New landmark for the Port of Antwerp

Bringing together a mix of different functions in harmony while creating a true landmark for the Port of Antwerp.
That was Aertssen’s ambition, and the company now has an impressive headquarters with 70,000 square metres of warehouse space and 5,000 square metres of offices. The office volume above the warehouses has also become the standout feature of this remarkable project.

The Port of Antwerp is thriving. A major expansion is currently under way to make full use of the potential of this unique economic asset. The Aertssen Group was keen to be part of these ambitious plans. It appointed Mertens-architecten to design a forward-looking headquarters. Both parties have their roots in Stabroek, which helped forge a connection. “Aertssen was granted a concession for the entire front of the site, meaning the first façade line you see when coming from the expressway, and therefore the first thing you see when driving towards the port from East or West Flanders,” explains architect Stijn Mertens. “On a 230,000-square-metre site, we were able to meet Aertssen’s requirements and wishes perfectly: extensive outdoor storage for its transport fleet, large warehouse units and attractive office spaces.”

Optical illusion
The warehouse façades are built using a conventional combination of concrete and sandwich panels: functional industrial construction, delivered quickly with a clean finish. It is the office volume that takes the architecture to a higher level, both literally and figuratively. “We placed the offices above the warehouse level,” explains Stijn Mertens. “The technical units and plant rooms are integrated into the intermediate level. This enhances the offices’ floating effect and avoids having to put the building services on the roof. That is a welcome benefit for a building almost 30 metres tall. The office volume is the focal point of the entire site. We used rounded forms to make every side of the building attractive. The façade cladding is in Corian. It was not the most obvious choice, but unlike concrete, for example, Corian allowed us to round off the horizontal and vertical surfaces with ease. Its ease of maintenance is an added benefit for the client.”
The office volume is also defined above all by its large glazed façades and cantilevered terraces. These architectural choices helped shape the ambition to achieve BREEAM certification. The terraces also act as sunshades for the level below. You can walk all the way round the building on every floor, taking in a range of views, including the water and the port, and traffic flowing along the expressway through the polder landscape, to name just two. Passers-by, in turn, can enjoy the striking architecture, especially after dark, when the exterior lighting comes into its own, thanks to a carefully designed lighting scheme.

A circulation plan for smooth traffic flow
Even those familiar with projects in port areas can face specific challenges on individual developments. Aertssen’s project was no exception. “The site entrance is at the far end of the main building, while the large car park is by the road,” says Stijn Mertens, describing the situation. “To keep the traffic generated by the large machinery separate from that of office users and visitors, we carried out a mobility study together with Aertssen. This led to a loop-within-a-loop system. Industrial traffic uses the outer loop, while cars and cyclists can move safely around the inner loop.”
The large cantilevers of the floor plates also made the design complex. Mertens-architecten provided initial guidance in the concept design, then engaged an external consultancy to carry out the detailed structural study. “As design coordinator, we assemble a team for each project, bringing together all the creativity, specialist expertise and knowledge it requires, from our own staff and any external partners. We monitor everything closely and remain the client’s direct point of contact at every stage. It is a role we are happy to take on as a proactive, pragmatic design partner,” the architect concludes.

