17 March 2022 will forever remain a dark day in the history of Hoogmartens Wegenbouw. A devastating fire destroyed the company’s premises and most of its equipment. Yet the team managed to get back on its feet quickly and look to the future. And with good reason: barely four years later, a brand-new head office stands on the same site, alongside a multi-purpose hall, a new garage and a high-tech wash bay. The three-part complex symbolises the company’s resilience and proves that something beautiful can emerge even from the depths of adversity.

It was a tense time for Hoogmartens Wegenbouw after the extent of the damage caused by the inferno became clear. The office, workshop and equipment were gone: the toll was exceptionally high. Thanks to hard work and a strong sense of solidarity across the sector, with fellow contractors providing space, materials and machinery, the company managed to stay operational and complete its ongoing projects on time. An impressive feat. At the same time, it began considering the future. The decision was made to build a new head office on the familiar site in Oudsbergen, like a phoenix rising from the ashes.

Through main contractor Plus Construct, managing director Tom Hoogmartens was introduced to Contour Architecten. “Initially, the brief was simply to design a new office building, but it was substantially expanded later on,” says architect and partner Detlef Andries. “The existing garage for maintaining lorries and road construction machinery, which did not need to be demolished after the fire, played a crucial role. On the one hand, we proposed positioning the new office volume on the other side of the garage, giving it a more prominent location at the junction of Industrieweg-Noord and Nijverheidslaan. On the other hand, the garage no longer met current standards. This led to the decision to give it a new, multi-purpose function, including changing facilities, a canteen for the workers, a training room and a first-aid room, and to build a new garage with a high-tech wash bay alongside it. In other words, the complex comprises three separate buildings.”

The building reflects the company’s DNA.

A visual interplay of green and grey

To design the office building, the architects began with an organisational chart based on the company’s DNA. “We mapped in detail which members of staff, including administrative staff, the accountant, managers, estimators, sales managers and project managers, worked closely together. This helped us refine the spatial layout and arrive at an L-shaped ground floor, with its shorter side facing the street. We then designed the first floor as a projecting crossbar, which allowed us to create a covered walkway and entrance,” explains Detlef Andries.

“The choice of materials reflects Hoogmartens Wegenbouw’s craftsmanship. As the company likes working with concrete, it quickly became clear that we would start with a concrete plinth, combined with a lighter upper floor volume. The dark green cladding ties in with the company’s corporate identity, while the expanded metal cladding around the terrace serves not only as an architectural focal point but also as a balustrade. The visual interplay with the grey base works remarkably well, creating a robust yet refined whole. For the interior design concept, we worked closely with Dols, which further refined our initial proposal using its expertise and knowledge of construction. By carefully balancing building services, aesthetics and budget, we were able to develop the design choices, materials and technical solutions into a coherent whole. The result is an interior that is not only architecturally striking, but also practical and durable, with particular attention to materials, comfort and quality of finish.”

The interior is not only architecturally striking, but also practical and durable, with particular attention to materials, comfort and quality of finish.

Expansion with workshop and wash bay

That covers the office, but the project did not stop there. Contour Architecten also had to pull out all the stops for the new garage. “It is not simply a slab with a shed on top, as it incorporates a lot of building services, including service pits, ducts and underfloor heating, and we had to work around specific constraints, such as the permitted building height. In the end, we spent even longer on it than on the office building design,” says Detlef Andries. “It was also a major challenge to ensure that the floor levels flowed seamlessly between the different parts of the complex. That is why we made maximum use of BIM. We modelled both the structure and the building envelope in full 3D in advance, working closely with Plus Construct.

The engineering consultancy Van Herck Technics also played its part, enabling us to carry out clash detection down to the smallest detail.”

“Finally, the high-tech wash bay also deserves a special mention. It incorporates a lot of specialist equipment, including a full-depth sludge channel, buffer tanks and compressors. Most of it is housed in a separate compartment to avoid noise disturbance in the adjacent garage. One advantage was that most of the construction team had already been appointed before work began on site. This meant we could take full account of construction requirements in our 3D model. The end result speaks for itself!”

UMA Electrics: Electrical installations

It is better to have a good neighbour than a distant friend. This proved true for Hoogmartens Wegenbouw, which turned to UMA Electrics for all the electrical work at its new head office. “It was a complete project: electrical distribution boards, lighting, data cabling, the rooftop PV system, EV charging points and more. In collaboration with JOJO Systems, we also handled CCTV, access control and the intruder and fire alarm systems. This included all cabling and connections,” says managing director Frederick Ulenaers. “We are a growing company and now deliver some fairly large projects, but this one was exceptional in its overall scale. We laid more than 35 kilometres of cable in a year, which gives you an idea of the hours we put in. We managed to keep everything running smoothly and efficiently, to the great satisfaction of Hoogmartens and main contractor Plus Construct. We can certainly call this a flagship project for us: it is less than a 15-minute drive from our own base, and Hoogmartens is a well-known company in the region. We are very proud of it. Full credit to our technicians on site, who expertly brought this extensive project to a successful conclusion.”

Dols: Interior design

Hoogmartens Wegenbouw’s new head office looks immaculate not only from the outside. The interior is just as impressive, thanks to Dols’ expert interior design advice. “First, we contributed to the interior design concept and spatial layout, refining every room down to the smallest detail,” says Lynn Claessens, interior architect at Dols. “We also guided Hoogmartens through every stage of the interior fit-out and supplied the loose furniture. The design needed an industrial feel, while the office environment also had to have a distinct Hoogmartens identity. That is why we used concrete-effect accents in various places and chose green for both the stairwell and the boardroom. The end result is exactly what we had in mind. When I popped in again recently, I was delighted to see it. I also have very fond memories of working with Hoogmartens. They are lovely people who really valued our advice. The contractors and subcontractors involved were also always ready to resolve any issues. As a result, everything went exceptionally smoothly.”

TECHNICAL DETAILS‎‎

Client: Hoogmartens Wegenbouw (Oudsbergen)

Architect: Contour Architecten (Genk)

Main contractor(s): Plus Construct (Bree)

Een zakelijke vraag aan Hoogmartens N.V? Get in touch

Wie aan Kantoorgebouw Hoogmartens Oudsbergen werkte

  1. metalen klimaatplafondsysteemKreonMentioned in Kreon delivers innovative climate ceiling at Hoogmartens in Oudsbergen
  2. clientHoogmartensIn this story
  3. main contractorPlus ConstructIn this story
  4. architectContour ArchitectenIn this story
  5. elektrotechniekenUMA ElectricsIn this story
  6. interieurinrichtingDolsIn this story
  7. engineering consultancyVan Herck TechnicsIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKantoorgebouw Hoogmartens Oudsbergen
  • SubjectLimburg
  • CompanyHoogmartens N.V
  • CompanyPlus Construct
  • CompanyContour Architecten
  • CompanyUMA Electrics
  • CompanyDols
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.