Construction projects

Office expansion puts employee experience first

In tegenstelling tot het vorige kantoor, dat er strak en modern uitzag, heeft het nieuwe volume een warme en huiselijke stijl.
In tegenstelling tot het vorige kantoor, dat er strak en modern uitzag, heeft het nieuwe volume een warme en huiselijke stijl.

In ten years, Callens in Waregem has grown from 100 to 225 employees. To continue offering its ‘Calliërs’ an attractive place to work, the thermal solutions specialist expanded its head office. A striking three-storey extension has been built above the car park, putting employee experience at the top of the agenda since last year. 

A three-storey extension covering 2,500 m² was built above the existing car park.

Callens’ success story began in 1966, when self-employed plumber Willy Callens started installing central heating systems in private homes. He built a team that soon began specialising in businesses. Callens provided steam boilers and thermal oil boilers to heat production processes. The company established a reputation for its expertise, installation capabilities and service. In 2001, the second generation, Annick Callens and Windy Moerman, took the helm, driving further professionalisation. In 2008, Callens moved to Waregem, next to the E17. Architect Sven Goedefroo designed the office building. “Since then, our workforce has grown considerably, and CallensVyncke and Optimum by Callens have also become part of the Callens Group,” says Charlotte Roelens, Executive Assistant at Callens. “This created a need for additional office space. We were short of meeting rooms, among other things, and wanted to create a better experience for our staff.”

A warm, homely working environment

Several options were considered for the expansion, including adding another storey. Ultimately, architect Sven Goedefroo designed a 2,500 m², three-storey extension, built above the existing car park. “Unlike the previous office, which had a sleek, modern look, this one has a warm, homely feel,” says Charlotte Roelens. “We have embraced a new, flexible way of working.”

Staff helped shape the design of the new building.

Callens asked its staff what could be improved. This led to the creation of a gym, a relaxation room and a cafeteria, as well as seven meeting rooms, four concentration pits, four phone booths and two train seats. “Previously, we had one open-plan office, which could be frustrating at times,” says Charlotte Roelens. “Anyone who wants to make a private call can now retreat to one of the phone booths. The concentration pits are the opposite: separate study spaces where phones are not allowed. The train seats are small tables where four people can quickly get together.”

The meeting rooms were named after inventors and temperature scales, including Fahrenheit, Celsius and Watt …

A meeting and event venue with a spark

Callens, which specialises in industrial heating and air technology, also makes its work clear through the interior design. Framed reference photos are displayed, and the meeting rooms are named after inventors and temperature scales, including Fahrenheit, Celsius and Watt … “The slogans by the coffee machines also refer to temperature. The gym floor and staircase, meanwhile, are finished in Callens red.”

On the third floor, Callens created an event space with a sky bar, named Panoramix. Companies can hire it for training sessions, courses and events. “It has a commercial kitchen, so a caterer can work there easily. We have already hosted events for 200 people in the ‘Calliërsclub’,” says Charlotte Roelens. 

The nearly zero-energy office building is heated and cooled using concrete core activation.

A focus on an environmentally friendly workplace

The nearly zero-energy office building is heated and cooled using concrete core activation. “This keeps the temperature constant and eliminates peak loads,” says Project Engineer Bart Vanden Broucke. “The ventilation is CO2-controlled. When fewer staff are on site, it runs at a lower speed. We use LED lighting, and the walls are well insulated. Vertical louvres prevent the sun from affecting the building after 10 am. This means we need less cooling.” 

Outside, 100 additional parking spaces were added, including 32 electric vehicle charging bays. “We installed extra rainwater tanks with a capacity of 90,000 litres, bringing our total storage capacity to 250,000 litres,” says engineer Hendrik Desplenter. “We use the water not only to flush the toilets, but also to wash company vehicles. We never run short of water.”    

Een zakelijke vraag aan Stadsbader? Get in touch

Who worked on it

Kantooruitbreiding Callens Waregem in Waregem

  1. clientStadsbader
  2. main contractorCallens
  3. architectGoedefroo + Goedefroo Architecten

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKantooruitbreiding Callens Waregem
  • SubjectConstruction projects
  • CompanyStadsbader
  • CompanyCallens
  • CompanyGoedefroo + Goedefroo Architecten
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.