Project partners speak
Polypane: Glazing
A modern building must meet today’s standards. Insulating, functional glazing is an effective way to help achieve this. Aertssen turned to Polypane (Temse) for the job. “The office section features 1,200 square metres of Polycool Riviera NG60. This is solar-control glass with a light transmission of around 60 per cent, 28 per cent solar energy transmittance and a thermal insulation value of 1.0 W/m²K,” explains managing director Franky Symoens. “The insulating glass units are made with laminated safety glass on both the inside and outside. For the warehouses, the choice was Polyplus All Seasons 39, with a light transmission of 70 per cent, a solar factor of 38 per cent and a Ug value of 1.0 W/m²K. We also installed 550 linear metres of glass balustrades.” The building’s design called for facet glazing. Polypane took particular care to achieve a neat junction with the white façade cladding. It was no easy task, but the finished result made the Miraxvit installation team particularly proud.
Polypane Glasindustrie and its Miraxvit division carry out glazing work for façades and interiors. Polypane has recently completed complex glazing work for clients including Nike, De Persgroep and Gare Maritime. Its glass specialists are currently working on projects including Antwerp Tower, BNP Paribas’ new headquarters in Brussels and the new ING building in Louvain-la-Neuve.
Wever & Ducré: Lighting
DALI-controlled lighting offering top technical performance, subtle design, compliance with BREEAM standards and delivery within the agreed budget: this was the considerable challenge facing lighting partners Wever & Ducré and Xal. Together with interior architect Eef Debeuf, they developed a lighting scheme and supplied the right products. UNICO by Xal was chosen for the entire office environment. The luminaire has a slim, compact and distinctive design. Thanks to its innovative reflector technology, it offers 92.2 quadrillion possible configurations. With fourteen different reflectors to choose from, you can create a unique set-up of your own. Its low UGR rating and even light distribution make it easy to meet the standard for office environments. The lighting also responds to available daylight and movement in the room. The different variations create a visually coherent whole, while each brings its own qualities.
Value for money was also a priority. This led to the selection of mino 60 circle across all six floors, which also makes a striking feature when seen from outside. In the meeting rooms, subtle sasso 60’s provide functional light. Above the meeting tables are move it 25 profiles, a magnetic 48V track into which inserts can simply be clicked, allowing a flexible layout to be created in no time. Alongside Xal’s technical, functional lighting, Wever & Ducré luminaires bring engaging, decorative and playful elements to the entire building.
Alfa Cooling Technics: HVAC and plumbing
A 360° glazed external envelope and the pursuit of BREEAM certification bring their own challenges for heating, cooling and ventilation. Aertssen also placed great importance on the aesthetic finish and user comfort. Working closely with the client and architects, Alfa Cooling Technics (Lokeren) achieved a unique integration of all the building services, with ecology at the heart of the approach. The entrance areas on the ground floor, washrooms and drying room are fitted with underfloor heating, supplied by a heat pump combined with solar panels.

A Daikin VRV system was chosen to provide flexible climate control. This allows Aertssen to switch quickly between cooling and heating modes, which is essential in a building with a large proportion of glazed façades. Changing weather conditions have a significant effect on the indoor climate. The heating and cooling system maintains a stable indoor temperature even in these variable conditions. It also enables energy to be exchanged between rooms that need heating and those that need cooling, making it a highly energy-efficient system. The outdoor units of this air-to-air heat pump are connected via refrigerant pipes to indoor units concealed in suspended ceilings or false walls. Cooled or heated air enters the rooms through linear grilles running parallel to the glazing, helping to counter the effects of solar heat and cold.
The Daikin air handling units for the ventilation system are located on the technical intermediate floor. Energy recovery allows them to heat or cool fresh air efficiently before distributing it to the rooms through ductwork. Alfa Cooling Technics also handled the plumbing, from drainage and fire service pipework to a solar water heater for domestic hot water, as well as rainwater recovery for the toilets and pressure washers. “Good organisation and close consultation enabled us to deliver everything as required and on time. We will also remain a partner on the project in the coming years, providing maintenance and ongoing support,” adds managing director Jan Heirman.
PROJECT DETAILS
Client Aertssen Group (Stabroek)
Architect Mertens-architecten (Stabroek)
Main contractor(s) Cordeel (Temse)
Question about this story? Ask your question
Who worked on it
Hoofdzetel Aertssen Group in Antwerpen
- clientAertssen Group (Stabroek)
- architectMertens-architecten (Stabroek)
- main contractorCordeel (Temse)
- glazingPolypane (Temse)
- lightingWever & Ducré
- lightingXal
- HVAC and plumbingAlfa Cooling Technics (Lokeren)
Keep following this
Get an email when a new story is published. No account needed.
- ProjectHoofdzetel Aertssen Group
- SubjectConstruction projects
- CompanyAertssen Group (Stabroek)
- CompanyMertens-architecten (Stabroek)
- CompanyCordeel (Temse)
- CompanyPolypane (Temse)
- CompanyWever & Ducré