A production facility fully tailored to the production process: this is what Luka Vleeswaren had built in Vilvoorde by construction company ASK…
Luka Vleeswaren had a production facility fully tailored to its production process built in Vilvoorde by construction company ASK Romein. The building was also designed with the future in mind. Both the overall building and every section inside it can be extended.
Luka is a meat processor based in Vilvoorde. Last year, the family business acquired MMG and set up a new company called Gallinis, Latin for poultry. Initially, Luka opted to renovate its site in Wallonia, but this option was soon abandoned because the building was very outdated. Luka brought in ASK Romein to build a new production facility in Vilvoorde.
“We didn’t simply put up a standard industrial building,” says Stan Debruyn, technical sales adviser at ASK Romein. “We started with a detailed analysis of the production process and designed the building on that basis.” ASK Romein delivered the project under a Design & Build contract. “It all comes down to close consultation with the client,” explains Stan Debruyn. “We combined our Design & Build expertise with Luka’s experience in meat processing.”

Every section of the building can be extended if production capacity needs to be increased.
Designing for change
The aim was to build for the future. “We started with a certain production capacity, but it had to be possible to expand it very quickly if Luka’s new market took off,” says Stan Debruyn. “The production process is a closed circuit. Consequently, each individual room had to be extendable, so enclosing rooms was out of the question. This means that any bottleneck in the production process can be removed immediately.” The entire meat-processing process, from the arrival of the meat through to final product finishing, is arranged around a central washdown area and storage space.
The production facility itself is a standard EPB-compliant industrial building. The interior layout was built using a box-in-box system, which means the internal fit-out can be relocated in its entirety. The building can also be extended in the future. ASK Romein deliberately positioned the production facility centrally on the site, allowing for extensions on all sides.
“It was quite a feat to develop the design,” says Stan Debruyn. “On the one hand, Luka wanted to expand its expertise in poultry production; on the other, a great many spaces had to be incorporated into the building. On top of that, everything had to comply with the standards of the Federal Agency for the Safety of the Food Chain (FAVV). Everything, from the building services to each individual machine, was modelled in BIM in advance. We consulted the machine manufacturers to ensure the machines were perfectly coordinated with the building and the required production capacity.”

The entire meat-processing operation is arranged around a central washdown area
and storage space.
Roads and building services
In addition to the building, ASK Romein also carried out the roadworks and installed all the building services for the client. “We began by excavating the site to a depth of 2 metres,” says Gunther Vranken, project manager at ASK Romein. “We then sieved, crushed and reused all the rubble on site to create the sub-base for the roads and production facility.” The production facility is EPB-compliant. The offices are heated and cooled using heat pumps, while the production facility is cooled with ammonia. A pipe bridge connects the new production facility to the existing building on the site.
A complex feat of engineering
The production facility was built between August 2018 and May 2019. Luka Vleeswaren is very pleased with the result, so much so that the company is considering subjecting its existing building to the same analysis and renovation. “This project demonstrates the added value of Design & Build. Our mission is always to design an industrial building tailored to the client’s needs, while relieving the client of as much of the burden as possible. We certainly succeeded! What looks from the outside like a standard industrial building is, in reality, a complex feat of engineering, fully tailored to the client’s requirements,” concludes Stan Debruyn.
Question about this story? Ask your question
Who worked on it
Productiehal Luka Vleeswaren Vilvoorde in Vilvoorde
- clientLuka Vleeswaren
- construction companyASK Romein
Keep following this
Get an email when a new story is published. No account needed.
- ProjectProductiehal Luka Vleeswaren Vilvoorde
- SubjectConstruction projects
- CompanyLuka Vleeswaren
- CompanyASK Romein