-maintenance materials with excellent thermal properties.

Modular construction

The new building is, of course, welcoming, not least thanks to the cosy cafeteria at one end of the main volume. Above all, however, it is multifunctional. “The building follows a fixed 120-centimetre rhythm, in line with the façade finish and the door openings. Only the side walls are load-bearing. The result is a flexible interior space,” explains Peter De Smet of Architectenbureau Bressers. “By choosing aluminium cladding for the façade, we also created a modern, durable building that is easy to maintain.” 

Efficient energy management is crucial to the building’s sustainability. This is reflected, among other things, in the photovoltaic panels covering the entire roof. All heat-loss areas are heavily insulated. The canopy also acts as solar shading, preventing overheating and eliminating the need for active cooling. “In addition, a combination of a heat pump and a high-efficiency condensing boiler, a solar water heater for domestic hot water, underfloor heating, LED lighting with occupancy detection and various water-saving measures ensure that the sports site is managed sustainably,” adds the architect.

A key feature of the building’s layout was lowering the judo hall, which is also fully glazed all around. This provides views into the hall and onto the tatami mats from the edge of the building. Visitors to the site, supporters and athletes can therefore watch the judo in action. Lowering the high-ceilinged judo hall maintains the building’s clean, horizontal architecture, including its continuous roofline.

Unforeseen remediation

The location of the sports site immediately presented the first and biggest construction challenge. The multifunctional building was erected on a former landfill site, and the impact this would have on the works was not entirely clear beforehand. “The ground turned out to be in a worse state than we had initially thought,” says Stefaan Gheysen of contractor Bouw & Renovatie. “The excavated soil had to be remediated. This set the construction schedule back by several months.”

Fortunately, assembly of the prefabricated structural elements then proceeded smoothly. In addition to the complete structural works, Bouw & Renovatie also carried out the interior joinery. “It was a project that fitted perfectly within our comfort zone, something our company has been familiar with for many years,” says Gheysen. 

A key feature of the building’s layout was lowering the judo hall, which is also fully glazed all around.

Project nearing completion

The finishing touches are currently being made to the landscaping and external works at the sports site. The B pitch for the football clubs is being completed. It has been relocated to make way for the new tennis court, and the hard surfacing is being laid. Lichtervelde is almost ready for its sporting renaissance. The large-scale works, which began in September 2017, will soon come to an end. Peter De Smet says: “This sports site is a perfect fit with Bressers’ vision. We always work at the intersection of new uses and existing contexts. We actively seek projects where we can bring these together. A site’s context is therefore extremely important, whether it is a residential project, sports infrastructure, a service centre or a protected monument. From new-builds to restoration projects.”    

Question about this story? Ask your question

Who worked on it

Sportsite Lichtervelde in Lichtervelde

  1. architectArchitectenbureau Bressers
  2. contractorBouw & Renovatie

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSportsite Lichtervelde
  • SubjectConstruction projects
  • CompanyArchitectenbureau Bressers
  • CompanyBouw & Renovatie
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.