Construction projects

New-build surpasses the grandeur of the past

Het nieuwe kantoorgebouw werd geconcipieerd als een L-vormige enveloppe die de verschillende programmacomponenten op een functionele en ruimtelijk kwaliteitsvolle manier verenigt.
Het nieuwe kantoorgebouw werd geconcipieerd als een L-vormige enveloppe die de verschillende programmacomponenten op een functionele en ruimtelijk kwaliteitsvolle manier verenigt.

With the construction of a new headquarters, Securex is making a tangible contribution to upgrading the area around Watersportlaan in Ghent.

The design brings simplicity and technical ingenuity together. The result? A sustainable base where flexibility and comfort take centre stage, underpinned by a successful architectural concept that perfectly illustrates Securex’s forward-looking vision.

The north-east and north-west façades are relatively simple and uniform.

The original Securex headquarters was once an architectural showpiece that fitted perfectly into the Watersportbaan masterplan. But after sixty years, little of its former grandeur remained. In search of more space, comfort and energy efficiency, the well-known HR company opted for the most logical solution: demolishing the existing headquarters and replacing it with a state-of-the-art new building. For ARCH & TECO, however, this was no carte blanche to develop any concept they pleased. “On the contrary: we wanted to design an office complex that integrates with the historic modernist context of the Watersportbaan and connects with the surrounding urban fabric,” the architects explain. “Modularity, flexibility and sustainability were key considerations, architecturally, structurally and technically. For example, the new headquarters has an architectural concrete façade whose proportions and articulation reveal the underlying principles and structure of the building. It also serves a structural function, particularly on the south façades. The light, subtly nuanced colour of the concrete was also chosen to help the building blend into its surroundings.”

No fewer than 450 workstations have been provided, each with desks that can be used either sitting or standing.

A carefully considered façade design

The new office building was conceived as an L-shaped envelope that brings together the various programme components in a functional way while ensuring a high-quality spatial experience. Although the underlying concept is the same, the north- and south-facing façades differ slightly. The north-east and north-west façades are relatively simple and uniform, while the façades on the south-east and south-west sides are effectively doubled to accommodate the escape stairs and (escape) terraces. “The different design ensures that the south-facing façade sections are protected from the sun, while preserving the views over the Watersportbaan,” the architects explain. “At ground-floor level, the relationship between the interior and the outdoor surroundings is further emphasised by a double-height curtain wall with dark-framed windows.” 

The floors are linked in groups of two or three by central zones that serve as informal meeting places.

A well-planned layout

The architects also varied the roofline: one wing has four storeys, the other seven. This gives a gross floor area of around 8,500 m², significantly increasing Securex’s capacity at Sportwaterbaan. Most of the public-facing programme components are located on the ground floor, close to the main entrance. These include dedicated spaces such as client corners, meeting rooms and the restaurant. A conference room and training rooms are located on the first floor. The rest of the building accommodates 450 workstations, meeting rooms and ‘concentration pods’. “The floors are linked in groups of two or three by central zones that serve as informal meeting places,” the architects say. “Each includes a kitchenette, a seating area and/or a library. There is also a two-storey underground car park, directly connected to facilities with showers, toilets and lockers.”

A large spiral staircase is one of many eye-catching features in Securex’s new headquarters.

Against the clock

The new headquarters has not yet been handed over, but the aim is to achieve a BREEAM ‘Very Good’ rating. It is a passive office building heated and cooled using a BEO field connected to a thermally activated building structure system. Wyckaert, a class 8 contractor, is responsible for delivering the entire project, including the shell, finishes, building services and external works. Although the company has more than 130 years’ experience with large and complex projects, completing this remarkable building within the planned construction
period was a major feat. “Given the difficult lead-up, we inevitably had to work against the clock,” the company explains. “The tight deadline also meant we could not carry out measurements on site or wait for favourable weather conditions. Our team had to be creative to find a suitable solution to every scheduling challenge.”    

The façades on the south-east and south-west sides are doubled to accommodate the escape stairs and (escape) terraces.

A complex prefab puzzle

There were also several technical challenges to contend with. The façade had to be manufactured and installed simultaneously, which was no simple matter. It involved more than seven hundred decorative concrete façade elements and 223 aluminium windows, including a steel structure that had to be incorporated into the decorative concrete. “By sharing a joint 3D model between the various parties involved, we were able to coordinate all the elements fully in advance. This thorough preparation maximised productivity on site, as we no longer had to piece things together or wait for replacement elements to be made,” says Wyckaert.

A major effort, a brilliant result

The large volume of in-situ concrete was another important consideration. “As exposed concrete must be almost completely finished visually during the shell construction phase, it is vital that everyone in the chain has the right expertise and prepares the project meticulously,” Wyckaert explains. “Combined with a continuous drive to improve throughout the successive pours, this enabled us to achieve the desired result. These are just a few examples of the challenges involved in building Securex’s new headquarters. The project demanded a tremendous commitment from our staff, but it has ultimately become an excellent reference in our home city.”    

Project partners speak

Jadec: Security systems

Securex wanted more than an attractive, sustainable building offering a high level of comfort. Safety also received considerable attention. This part of the project was entrusted to Jadec (Lokeren), a small SME with a strong reputation for comprehensive security solutions. It was no coincidence: this specialist had also installed security systems at Securex’s other sites. “We also maintain all these installations,” says managing director Mike Scott. “The new headquarters is an important milestone for the group, and we were keen to be part of it. However, we could not take the contract for granted. Securex did request tenders from other companies. But the market analysis showed that Jadec offers highly competitive rates, giving us another opportunity to demonstrate our expertise. It was a substantial project, featuring a Bosec-certified fire detection system with five hundred detectors and 75 manual call points, integrated with the other building services. We also installed Bosec-certified aspirating detection beneath the raised floors and suspended ceilings, as well as an Incert-certified intruder detection system linked to other systems in the smart building. In addition, we installed an access control system on 125 doors, with card and smartphone readers, glass design speed lanes, a camera system and a networked intercom system with touchscreen external panels. The project also included barriers, traffic islands, control pedestals, a bicycle turnstile and design retractable bollards to close off the visitors’ car park outside working hours.”

PROJECT DETAILS

Client Securex (Ghent)

Architect ARCH & TECO (Ghent)

Main contractor(s) Wyckaert (Ghent)

Question about this story? Ask your question

Who worked on it

Hoofdzetel Securex Gent in Gent

  1. ClientSecurex (Gent)
  2. ArchitectARCH & TECO (Gent)
  3. main contractorWyckaert (Gent)
  4. BeveiligingstechniekJadec (Lokeren)

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectHoofdzetel Securex Gent
  • SubjectConstruction projects
  • CompanySecurex (Gent)
  • CompanyARCH & TECO (Gent)
  • CompanyWyckaert (Gent)
  • CompanyJadec (Lokeren)
Share this article