New staff facilities, a showcase for customers

Impressive ceramic cladding, soft grey concrete panels and imposing expanses of glazing. The choice of building materials played a major part in making Van Hulle Bouwservice’s new building in Tielt a real eye-catcher.
The bold lines and split-level arrangement of the volumes undoubtedly play their part too. From Ringlaan, the eye is drawn almost instinctively towards the contemporary new building.
Words Stephanie Demasure | Photography Architectenbureau Naert, Valerie Clarysse
An industrial building in concrete and steel need not be predictable. Van Hulle’s new building makes that clear at first glance. Instead of a dull, uninspiring concrete block, Architectenbureau Naert developed a design featuring split-level volumes. The building blocks are playfully stacked on top of one another. The large cantilevers give the building a dynamic character.
The bold choices for the façade finishes complete the picture. With just over 2,000 square metres of glass, 1,000 square metres of ceramic façade panels and around 350 square metres of facing brick, Van Hulle did not opt for the easiest or most obvious solution. The client challenged its regular partners to come up with something original and creative. As a builders’ merchant, you have a strong professional network to draw on when you embark on a building project of your own.
Everything under one roof
For Van Hulle, the new building represents more than a substantial upgrade and greater visibility. It also makes day-to-day operations more efficient. Previously, staff worked in two separate office buildings, albeit next door to each other. Now, everyone has a place in the new complex. A well-organised warehouse was, of course, essential for selling building materials. This enables Van Hulle to serve both private customers and professionals quickly.
“As well as ensuring a smooth flow for sales, the client needed a functional showroom,” says architect Wouter Naert. “A showroom that encourages collaboration and brings people together. It needs to attract other companies and persuade them to incorporate their technologies and products too. This gives Van Hulle a stronger range of building products to offer and makes the company more visible to its own customers.” The offices are also interwoven with the showrooms through their split-level layout, and are integrated at the rear of the building. This keeps all the departments in contact with one another, encouraging the exchange of information.

The architectural design owes its character to the cantilevered canopies and
slender horizontal lines. (Image: Valerie Clarysse)
Easy to access
Van Hulle Bouwservice welcomes many visitors every day. Building anew also provided an opportunity to address parking pressures and traffic flow in and around the building. “Parking is provided across the full footprint of the building, for staff and visitors. This semi-underground car park is an asset to the site and its users. It is completely open along the street frontage and at the entrance. From R. Detavernierlaan, traffic splits, with one route leading to the car park and the other to the showroom and the rest of the site,” explains Wouter Naert. From the car park, visitors can reach the entrance via the large external staircase, or take the lift or internal staircase into the building. There is also access at the rear for cyclists and pedestrians.
At street level, the focus is on logistics and administration. The showroom is on the level above, slightly higher than Ringlaan, and immediately catches the eye of passers-by. It connects to the adjoining office spaces. A central corridor divides the showroom visually, making it easy to navigate. Continuing along this line, a wide staircase takes visitors to the showroom area on the upper floor. The other levels combine offices with showroom space. Van Hulle therefore has ample room to present products and technologies to customers in detail, with a total of 1,750 square metres of showroom space.
A ‘floating’ level was created above the showroom. This ‘top box’ offers several options for future expansion, but could also be used as a canteen, recreational space or venue for talks. This volume is separate from the showroom roof. It creates an attractive architectural line while also clearly separating it from the space above.
Internally, the open space between the showroom and the top box houses the building services.

The long spans and cantilevered floor slabs were achieved using post-tensioned slabs, creating a flat, beamless floor system.
Technical challenge
The architectural design owes its character to the cantilevered canopies and slender horizontal lines. These features also presented technical challenges. Wouter Naert explains: “To achieve this, we used post-tensioned concrete floors. This technique involves reinforcing floor slabs that are shuttered and poured on site with tendons, which are then tensioned hydraulically. This enabled us to create the large cantilevers without using beams.”
COBE ingenieurs was tasked with ensuring that the structural concept and calculations, including those for the tendons, were correct. As structural engineers, they played a crucial role in the successful delivery of the underground car park and curtain walls. “Our 3D calculation model added clear value to this project,” says Koen Vannevel, managing director of COBE. “The building is founded on piles and consists mainly of a frame of concrete columns and walls, coordinated with the parking spaces below. The long spans and cantilevered floor slabs were achieved using post-tensioned slabs, creating a flat, beamless floor system. The façades are made of glass, facing brick and sheet materials. This combination made the structural analysis particularly important. We developed the plans in REVIT STRUCTURE. The 3D calculations in Diamonds, Buildsoft enabled us to size the columns and stiff cores precisely, even though they are subject to axial forces and wind-induced bending.”
One additional complication was that the use of post-tensioned floors meant drilling was restricted in several areas. All building services and fixing materials therefore had to be drawn in advance, as changes would no longer be possible later. Thanks to clear communication and constructive collaboration between all parties, the construction process ran smoothly despite this added challenge.
Project partners speak
Belumeco: Aluminium frames
One of the eye-catching features of the new Bouwservice Van Hulle building in Tielt is undoubtedly its impressive glazed façade. The accompanying aluminium frames were made in Ardooie and make a fine calling card for Belumeco. Managing director Filip Vermeulen is pleased: “Yes, of course. This is an impressive, contemporary project, and we were delighted to be involved. I should add that we have built up a strong track record over the past few years. Our aluminium window and door profiles can also be found at Club Brugge’s Belfius Basecamp in Westkapelle, R-Plaza in Roeselare, and the headquarters
of Ardo and d’Arta in Ardooie.”
Belumeco has an impressive list of projects to its name. “And they are the best illustration of why we are right to focus on large-scale projects for contractors and architects. The basic principle is always the same: aluminium joinery is a craft. Keeping the entire production process in-house, from the first measurement to the finishing, is a deliberate choice that gives us control. And quality, too. Every project we take on is bespoke. When a company approaches a job with that attitude, it generally comes close to perfection. And perfection is, in fact, our trade,” says Filip Vermeulen.
Leonardo Fix: Façade panel fixings
A bespoke fixing system was needed to make the ceramic façade panels stand out to their best advantage. This was right up the street of Leonardo Fix in Lendelede. In addition to distributing coloured fixings and finishing profiles, the company specialises in designing support structures.
“Our in-house design team carried out the structural calculations and prepared the construction drawings for the entire support structure,” says managing director Bart Lips. “It is a task that requires you to take many factors into account: the load-bearing capacity of the anchors, the expansion of the profiles, the flexural strength of the profiles and the tiles themselves … This project also used prestressed hollow-core floor units. The position of the drilled holes for the anchors was therefore crucial. We had to make sure the tendons would not be damaged while the anchors were being installed. We did not do this alone. We consulted closely with the architect and the company responsible for installing the façade.”
Based on this detailed study, Leonardo Fix developed a project-specific fixing system and delivered the complete support structure to the site. It is a location they know very well. Van Hulle is one of the dealers of Leonardo Fix products, such as coloured screws, finishing profiles and insulation plugs.
PROJECT DETAILS
Client Van Hulle Bouwservice (Tielt)
Architect Architectenbureau Naert (Pittem, Zwevezele)
Main contractor(s) Vuylsteke, Eiffage (Meulebeke)
Engineering consultant COBE ingenieurs (Jabbeke)
Question about this story? Ask your question