New sports complex achieves high financial and technical efficiency

Engineering consultancy BeHeCON aims to achieve the highest possible financial and technical efficiency in new-build projects. It does this by helping the construction team maximise its chances of making a profit on Engineering & Build projects. BeHeCON was responsible for the structural engineering of the new sports complex for Koninklijke Atletiekassociatie Gent. Hybrid foundations and several smart cost-saving measures improved efficiency during construction.
Gantoise hockey, tennis and padel club is to become the new main site of Koninklijke Atletiekassociatie Gent. This class 8 new-build project comprises a three-storey clubhouse, a hall with five indoor tennis courts and a stand from which to watch hockey, tennis and padel. The club on the Watersportbaan has more than 2,200 members. Engineering consultancy BeHeCON was responsible for the structural engineering of the project. Vandenbussche NV acted as main contractor, Vertongen Architecten was responsible for the design and BOPRO for project management.
Hybrid foundation
The clubhouse presented the biggest challenge for BeHeCON on this project. Its foundation was designed as a hybrid load-bearing structure: a mushroom slab on piles, combined with a general foundation slab on grade. “Plate load tests on the existing fill had shown that the slab could act as part of the foundation, without any need for additional compaction of the subsoil,” says Bert Hertleer, managing director of BeHeCON. “The slab on grade mainly supports the ground floor, while the first and second floors are supported by the piles.” The first and second floors feature flat concrete slabs supported by a limited number of concrete columns, allowing maximum flexibility in the layout of the various spaces.

As well as the clubhouse, BeHeCON also finalised the structure of the tennis hall. This is a glulam truss structure on piled foundations. The hall is divided by an expansion joint that also serves as a fire barrier, and is likewise founded on piles. “The stand, by contrast, is made entirely of precast concrete. This includes both the supporting walls, founded on unreinforced concrete strips, and all the stand and stair elements,” Hertleer explains.
Maximum financial and technical efficiency
BeHeCON focuses on producing accurate calculations and studies. For this new-build project, the consultancy mainly optimised the design by using a hybrid foundation for the clubhouse. “This enabled us to reduce the number of piles and the dimensions of the foundation, which account for a significant part of the cost. We also made savings by building on the existing fill rather than replacing it. By approaching the design as economically as possible, using creativity and out-of-the-box thinking, you not only cut construction costs but also shorten the construction period.”
The key to success lies in close collaboration with the contractor, from the preliminary stage and tendering through to construction. “For this project, Vandenbussche NV had already created a BIM model during the tender phase, and then produced another for the construction phase. This meant there was an opportunity for cost-efficient engineering at every stage.”
Question about this story? Ask your question
Wie aan Gantoise hockey-, tennis- en padelclub werkte
- main contractorVandenbussche NVIn this story
- architectVertongen ArchitectenIn this story
- Project managementBOPROIn this story
- nieuwe hoofdsiteKoninklijke Atletiekassociatie GentMentioned in New sports complex achieves high financial and technical performance
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGantoise hockey-, tennis- en padelclub
- SubjectConstruction projects
- CompanyVandenbussche NV
- CompanyVertongen Architecten
- CompanyBOPRO