Modern high-bay warehouse as a beating logistics heart

When Alheembouw talks about its technical expertise, it is no empty claim. Around 60 engineer-project managers put their extensive technical knowledge into practice every day to deliver well-considered construction projects. For TVH R7, a brand-new high-bay warehouse more than 30 metres high, the engineering team designed the steel structure, among other things.

“This was no standard project, and that’s just the way we like it,” says Egon Braem, head of Alheembouw’s industrial division. “It is precisely on projects like these that we can demonstrate our added value. Drawing on our experience and knowledge, we fine-tune designs. In short, by making targeted, well-considered changes, the client pays less in the end without us having to compromise on our margins. To achieve the best possible result, we establish a strong working relationship with the architect and client from the outset.”

It was no different with TVH’s new high-bay warehouse. The client and contractor knew exactly what to expect from one another. Alheembouw had already worked for TVH on several occasions. “We very recently completed the new head offices,” says Egon Braem. “We hit it off from the very first time we worked together. We work well together and have an excellent relationship. We’re proud to be growing alongside TVH in this way.”

Design competition as a starting point
However, previous positive experiences did not mean TVH chose Alheembouw on autopilot. The main contractor had to prove itself. Architect Bruno D’Hondt organised a design competition for the high-bay warehouse. The steel structure and the link between the new R7 building and the existing, smaller R5 warehouse were among the features that won them over. Egon Braem explains: “Over the past few years, we have delivered around 35 high-bay warehouses. That has given us plenty of best practices, which TVH also benefits from. For other clients, we often take charge of the entire project, including automation. TVH is an exception in that respect: it has so much expertise and so many skills in-house, and selected other subcontractors from its own customer portfolio. Our focus here was therefore on the shell and core.”



Built on 640 foundation piles
Construction of the new building began with the floor slab. The high-bay warehouse extends around three metres below ground level, with a basement-like section. Considerable attention was paid to dewatering and draining the excavation to ensure it was completely watertight. Alheembouw then carried out the concrete work expertly, including in the basement. “It was an intensive and challenging job,” says Egon Braem. “The building is supported by 640 foundation piles. We used 3,000 m³ of concrete for the floor slab. To prevent settlement of the adjacent TVH R5 during dewatering, we installed a secant pile wall between the existing building and R7. This proactive approach is what sets us apart.”
Clear communication, efficiency and optimisation, the values that Alheembouw upholds, not only ensured that the deadline was met, but also brought completion forward slightly. And this was in far from straightforward circumstances. Construction began in mid-November 2020. By the end of August 2021, the high-bay warehouse, with a ridge height of 30.2 metres, was wind- and watertight. “Our client really needed the space. It comes naturally to us to make an extra effort in that situation and meet the agreed programme or, as in this case, bring it forward even further.”
Question about this story? Ask your question
Who worked on it
TVH R7
- main contractorAlheembouw
- architectBruno D’Hondt
- funderingstechniekenFranki Foundations
Keep following this
Get an email when a new story is published. No account needed.
- ProjectTVH R7
- SubjectConstruction projects
- CompanyAlheembouw
- CompanyBruno D’Hondt
- CompanyFranki Foundations